Difference between revisions of "Infrastructure and Messaging"
Line 9: | Line 9: | ||
[[2012_01_15_inm_wgm_SanAntonio | January 15-20 2012 WGM SanAntonio]] | [[2012_01_15_inm_wgm_SanAntonio | January 15-20 2012 WGM SanAntonio]] | ||
− | + | January 2, 2012 Teleconference '''Cancelled''' | |
[[2011_12_19_InM_teleconference|December 19, 2011 Teleconference]] | [[2011_12_19_InM_teleconference|December 19, 2011 Teleconference]] |
Revision as of 17:46, 20 December 2011
This is the main page of the Infrastructure and Messaging (InM) TC, formerly known as the Control Query (CQ) TC.
The mission of the Infrastructure and Messaging TC (InM) is to provide the infrastructural support required in order for systems to exchange domain content as specified by HL7.
Contents
Agendas/Minutes
January 15-20 2012 WGM SanAntonio
January 2, 2012 Teleconference Cancelled
December 19, 2011 Teleconference
November 7, 2011 Teleconference
October 24, 2011 Teleconference
October 10, 2011 Teleconference
Committee Documents
These documents are open documents for editing by any interested party:
- Workitems: InM Workitem category
- INM Glossary Category:INM Glossary
- Wrappers R2
- Open ATS Issues
Scheduling proposal:InM Scheduling
The following are the open actions items for InM.
- All Action Items(In Dictionary format)
- INM Transmission and Transport Action Items (MCCI, ATS, Messaging Infrastructure)
- V2 Action Items and proposals
The following collaborative documents are edited by the InM co-chairs:\
Old Stuff waiting for re-organization
Other Documents
These documents are listed here for reference purposes: