This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "20130717 FMG concall"

From HL7Wiki
Jump to navigation Jump to search
Line 33: Line 33:
 
*Roll Call
 
*Roll Call
 
*Agenda Check
 
*Agenda Check
*Minutes from [[2013mmdd_FMG_concall]]  
+
*Minutes from [[20130703_FMG_concall]] , [[20130626 FMG concall]]
 +
*Notes from [[20130710_FMG_concall]]  
 
*Administrative
 
*Administrative
 
** Action items
 
** Action items
***   
+
***  FMG normalized concept in T3SD vs FTSD and a narrative definition clarifying scope vs. other WGs.
 
*Reports
 
*Reports
 
**Connectathon management (David/Brian)
 
**Connectathon management (David/Brian)
 
**[[FHIR Governance Board|FGB]] –  
 
**[[FHIR Governance Board|FGB]] –  
 +
***FGB passed a motion:
 +
***:Where a resource cannot be evolved and its definition developed between WGMs and the sponsoring WG cannot make progress, then the FMG can determine the resource responsibility must be assigned to the Core Team. That assignment can be appealed to the FGB for consideration.
 +
***[http://gforge.hl7.org/gf/download/docmanfileversion/7321/10412/VitalityAssessment101March2013.pptx Vitality Assessment model] - coming up with metrics
 
**MnM –  
 
**MnM –  
 
**[[FMG Liaisons]] –
 
**[[FMG Liaisons]] –
<!--
 
*Precepts
 
**
 
-->
 
 
*Process management
 
*Process management
 
**Ballot Planning
 
**Ballot Planning
<!--**Developing FMG Management Methodology - see [[FHIR Methodology Process]] and [[FHIR Guide to Designing Resources]]
+
***[[:Category:FHIR_Resource_Proposal|FHIR resource proposals]] writeup status and review status
**FHIR Design patterns - see [[FHIR Design Patterns]] -->
+
***Ballot readiness and QA call scheduling
**Ballot content review and QA process [[FHIR QA Guidelines]]
+
***Scope boundaries discussion continued
 
*AOB (Any Other Business)
 
*AOB (Any Other Business)
  

Revision as of 15:01, 17 July 2013

HL7 TSC FMG Meeting Minutes

Location: call 770-657-9270 using code 985371#
https://global.gotomeeting.com/join/450662277

Date: 2013-07-17
Time: 1:00 PM U.S. Eastern
Chair: Note taker(s):
Quorum = chair + 4 yes/no
Co chairs Hugh Glover Lloyd McKenzie
ex-officio Ron Parker, FGB Chair . John Quinn, CTO
Members Members Observers/Guests
Lorraine Constable John Moehrke Lynn Laakso, scribe
Jean Duteau Brian Pech Austin Kreisler
David Hay
.

Agenda

  • Roll Call
  • Agenda Check
  • Minutes from 20130703_FMG_concall , 20130626 FMG concall
  • Notes from 20130710_FMG_concall
  • Administrative
    • Action items
      • FMG normalized concept in T3SD vs FTSD and a narrative definition clarifying scope vs. other WGs.
  • Reports
    • Connectathon management (David/Brian)
    • FGB
      • FGB passed a motion:
        Where a resource cannot be evolved and its definition developed between WGMs and the sponsoring WG cannot make progress, then the FMG can determine the resource responsibility must be assigned to the Core Team. That assignment can be appealed to the FGB for consideration.
      • Vitality Assessment model - coming up with metrics
    • MnM –
    • FMG Liaisons
  • Process management
    • Ballot Planning
      • FHIR resource proposals writeup status and review status
      • Ballot readiness and QA call scheduling
      • Scope boundaries discussion continued
  • AOB (Any Other Business)

Minutes

Next Steps

Actions (Include Owner, Action Item, and due date)
Next Meeting/Preliminary Agenda Items



Back to FHIR_Management_Group

© 2013 Health Level Seven® International