INM Pre-May WGM out-of-cycle Meeting
INM will hold an out-of-cycle meeting (the board has approved it) related to Transmission and Transports in San Antonio immediately prior to the WGM.
Dates: Saturday May 6 Q1-Q4, and Sunday May 7 Q1 & Q2. Location: The WGM conference hotel. The meeting room has a 35-person capacity.
Topics
Our intent is to do mini-harmonization for the Transmission and Transport domains, and in addition, to find solutions for some of the festering issues that exist in the overlapping areas between these areas. These issues are long running issuesthat do not fit well into the ballot process, and we have been struggling to find time or a process to give them any substantial consideration.
There is a large number of outstanding issues. Generally,there is a scope question relating the concept of interactions, transmissions, transports, how they inter-relate with each other, and how the historical HL7 approach relates to approaches taken in other industries or by other standards bodies (note that we use these other standards for actual transport).
See below for an agenda; also see the list of confirmed attendees.
Agenda (Draft)
The agenda for Saturday Q4 and Sunday Q1/Q2 will be determined by "triaging" the open issues list at the start of the Saturday Q4 meeting. Discussions during SAT Q1-Q3 will be timeboxed to allow a number of issues to be discussed. Motions may be made by partcipants once consensus has been reached on an issue.
If consensus can't be reached within the alloted timneframe, participants may be asked to create a proposal during Saturday evening to be voted upon on Sunday, or the issue may be deffered from Saturday until Sunday. The aim is to reach consensus on fundemantal open issues, or at least to get a sense of direction by means of a strawvote.
Saturday 6 May
- Q1 Overview & ATS
- (first 15 minutes) Setting the scene - overview of approach (Miroslav will create initial draft)
- ATS - issues
- Overview: Miroslav will present an overview of open ATS issues. See Open ATS Issues.
- Topic: Revised HL7 Messaging Infrastructure. Intraduction of the main components, layers and features
- Topic: ATS Glossary definitions
- Topic: When are 2 messages "the same"? See known issues on the Transmission.id page.
- Q2 SOA - issues
- 1. Overview: The SOA SIG will present a whitepaper with an overview of the various issues, the charter and overall approach being proposed.
- 2. Open discussion on the overall approach (timeboxed!)
- 3. SOA4HL7 Requirements
- 4. Methodology for defining services and creating service implementations, including approaches to conformance and profiling
- 5. Infrastructure / Framework (including discussion of v3 Artefacts that should be left to other protocol and technology standards)
- (SOA4HL7 group will continue to revise this part of agenda)
- Q3 MCCI - issues
- Overview: the INM co-chairs will present an overview of open MCCI issues. See Open Transmission Wrapper Issues and Open Control Act Issues.
- Topic: Transmission Addressing (at all levels and layers)
- Topic: Interaction Pattern (abstract) and Transmission Pattern (HL7 Messaging Architecture) - useful? or change definitions?
- Topic: make ControlAct.id mandatory, use to link responses at the business process level.
- Topic: is Batch a unit of processing (i.e. does it exist at the abstract level) or is it just a Transmission grouper?
- Topic: MCCI R2 Requirement that transports be reliable, set acceptActCode to ER
- Topic: overlapping functionality between HL7 & the transport protocol (e.g. reliability, commit ack, sequence number protocol)
- Topic: (after SOA discussions): create a HL7 Messaging Architecture document instead of ATS, group with MCCI in 1 ballot?
- Topic: (after SOA discussions) It has been suggested by proponents of SOA architectures that the current Transmission Wrapper contains classes and attributes which are not related to Transmission. Where should these be moved to?
- Topic: MCCI Glossary definitions
- Overview: the INM co-chairs will present an overview of open MCCI issues. See Open Transmission Wrapper Issues and Open Control Act Issues.
- Q4 Open
- Agenda planning Q4 and SUN Q1,Q2: Determine priorities and quarters when as-yet undiscussed topics should be discussed
Sunday 7 May
- Q1 Open
- Agenda planned SAT Q4
- Q2 Open
- Agenda planned SAT Q4