This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Category:201709 FHIR Connectathon Track Proposals"

From HL7Wiki
Jump to navigation Jump to search
Line 7: Line 7:
  
 
Use this page to submit proposals for tracks for inclusion in the Sept 9-10, 2017 (San Diego) connectathon.  These proposals will be reviewed and prioritized by the FMG as per the [[FHIR_Connectathon_Track_Process]].
 
Use this page to submit proposals for tracks for inclusion in the Sept 9-10, 2017 (San Diego) connectathon.  These proposals will be reviewed and prioritized by the FMG as per the [[FHIR_Connectathon_Track_Process]].
<noinclude>[[Category:StyleGuides]]<big>To use this Template:
 
#Search (or Go to) for a page with name like '''yyyymm_Track Name''' (with a proper year/month combination for the target connectathon)
 
#Click on the '''RED''' link to the (previously) undefined page in order to edit it.
 
#Type '''<nowiki>{{subst::Template for FHIR Connectathon Track Proposals}}</nowiki>''' as the '''only content''' for the new page.
 
#Preview (if desired) to verify the reference was typed correctly
 
#"Save" the page.
 
#:At this point, the contents of this template (with the exception of these instructions) will '''replace''' the substitution link.
 
#Re-edit the page to fill in your proposal
 
#Save again
 
</big>
 
</noinclude>
 
 
[[Category:201709_FHIR_Connectathon_Track_Proposals|Sept 2017 Proposals]]
 
[[Category:201709_FHIR_Connectathon_Track_Proposals|Sept 2017 Proposals]]
 
__NOTOC__
 
__NOTOC__

Revision as of 13:46, 8 June 2017

Sub category of FHIR Connectathon Track Proposals for the current connectathon: Sept 2017 Connectathon 16

Proposals due by : June 7, 2017

Go to prior connectathon proposals: May 2017 Connectathon Proposals

Use this page to submit proposals for tracks for inclusion in the Sept 9-10, 2017 (San Diego) connectathon. These proposals will be reviewed and prioritized by the FMG as per the FHIR_Connectathon_Track_Process.

Track Name

Submitting WG/Project/Implementer Group

Justification

Proposed Track Lead

See Connectathon_Track_Lead_Responsibilities

Expected participants

Roles

Please include information here regarding how much advance preparation will be required if creating a client and/or server.

Role 1 Name

Scenarios

Scenario Step 1 Name

Action:
Precondition:
Success Criteria:
Bonus point:


TestScript(s)

Return to the FHIR Main Page