This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "OO CRLRI-009 - LRI-60 and LRI-61"

From HL7Wiki
Jump to navigation Jump to search
(Created page with "Category:OO Open LRI IG Change Requests Return to OO Change Requests page. {|width=100% cellspacing=0 cellpadding=2 border=1 || '''Submitte...")
 
Line 19: Line 19:
 
'''Technical issues with how the conformance statements are written.'''
 
'''Technical issues with how the conformance statements are written.'''
  
LRI-60 is a compound conformance statement and would be clearer if separated.   There can be multiple OBRs and unclear to which the
+
1)LRI-60 is a compound conformance statement and would be clearer if separated.
Statements are referring.   
+
2)There can be multiple OBRs and unclear to which the Statements are referring.   
  
 
*LRI-60: "If one or more SPM segments are present for the same OBR, then the earliest SPM-17.1 (Range Start Date/Time) SHALL be  
 
*LRI-60: "If one or more SPM segments are present for the same OBR, then the earliest SPM-17.1 (Range Start Date/Time) SHALL be  
Line 40: Line 40:
  
 
But this created conflicting Conformance statement between the base profile and the PH profile.
 
But this created conflicting Conformance statement between the base profile and the PH profile.
+
 
 
== Recommendation ==
 
== Recommendation ==
  

Revision as of 21:36, 1 July 2014


Return to OO Change Requests page.

Submitted by: Eric Haas Revision date: Jan 21 2014
Submitted date: Jan 21 2014 Change request ID: OO CRLRI-009
Standard/IG: Implementation Guide Artifact ID, Name: LRI-60 and LRI-61


Issue

Technical issues with how the conformance statements are written.

1)LRI-60 is a compound conformance statement and would be clearer if separated. 2)There can be multiple OBRs and unclear to which the Statements are referring.

  • LRI-60: "If one or more SPM segments are present for the same OBR, then the earliest SPM-17.1 (Range Start Date/Time) SHALL be

equal to or before OBR-7 (Observation Date/Time) and OBR-7 (Observation Date/Time) SHALL be equal to or before the latest SPM- 17.2 (Range End Date/Time)."

  • LRI-61: "If one or more SPM segments are present for the same OBR and if OBR-8 (Observation End Date/Time) is present, OBR-8

(Observation End Date/Time) SHALL be equal to or before the latest SPM-17.2 (Range End Date/Time)"


in the PH component rewrote them to correct these issues:

  • ELR-75: The earliest SPM-17.1 (Range Start Date/Time) value SHALL be equal to or before OBR-7 (Observation Date/Time) value within the same

ORDER_OBSERVATION Group.

  • ELR-76: If present, the latest SPM-17.2 (Range End Date/Time) value SHALL be equal to or after OBR-7 (Observation Date/Time) value within the

same Order_Observation Group.

  • ELR-30: If present, the latest SPM-17.2 (Range End Date/Time) value SHALL be equal to or after OBR-8 (Observation End Date/Time) value within the

same ORDER_OBSERVATION Group

But this created conflicting Conformance statement between the base profile and the PH profile.

Recommendation

Reommend replacing LRI-60 and LRI-61 with ELR-75, ELR-76 and ELR-30. (renaming them appropriately)

Discuss whether these CS are necessary in light of their absence in LOI.


Rationale

Simplify and Clarify Conformance statements


Discussion

Recommended Action Items

Resolution