This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Infrastructure and Messaging"

From HL7Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
The mission of the Infrastructure and Messaging TC (InM) is to provide the infrastructural support required in order for systems to exchange [[domain content]] as specified by HL7.
 
The mission of the Infrastructure and Messaging TC (InM) is to provide the infrastructural support required in order for systems to exchange [[domain content]] as specified by HL7.
 
== Current Agendas and Minutes==
 
== Current Agendas and Minutes==
 +
*[[20180103_inm_agenda | January 3, 2018 InM Agenda]]
 
*[[20171122_inm_agenda | November 22, 2017 InM Agenda]]
 
*[[20171122_inm_agenda | November 22, 2017 InM Agenda]]
 
*[[20171108_inm_agenda | November 8, 2017 InM Agenda]]
 
*[[20171108_inm_agenda | November 8, 2017 InM Agenda]]

Revision as of 16:34, 2 January 2018

This is the main page of the Infrastructure and Messaging (InM) TC, formerly known as the Control Query (CQ) TC.

The mission of the Infrastructure and Messaging TC (InM) is to provide the infrastructural support required in order for systems to exchange domain content as specified by HL7.

Current Agendas and Minutes

Old logistics Including V2.9 Recon


Active Projects

Committee Documents

These documents are open documents for editing by any interested party:

Scheduling proposal:InM Scheduling

The following are the open actions items for InM.

The following collaborative documents are edited by the InM co-chairs:\

Old Stuff waiting for re-organization

Other Documents

These documents are listed here for reference purposes: