This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Infrastructure and Messaging"

From HL7Wiki
Jump to navigation Jump to search
Line 18: Line 18:
 
*[[INM Action Items|Other INM Action Items]]
 
*[[INM Action Items|Other INM Action Items]]
 
*[[INM Closed Action Items]]
 
*[[INM Closed Action Items]]
*[[INM Closed Action Items AFTER Boca Raton]]
+
*[[INM Closed Action Items - closed latest during the September 2007 WGM]]
  
  

Revision as of 13:36, 21 September 2006

File:Im cables.jpg
Infrastructure


This is the main page of the Infrastructure and Messaging (INM) TC, formerly known as the Control Query (CQ) TC.

The mission of the Infrastructure and Messaging TC (INM) is to provide the infrastructural support required in order for systems to exchange domain content as specified by HL7.

Committee Documents

These documents are open documents for editing by any interested party:

The following are the open actions items for INM.


The following collaborative documents are edited by the INM co-chairs:

Other Documents

These documents are listed here for reference purposes: