This wiki has undergone a migration to Confluence found Here
Infrastructure and Messaging
Jump to navigation
Jump to search
This is the main page of the Infrastructure and Messaging (INM) TC, formerly known as the Control Query (CQ) TC.
The mission of the Infrastructure and Messaging TC (INM) is to provide the infrastructural support required in order for systems to exchange domain content as specified by HL7.
The following collaborative documents are edited by the INM co-chairs:
- INM San Antonio Agenda
- INM San Antonio co-chair Schedule
- INM Phoenix co-chair schedule
- INM Work Distribution
- INM Telcon Chores
These documents are open documents for editing by any interested party:
- XML Schema Documentation
- Open Control Act Issues
- Open Transmission Wrapper Issues
- Open ATS Issues
- SOA versus Message Transmission
- HL7 Oid Symposium (INM and VOCAB)
- INM Glossary
The following are the open actions items for INM. Editorial Contact is Tony Julian [1]
- INM Transmission and Transport Action Items (MCCI, ATS, Messaging Infrastructure)
- Other INM Action Items
Note: Updated from WGM Minutes: MON Q1 Q3, TUE Q1, THU Q4