This wiki has undergone a migration to Confluence found Here
Difference between revisions of "EA IP"
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
*EHR WG - Electronic Health Record System Functional Model Release 2 (EHR-S FM R2), | *EHR WG - Electronic Health Record System Functional Model Release 2 (EHR-S FM R2), | ||
**Led by Pat Van Dyke (Delta Dental Plans Association), ArB liaison John Koisch | **Led by Pat Van Dyke (Delta Dental Plans Association), ArB liaison John Koisch | ||
− | *OO WG - Composite Order proposed project, led by Patrick Loyd | + | *OO WG - Composite Order proposed project, led by Auswtin Kreisler, ArB liaison Patrick Loyd |
+ | *:Project is on hold awaiting resource availability. Currently there is no approved project scope statement. Developing and approving a project scope statement are the next steps when resources are available to work on this project. | ||
*caEHR - proposed project from NCI, led by John Koisch | *caEHR - proposed project from NCI, led by John Koisch | ||
*CDA R3 - Structured Documents proposed project, led by Keith Boone. | *CDA R3 - Structured Documents proposed project, led by Keith Boone. |
Revision as of 18:51, 19 November 2009
Contents
- back to Technical Steering Committee
Enterprise Architecture Implementation Project (EA IP)
This Wiki page was created for the HL7 Enterprise Architecture Implementation Project (EA IP). The Architecture Board is a TSC-appointed committee to define an architecture for the work of the HL7 body. The TSC is responsible for the rollout of that architecture. This site is intended to both provide and elicit communication on, for and about the Implementation Project.
Implementation Plans
- (draft) Alpha Project charter template
- (draft) Alpha Project considerations
- The goal is to use these charters to validate our overall Alpha strategy by, among other things, confirming the level of coverage over the thing-formerly-known-as-SAEAF that we can achieve through our collaboration. Receipt of the charter would be the trigger to formalize Alpha status through the TSC and to coordinate various kick-off calls with the ArB.
Alpha Project progress
See update from September 2009 WGM Progress Report
- PASS Alpha Project - Privacy, Access and Security Services Functional Model, by SOA WG
- CTS2 Alpha Project - Common Terminology Services Release 2, by Vocab WG
- ITS - proposed project - 'The ITS
IsMight Be Broken', led by Dale Nelson.- Project Insight # 544 summary
- EHR WG - Electronic Health Record System Functional Model Release 2 (EHR-S FM R2),
- Led by Pat Van Dyke (Delta Dental Plans Association), ArB liaison John Koisch
- OO WG - Composite Order proposed project, led by Auswtin Kreisler, ArB liaison Patrick Loyd
- Project is on hold awaiting resource availability. Currently there is no approved project scope statement. Developing and approving a project scope statement are the next steps when resources are available to work on this project.
- caEHR - proposed project from NCI, led by John Koisch
- CDA R3 - Structured Documents proposed project, led by Keith Boone.
- Project Insight #477 summary
- Infoway Blueprint - led by Ron Parker
- 2009SeptWGM Weds Q4 update
General Information
- Architecture Definition Project Statement
- Status Report from Marc Koehn 20090126
- Project Scope Statement for EA IP Phase 1
- Status Report from marc Koehn 20090720
- Proposed next steps (5 Oct 2009)
- Value proposition
- start work on the SAEAF value proposition
- Alpha support
- Build Knowledge harvesting plan
- Confirm project liaison list
- Document approval process for other projects
- Consider establishing some sort of “issue” management process ... or leveraging a PMO or other process to ensure that we can capture and resolve issues
- more?
- Communication
- Consider building a "SAEAF" focused WIKI page for context and links ... i.e. setting up a key page that can be linked to from EA-IP, from the main site, from the ArB, etc. but that is geared around non-techy intro materials
- SAEAF Alpha status page – this should be part of the above to provide a list of the projects, access to charters, current status, etc.
- Training
- Future Training Plan
- Value proposition
Presentation Materials
- Draft Impact Statements Presented at Jan2009 WGM
- Jan2009 WGM Wednesday Q3 Overview
- Draft slide deck for 20090202 TSC Conference Call discussion
- SAEAF Slide decks released 2009-03-02
- 2009MayWGM Wednesday Q3 Slide Deck
- 2009MayWGM ECCF Slide deck
- 2009-07-15 SAEAF Specification Stack Webinar slides
- 2009SeptWGM Wednesday Q4 Slides
Discussion Items
- RASCI Responsibility Matrix draft per Ken Rubin
- RASCI Responsibility Matrix v2.1 revision from Jan2009WGM - 20090115 ArB discussion
- draft Internal Engagement Plan
Comments
Please use the discussion tab above.