This wiki has undergone a migration to Confluence found Here
Difference between revisions of "Infrastructure and Messaging"
Jump to navigation
Jump to search
Smrobertson (talk | contribs) |
|||
Line 20: | Line 20: | ||
*[[INM Closed Action Items]] | *[[INM Closed Action Items]] | ||
*Work-in-process: [[:category:InM Action Items|InM Action Items]] | *Work-in-process: [[:category:InM Action Items|InM Action Items]] | ||
+ | *[[:category:InM Open proposals]] | ||
+ | |||
The following collaborative documents are edited by the INM co-chairs: | The following collaborative documents are edited by the INM co-chairs: |
Revision as of 21:29, 8 October 2007
This is the main page of the Infrastructure and Messaging (INM) TC, formerly known as the Control Query (CQ) TC.
The mission of the Infrastructure and Messaging TC (INM) is to provide the infrastructural support required in order for systems to exchange domain content as specified by HL7.
Committee Documents
These documents are open documents for editing by any interested party:
- Workitems: INM Workitem category
- INM Glossary Category:INM Glossary
- Wrappers R2 project
- Open ATS Issues
The following are the open actions items for INM.
- INM Transmission and Transport Action Items (MCCI, ATS, Messaging Infrastructure)
- Other INM Action Items
- INM Closed Action Items
- Work-in-process: InM Action Items
- category:InM Open proposals
The following collaborative documents are edited by the INM co-chairs:
- INM ballot planning
- INM Atlanta Agenda (for reference only: INM Cologne Agenda)
- INM WGM co-chair Schedule
- INM Work Distribution
- INM Telcon Chores
Other Documents
These documents are listed here for reference purposes: