Difference between revisions of "Conformance and Guidance for Implementation/Testing"
Line 14: | Line 14: | ||
This section is for projects that are registered with the HL7 Project Office, and for which there are formal project scope documentation | This section is for projects that are registered with the HL7 Project Office, and for which there are formal project scope documentation | ||
*[[HL7 DSTU testing toolkit]] | *[[HL7 DSTU testing toolkit]] | ||
− | *[[Binding Syntax]] | + | *[[Binding Syntax]] - Joint with Vocab WG |
=== Current Activities === | === Current Activities === |
Revision as of 22:14, 24 November 2010
Note: during the May2007 WGM the Implementation Committee and the Conformance SIG became a new TC. See draft ImpConf Mission and Charter and Actions for ImpConf merger. The Implementation committee was formally wound up, and the Implementation Conformance TC (ICTC) was formed.
This wiki page is a merger of the content from the two committee's original wiki pages.
The HL7 Implementation committee supports HL7 members and other users of HL7 (draft) standard specifications, with the identification and resolution of issues related to successful implementation thereof.
This Wiki is used to develop an implementation FAQ, as well as a place to maintain and evolve ideas that have been discussed in committee. Formal minutes and agendas will still be maintained and posted to the HL7.org website - with this space providing for a more fluid development of content, where meeting notes will be fleshed out beyond what may heve been said in the meeting, and then used as the basis for other documents. The page history can be used to see what has been added since a particular meeting.
Contents
Implementation and Conformance Committee Projects
Approved Projects
This section is for projects that are registered with the HL7 Project Office, and for which there are formal project scope documentation
- HL7 DSTU testing toolkit
- Binding Syntax - Joint with Vocab WG
Current Activities
This section is for projects that are actively being developed in the Implementation committee
General
- ICTC SWOT-Analysis
- ICTC Strategic Plan
- Implementation Register
- Implementation Case Studies
- Mappings and Translations
V3
- Implementation FAQ
- Implementation Guide This is a short overview of what an IG will do
- V3 flattening tools
- V3 Online Testing
V2.x
File:V2UsageCodes1.3.pdf
together with Vocabulary
Prospective Projects
This section is for projects that have been considered in the Implementation committee and regarded as potentially useful, but for which there is no current activity:
- Implementation Guide Authoring Tool
Dormant Projects
These are projects that have been active, but which are not currently being progressed within the committee.
Closed Projects
These are projects that have been closed.
- Implementation Guides Project
- Implementation Guides This is a comprehensive list of known IGs with references
- V2.7
Committee agenda topics
- FAQs on the HL7.org website -- how are they maintained
Action Items
Please find below IC work group action items. They are categorized as Open and Closed.
Open Action Items
Please find below active action items that are currently open. The action items are captured in reversed chronological order i.e. most recent ones are on the top.
Source | Category | Description | Responsible Party | Status (Open, In Progress) | Date of Status | Update/Resolution | Other Group(s) | Due Date |
---|---|---|---|---|---|---|---|---|
11/08/2010 | Admin | Check to see if there is criteria for what work needs to have a project scope statements | Melva | Open | 11/15/2010 | |||
10/26/2010 | Admin | Review 3 year work plan | Open | |||||
10/26/21010 | Admin | Contact Tooling about possible joint meeting | Frank | Tooling | ||||
10/26/21010 | Admin | Update HL7 WGM agenda for Sydney | Melva | Open | To be discussed on Nov. 22nd | Prior to Holidays | ||
10/26/21010 | Project | Circulate list of current projects and request status | Frank | Open | ||||
Oct 2010 WGM | V2 | Status on 2.8 proposals to be confirmed | Rob | In Progress | 11/08/2010 | Review conformance section on V2.8 and existing proposal list & determine further actions need to be taken.
Project scope statement? |
||
Oct 2010 WGM | V2 | Proposal of how to assign OIDs for code systems in 2.x | Frank | Open | Consider project scope statement for this project | |||
Oct 2010 WGM | Admin | Discuss IC Facilitator with FTSD | Co-chairs | |||||
Oct 2010 WGM | Update RCnL document with changes identified | Frank | Open | |||||
Oct 2010 WGM | ArB | Post/provide latest version of ECCF | Melva/Ron Parker | Open | 11/15/2010 | Email sent to Ron Parker 2010/11/1 – no response | ArB | |
Oct 2010 WGM | ArB | Determine who will participate as liaison from ArB to ICWG project | Melva/
Ron Parker |
Open | ArB | |||
Oct 2010 WGM | Admin | Develop project statement and framework for working together (with ArB) | Melva/Ron Parker | Open | ||||
Oct 2010 WGM | V2 | Re-word test cases, create proposal to include in Chapter 2B | Rob | In Progress | 11/08/2010 | Link back to “Status on 2.8 proposals”. | ||
May 2010 WGM | V2 | Draft initial proposal for how to write implementation guides using a consistent common template. | Rob | Open | Consider project scope statement for this project | |||
May 2010 WGM | V2 | Develop initial template | Rob | Open | ||||
May 2010 WGM | ArB | Consider IHE technical terminology whitepaper into ECCF | Charlie | Open | ||||
May 2010 WGM | Vocab | Guidelines for the use of interface and reference terminology | Open | Consider project scope statement for this project | Vocab | |||
Sept 2009 WGM | V2 | Proposal #613: Conformance Profile version
Add metadata attribute to specify the schema for the profile; that is which conformance profile does this schema follow (currently 2.5, 2.6, 2.7). Attach a segment version indicator. Therefore you could have a profile that was for a 2.4 message but have a particular segment that was for a different version |
Rob | Open |
Closed Action Items
Please find below action items that are closed and required no further actions. The action items are captured in reversed chronological order i.e. most recent ones are on the top.
Source | Category | Description | Responsible Party | Status (Completed, Cancelled) | Date of Status | Update/Resolution | Other Group(s) | Due Date |
---|---|---|---|---|---|---|---|---|
10/26/2010 | Admin | Create action log on wiki | Wendy | Completed | 11/19/2010 | Action log now posted on the wiki. | ||
10/26/2010 | Admin | Confirm SD Joint Meeting | Melva | Completed | 11/15/2010 | Email sent to SD Co-Chair | Struc Docs | |
10/26/21010 | Admin | Contact ITS - remove request for joint meeting | Melva | Completed | 11/15/2010 | Email sent to ITS Co-Chair. Consider possible joint meeting in the future | ITS | |
10/26/21010 | Vocab | Send list of vocab topics to Frank | Wendy | Completed | 11/03/2010 | Vocab | ||
Oct 2010 WGM | Admin | Request room availability for Sydney | Melva | Completed | 11/08/2010 | |||
Oct 2010 WGM | Admin | Schedule further discussion via teleconference | Melva | Completed | 11/08/2010 | |||
Oct 2010 WGM | Admin | Reschedule discussion of January 2011 WGM planning | Completed | 11/08/2010 |
Documents
- Implementation FAQ
- Test Cases
- Implementer Workshops
- Product V3 RCL
These documents are open documents for editing by any interested party:
- Conformance User Guide
- Conformance Implementation Manual
- Conformance Discussion
- Conformance Datatype Specialization Constraints
- Conformance FAQ
- Conformance Glossary
- Conformance Statement
- Eclipse OHF Conformance Questions
- Constraint Language
- CWE
NICTIZ have created an implementation oriented discussion document related to conformance and artefact versioning:
Documents maintained by other committees
The following documents may be of interest / relevance to implementers, and you are encouraged to read / review / correct / improve them
External documents
- Example implementation guide
- IHE PIX-PDQ v3 Profile (english)
- Examples:
- CDA Release 2, see [1] (10 Mb) for a collection of CDA R2 examples, stylesheets and implementation guides. Examples from various realms. A more up-to-date version of this example collection is available here.
- Normative Edition 2006 examples and schema, see NE2006 Examples. The examples include examples from multiple Realms for multiple domains (e.g. Patient Admin, Lab, Medical Records)
- May2006 Ballot schema and schema, see German Realm May2006 Examples. Most examples are related to Patient Registries or Financial Coverage. Some schema have been constrained to fit the requirements of the German realm.
- NICTIZ (AORTA) schema and examples (mostly based on ballot 7), see Dutch Realm Ballot7 Examples. Most examples are related to PA, Pharmacy, Patient Care.
- "Navigating the pitfalls: Implementing HL7 version 3", edited by Rene Spronk, see Ringholm whitepaper. The contents have been included in the Implementation FAQ.
Testing Facilities
- NIST has installed a testserver for conformance testing of the POLB_IN111100 interaction (using May 2006 schema). E-mail your order message to v3receiver@gmail.com and it will respond with a one or more v3 interactions.
- Australian Healthcare Messaging Laboratory (AHML) - HL7 Testing and Certification Services
Working Group Meeting Agendas
- ICTC Jan 2011 WGM Agenda Sydney, Australia
- ICTC Oct 2010 WGM Agenda Cambridge
- ICTC May 2010 WGM Agenda Rio de Janeiro, Brazil
- ICTC Jan 2010 WGM Agenda Phoenix
- ICTC Sep 2009 WGM Agenda Atlanta
- ICTC May 2009 WGM Agenda Kyoto, Japan
- ICTC Jan 2009 WGM Agenda Orlando
- ICTC Sept 2008 WGM Agenda Vancouver, Canada
- ICTC May 2008 WGM Agenda Phoenix
- ICTC Jan 2008 WGM Agenda San Antonio
- ICTC Sept 2007 WGM agenda Atlanta
- Implementation May 2007 WGM agenda
- we have started maintaining the agendas within the Wiki with the Cologne mtg 05/2007!
- Jan 2007 WGM Agenda and Lunch
Meeting Minutes
Conference Call Agenda and Minutes
Open Issues:
outdated links
The following links are provided for convenience but should not be used any more!