This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Infrastructure and Messaging"

From HL7Wiki
Jump to navigation Jump to search
Line 7: Line 7:
 
The mission of the Infrastructure and Messaging TC (InM) is to provide the infrastructural support required in order for systems to exchange [[domain content]] as specified by HL7.
 
The mission of the Infrastructure and Messaging TC (InM) is to provide the infrastructural support required in order for systems to exchange [[domain content]] as specified by HL7.
 
== Agendas/Minutes==
 
== Agendas/Minutes==
*[[20130909_inm_agenda | Septemer 9, 2013 Agenda]]
+
*[[20131007-inm-agenda | October 7, 2013 agenda
 
----
 
----
 
*[[http://www.hl7.org/Special/committees/inm/minutes.cfm Minutes]
 
*[[http://www.hl7.org/Special/committees/inm/minutes.cfm Minutes]

Revision as of 19:40, 7 October 2013

File:Im cables.jpg
Infrastructure


This is the main page of the Infrastructure and Messaging (InM) TC, formerly known as the Control Query (CQ) TC.

The mission of the Infrastructure and Messaging TC (InM) is to provide the infrastructural support required in order for systems to exchange domain content as specified by HL7.

Agendas/Minutes

  • [[20131007-inm-agenda | October 7, 2013 agenda

Active Projects

Committee Documents

These documents are open documents for editing by any interested party:

Scheduling proposal:InM Scheduling

The following are the open actions items for InM.

The following collaborative documents are edited by the InM co-chairs:\

Old Stuff waiting for re-organization

Other Documents

These documents are listed here for reference purposes: