This wiki has undergone a migration to Confluence found Here
Difference between revisions of "2017 arb sandiego agenda"
Jump to navigation
Jump to search
m (→Thursday Q3) |
m (→Thursday Q3) |
||
Line 34: | Line 34: | ||
#**VMR Logical requires substantive change | #**VMR Logical requires substantive change | ||
#** They can leave as an STU or fix all of the errors, and re-ballot at N1. | #** They can leave as an STU or fix all of the errors, and re-ballot at N1. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
#**Motion to remove Patrick, and call as necessary(Patrick/Lorraine) withdrawn. | #**Motion to remove Patrick, and call as necessary(Patrick/Lorraine) withdrawn. | ||
#**Motion to revisit the Gom, and revise membership as necessary(Wayne/Patrick) (4-0-0) | #**Motion to revisit the Gom, and revise membership as necessary(Wayne/Patrick) (4-0-0) | ||
− | #***Patrick will organize the re-wording of the GOM | + | #***Patrick will organize the re-wording of the GOM 09.03.02 |
#* | #* | ||
Revision as of 22:00, 14 September 2017
Contents
2017 WGM San Diego/La Jolla California US
Sunday Q3 with SGB
- ISM]
- finish the topic
- Need to have another goround at it - to make consumable by the general Management/Methodology groups
- See [2017-09-10_SGB_WGM_Agenda| SGB Minutes September 10]
- finish the topic
- Not Covered in Joint:
- Next steps
- Feed into updates on
- standards grid and
- PSS Project Matrix
- Feed into updates on
- Next steps
- What is the reporting heirachy- BAM.
- Report - product development processes
- SAIF-IG progress
- Originally delegated to MnM - who became consumed by FHIR.
Sunday Q5 with TSC
Monday Q3
- Who is covering what this week?
- PSS review
- PHER Syndromic Surveillance Messaging Guide Dave Trepanier
- Not at the WGM - will schedule for a conference call
- PHER Syndromic Surveillance Messaging Guide Dave Trepanier
- Product grid
Thursday Q3
- Things that came up this week.
- notion of collapsing V2 into a group like Arden Syntax
- Task from TSC:
- VMR XML ballot normative not in alignment with the VMR task force normative recommendations
- VMR Logical requires substantive change
- They can leave as an STU or fix all of the errors, and re-ballot at N1.
- Motion to remove Patrick, and call as necessary(Patrick/Lorraine) withdrawn.
- Motion to revisit the Gom, and revise membership as necessary(Wayne/Patrick) (4-0-0)
- Patrick will organize the re-wording of the GOM 09.03.02
- Other business and planning
- Open issues
- Agenda until next WGM.
- When do we meet next WGM?
- Adjournment