This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "20140108 FMG concall"

From HL7Wiki
Jump to navigation Jump to search
(Created page with "{{subst::FMG Template}}")
 
Line 1: Line 1:
 
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC FMG Meeting Minutes''' <br/>
 
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC FMG Meeting Minutes''' <br/>
 
'''Location: call 770-657-9270 using code 985371#'''<br>https://global.gotomeeting.com/join/450662277
 
'''Location: call 770-657-9270 using code 985371#'''<br>https://global.gotomeeting.com/join/450662277
| width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2014-mm-dd '''<br/> '''Time: 1:00 PM U.S. Eastern'''
+
| width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2014-01-08'''<br/> '''Time: 1:00 PM U.S. Eastern'''
 
|-
 
|-
 
| width="0%" colspan="2" align="right"|'''Chair''':  
 
| width="0%" colspan="2" align="right"|'''Chair''':  
Line 33: Line 32:
 
*Roll Call
 
*Roll Call
 
*Agenda Check
 
*Agenda Check
*Minutes from [[2014mmdd_FMG_concall]]  
+
*Minutes from [[20131218_FMG_concall]]  
 
*Administrative
 
*Administrative
 
** Action items
 
** Action items
***   
+
***Need to combine criteria at [[FHIR Connectathons]] with [http://wiki.ihe.net/index.php?title=Connectathon_Principle distinction of connectathon versus hackathon] and come up with process.
 +
***Paul, Brian and Lorraine draft some suggested policy points for review by FMG in January (8th?) and forward to FGB or TSC
 +
***Hugh will take some excerpts from his presentation to HL7 UK and create a wiki page
 +
***Liaisons must also notify their groups that the RIM Mappings will be developed (mostly in the domain areas, not infrastructure) and may need their involvement or review  
 +
***Hugh to draft text of motion for decision criteria whether to bring FHIR back to another ballot
 
*Reports
 
*Reports
 
**Connectathon management (David/Brian)
 
**Connectathon management (David/Brian)
Line 42: Line 45:
 
**MnM –  
 
**MnM –  
 
**[[FMG Liaisons]] –
 
**[[FMG Liaisons]] –
<!--
 
*Precepts
 
**
 
-->
 
 
*Process management
 
*Process management
**Ballot Planning
+
*Ballot review and QA process [[FHIR QA Guidelines]]
<!--**Developing FMG Management Methodology - see [[FHIR Methodology Process]] and [[FHIR Guide to Designing Resources]]
 
**FHIR Design patterns - see [[FHIR Design Patterns]] -->
 
**Ballot content review and QA process [[FHIR QA Guidelines]]
 
 
*AOB (Any Other Business)
 
*AOB (Any Other Business)
  
Line 65: Line 61:
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
  
 
+
[[20140115 FMG concall]]
 
|}
 
|}
  

Revision as of 14:53, 7 January 2014

HL7 TSC FMG Meeting Minutes

Location: call 770-657-9270 using code 985371#
https://global.gotomeeting.com/join/450662277

Date: 2014-01-08
Time: 1:00 PM U.S. Eastern
Chair: Note taker(s):
Quorum = chair + 4 yes/no
Co chairs Hugh Glover Lloyd McKenzie
ex-officio Ron Parker, FGB Chair . John Quinn, CTO
Members Members Members Observers/Guests
Lorraine Constable Paul Knapp John Moehrke Lynn Laakso, scribe
David Hay Josh Mandel Brian Pech Austin Kreisler
.

Agenda

  • Roll Call
  • Agenda Check
  • Minutes from 20131218_FMG_concall
  • Administrative
    • Action items
      • Need to combine criteria at FHIR Connectathons with distinction of connectathon versus hackathon and come up with process.
      • Paul, Brian and Lorraine draft some suggested policy points for review by FMG in January (8th?) and forward to FGB or TSC
      • Hugh will take some excerpts from his presentation to HL7 UK and create a wiki page
      • Liaisons must also notify their groups that the RIM Mappings will be developed (mostly in the domain areas, not infrastructure) and may need their involvement or review
      • Hugh to draft text of motion for decision criteria whether to bring FHIR back to another ballot
  • Reports
  • Process management
  • Ballot review and QA process FHIR QA Guidelines
  • AOB (Any Other Business)

Minutes

Next Steps

Actions (Include Owner, Action Item, and due date)
Next Meeting/Preliminary Agenda Items

20140115 FMG concall


Back to FHIR_Management_Group

© 2014 Health Level Seven® International