Difference between revisions of "2016-07-28 Patient Care FHIR Call"
Elaine Ayres (talk | contribs) |
Elaine Ayres (talk | contribs) |
||
Line 228: | Line 228: | ||
=================================================================---> | =================================================================---> | ||
<!-- **** Delete instructions and fill in minutes ON NEXT LINES ******--> | <!-- **** Delete instructions and fill in minutes ON NEXT LINES ******--> | ||
− | + | Minutes - Move Russ/Stephen | |
=== Prior Action Item Follow-up === | === Prior Action Item Follow-up === | ||
Russ updated the group on the FHIR Round Table held in Boston. There were over 30 presentation of applications built with FHIR include SMART Growth Charts as well as other applications. Each presentation was 15 minutes long. Presentation will be posted on the HL7 website. There was a modeling and terminology track led by Stan Huff and Susan Matney -- intent is to help professional societies identify terminology for their registries. Build via FHIR profiles. Apple IOS 10 will display C-CDA documents -- no mention of FHIR. | Russ updated the group on the FHIR Round Table held in Boston. There were over 30 presentation of applications built with FHIR include SMART Growth Charts as well as other applications. Each presentation was 15 minutes long. Presentation will be posted on the HL7 website. There was a modeling and terminology track led by Stan Huff and Susan Matney -- intent is to help professional societies identify terminology for their registries. Build via FHIR profiles. Apple IOS 10 will display C-CDA documents -- no mention of FHIR. |
Revision as of 21:24, 28 July 2016
Contents
Meeting Information
Patient Care FHIR Resources Conference Call Location: Conference Call |
Date: 2016-07-28 Time: 5-6:30pm ET | ||||||
Facilitator | Elaine Ayres | Note taker(s) | Elaine Ayres | ||||
Attendee | Name | Affiliation
| |||||
X | Elaine Ayres | NIH/Department of Clinical Research Informatics | |||||
X | Stephen Chu | ||||||
Eric Haas | Haas Consulting | ||||||
X | Rob Hausam | Hausam Consulting LLC | |||||
Laura Heermann-Langford | Intermountain Healthcare | ||||||
Emma Jones | Allscripts | ||||||
X | Russ Leftwich | InterSystems | |||||
Jay Lyle | Ockham Information Services LLC, VA | ||||||
Sarah Maulden | VA | ||||||
Jim McClay | Univ of Nebraska Medical Center | ||||||
Russell McDonell | Telstra Health | ||||||
Lloyd McKenzie | Gevity (HL7 Canada) | ||||||
Larry McKnight | Cerner | ||||||
Michelle M Miller | Cerner | ||||||
Lisa Nelson | Life Over Time Solutions | ||||||
Viet Nguyen | Lockheed Martin, Systems Made Simple | ||||||
M'Lynda Owens | Cognosante | ||||||
Craig Parker | Intermountain Healthcare | ||||||
Scott Robertson | Kaiser Permanente | ||||||
Simon Sum | Academy of Nutrition and Dietetics | ||||||
Iona Thraen | Dept of Veterans Affairs | ||||||
X | Tony Little | Optum360|United Health | |||||
Quorum Requirements Met: yes |
Agenda
Agenda Topics
- Agenda review
- Approve previous meeting minutes 2016-07-21_Patient_Care_FHIR_Call
- Motion: <moved>/<seconded> Abstain - <#>, Negative - <#>, Approve - <#>
- Prior Action Item Follow-up
- gForge change request
Supporting Information
STU 3 Timeline
- Wed, June 1
- All resource and IG proposals for STU3 have been completed, reviewed by WG and submitted
- Connectathon tracks for Sept have been proposed
- Feedback on gForge submitted to FMG
- Sun, July 17 - Substantive content freeze for ballot -- core resources
- Sun, July 24 - Total content freeze, start of QA
- Wed, Aug 10 (midnight) - All QA changes applied
- Fri, Aug 12 - FHIR ballot opens
- Fri, Sept 12 - FHIR ballot closes
- Fri, Sept 16 - FHIR triage complete and ballot content loaded to gForge (or alternate)
- Sept 17-23 - Baltimore WGM
- Sun, Dec 11
- Reconciliation complete/substantive changes applied
- Just over 10 weeks
- Will re-evaluate at Baltimore based on volume of ballot comments
- Dec 31 - Publish
FHIR Maturity Levels
- Level 3 requires the artifact has been verified by the work group as meeting the DSTU_2_QA_guidelines and has been subject to a round of formal balloting; has at least 10 implementer comments recorded in the tracker drawn from at least 3 organizations resulting in at least one substantive change
- Substantive changes (element names, sort order, vocabulary bindings, etc.) need to be applied by ballot freeze (Aug 10).
- Unapplied QA checklist changes can be logged as ballot issues to be applied Sept-Dec. Substantive changes after ballot should be driven by ballot.
- Non-substantive changes are fine
- Level 2 requires artifact has been tested and successfully exchanged between at least three independently developed systems leveraging at least 80% of the core data elements using semi-realistic data and scenarios based on at least one of the declared scopes of the resource (e.g. at a connectathon). These interoperability results must have been reported to and accepted by the FMG.
Resource |
Current FMM Level | Goal FMM Level | QA Status | QA Reviewer | Implementation | Comments |
AllergyIntolerance | 1 | 3 | Rob | Argonaut | ||
Condition | 2 | 3 | PCWG | Argonaut | ||
Procedure | 1 | 3 | Argonaut | |||
CarePlan | 1 | 3 | Argonaut | |||
Goal | 1 | 3 | ||||
QuestionnaireResponse | 2 | 2 | Lloyd | Lloyd will QA to get to level 3 | ||
Questionnaire | 0 | 2 | Lloyd | Lloyd will QA to get to level 3 | ||
CareTeam | 0 | 2 | NA | NA | Aggressive goal (e.g. whether we'll get the implementations needed) | |
FamilyMemberHistory | 1 | 2 | NA | NA | Aggressive goal (e.g. whether we'll get the implementations needed) | |
ClinicalImpression | 0 | 1 | NA | NA | ||
ReferralRequest | 1 | 1 | NA | NA | ||
ProcedureRequest | 1 | 1 | NA | NA | ||
Linkage | 0 | 1 | NA | NA | ||
Flag | 1 | 1 | NA | NA | ||
Communication | 1 | 1 | NA | NA | ||
CommunicationRequest | 1 | 1 | NA | NA |
Note: Bold denotes top 20 resource based on survey
Note: Contraindication and Risk Assessment are owned by CDS, not Patient Care
Minutes
Minutes - Move Russ/Stephen
Prior Action Item Follow-up
Russ updated the group on the FHIR Round Table held in Boston. There were over 30 presentation of applications built with FHIR include SMART Growth Charts as well as other applications. Each presentation was 15 minutes long. Presentation will be posted on the HL7 website. There was a modeling and terminology track led by Stan Huff and Susan Matney -- intent is to help professional societies identify terminology for their registries. Build via FHIR profiles. Apple IOS 10 will display C-CDA documents -- no mention of FHIR.
gForge Change Requests
Typo in Condition resource: http://gforge.hl7.org/gf/project/fhir/tracker/?action=TrackerItemEdit&tracker_item_id=10407&start=0 Rob will fix.
Adjourn
Adjourned at <hh:mm am/pm> <timezone>.
Meeting Outcomes
Actions
|
Next Meeting/Preliminary Agenda Items
|
© 2012 Health Level Seven® International. All rights reserved.