This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "20130227 BAM Modeling"

From HL7Wiki
Jump to navigation Jump to search
Line 15: Line 15:
 
|-
 
|-
 
| colspan="1" align="right"|'''Facilitator'''
 
| colspan="1" align="right"|'''Facilitator'''
| colspan="1" align="left"|Ron
+
| colspan="1" align="left"|
 
| colspan="1" align="right"|'''Note taker(s)'''
 
| colspan="1" align="right"|'''Note taker(s)'''
 
| colspan="1" align="left"|Lynn
 
| colspan="1" align="left"|Lynn
Line 37: Line 37:
 
===============================================================================--->
 
===============================================================================--->
 
|-
 
|-
| || Calvin Beebe
+
|x || Calvin Beebe
 
|-
 
|-
 
|  || Woody Beeler  
 
|  || Woody Beeler  
Line 43: Line 43:
 
| regrets|| Jane Curry
 
| regrets|| Jane Curry
 
|-
 
|-
| ||Bo Dagnall
+
|x ||Bo Dagnall
 
|-
 
|-
| || Jean Duteau,
+
|x || Jean Duteau,
 
|-
 
|-
| || Austin Kreisler,
+
|x || Austin Kreisler,
 
|-
 
|-
| || Lynn Laakso
+
|x || Lynn Laakso
 
|-
 
|-
 
| || Cecil Lynch
 
| || Cecil Lynch
Line 93: Line 93:
 
===Minutes===
 
===Minutes===
  
 +
No ArB facilitator was in attendance
 +
 +
*Bo notes that he has not received an updated spreadsheet from Ron and Jane with which he would do the modeling.
 +
*Austin has drafted and article on product families and product lines.
  
  

Revision as of 19:17, 27 February 2013

TSC representatives and ArB to jointly develop content for the BAM for the Product Line Architecture Program

HL7 BAM Modeling Call Minutes

Location: call 770-657-9270 using code 985371#

Date: 2013-02-27
Time: 2 pm Eastern
Facilitator Note taker(s) Lynn
Attendee Name


x Calvin Beebe
Woody Beeler
regrets Jane Curry
x Bo Dagnall
x Jean Duteau,
x Austin Kreisler,
x Lynn Laakso
Cecil Lynch
Charlie Mead
regrets Ravi Natarajan
Ron Parker
Brian Pech
Melva Peters
Quorum Requirements Met: (yes/No)
quorum definition?

Agenda

Agenda

  • Approve minutes of 20130220 BAM Modeling
  • Goals and timelines
    • First three life_stage elements
    • update on where Ron/Jane stands and discuss ongoing sessions.

Reference Documents

  1. BAM Overview BAM status as of Jan WGM
  2. Fill in spreadsheet


Minutes

No ArB facilitator was in attendance

  • Bo notes that he has not received an updated spreadsheet from Ron and Jane with which he would do the modeling.
  • Austin has drafted and article on product families and product lines.


Meeting Outcomes

Actions
Next Meeting/Preliminary Agenda Items

© 2012 Health Level Seven® International. All rights reserved.