Difference between revisions of "MnM Minutes CC 20110928"
(Created page with "{{subst::MnM Template for Agenda-Minutes}}") |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | |||
<!-- | <!-- | ||
EDITORS - When converting the content from Agenda to minutes: | EDITORS - When converting the content from Agenda to minutes: | ||
Line 6: | Line 5: | ||
2) Delete the Logistics template reference | 2) Delete the Logistics template reference | ||
{{:MnM Conference Call Logistics}} below | {{:MnM Conference Call Logistics}} below | ||
− | -->[[Category:2011 MnM Minutes | + | -->__NOTOC__[[Category:2011 MnM Minutes]] |
− | |||
=M&M Conference Call 4:00PM Eastern Time (Date above)= | =M&M Conference Call 4:00PM Eastern Time (Date above)= | ||
− | |||
[[:Category:2011 MnM Minutes|Return to MnM Minutes]] | [[:Category:2011 MnM Minutes|Return to MnM Minutes]] | ||
+ | ==Attendees== | ||
+ | Woody Beeler, Andy Stechishin, Lloyd McKenzie, Austin Kreisler, Rob Hausam | ||
==Agenda== | ==Agenda== | ||
− | *Approve [[ | + | *Approve [[MnM_Minutes_CC_20110921| Minutes Prior Meeting on 09/21]] |
+ | *RFH Project Approval | ||
+ | *Future Call Items | ||
+ | |||
+ | ==Approve Minutes and Agenda== | ||
+ | *Minutes approval - AK/AS Unanimous | ||
+ | *Agenda Approval - WB/AK Unanimous | ||
+ | |||
+ | ==RFH Project Approval== | ||
+ | Reviewed draft Project Scope Statement titled: Interoperability Resources for Healthcare (IR4H) Methodology Design | ||
+ | |||
+ | Adopted numerous small changes including: | ||
+ | * Add name of primary facilitator. | ||
+ | * Restructured Project Dependencies per G. Grieve through LM | ||
+ | * Revised name of Wiki page to spell it out as: [[Interoperability_Resources_for_Healthcare|Interoperability Resources for Healthcare]] | ||
+ | * Discussed fact that the name of the project is under active discussion in HL7, and that we would retain the current title (minus the acronym) until a final name is determined. | ||
+ | |||
+ | The [http://gforge.hl7.org/gf/download/docmanfileversion/6475/8758/HL7ProjectScopeStatementMnMIR4Hprojectv0.4.doc resulting draft of the document is on Gforge]. | ||
+ | |||
+ | Motion to Approve the above draft and forward to the Foundation and Technology Steering Division (''en route'' to the TSC) - WB/AK - Unanimous | ||
+ | |||
+ | Expect review at FnTSD on 10/4 and at TSC on 10/10. | ||
+ | ===Meeting Support for Project=== | ||
+ | In the course of the discussion, the question arose about the potential requirement for face-to-face interim meetings to advance the topic. It was noted that the project will have two distinct phases, and that additional meetings were more likely to be needed in conjunction with the second phase: | ||
+ | # Creating a formal proposal as the foundation of the Methodology | ||
+ | # Harmonization of resources amongst themselves and with existing resources. | ||
− | == | + | ==MnM Schedule of Conference Calls to January WGM== |
− | + | Agreed to the following set of Conference Calls between now and the January 2012 WGM in San Antonio: | |
− | + | #10/5 Review preliminary Design Patterns for Harmonization (McKenzie) | |
− | + | #10/12 - | |
+ | #*MnM Harmonization proposal approvals, if any; (Beeler) | ||
+ | #*Review of definition and naming of "attribution levels" for CMETS (Stechishin) | ||
+ | #10/19 Hot Topics Clean up (McKenzie) | ||
+ | #10/26 Scope of "Core Principles R2" (McKenzie, Beeler, Klein) | ||
+ | #11/2 Hot Topics (tbd) (McKenzie) | ||
+ | #11/9 Harmonization Final Scheduling (Beeler) | ||
+ | #11/30 Project status reviews, SWOTs, 3-yr Plans, etc | ||
+ | #12/14 - San Antonio Agenda Planning and review | ||
+ | #1/4/12 - San Antonio Agenda Planning and review | ||
− | + | Schedule adoption motion - AS/WB Unanimous | |
==Adjournment== | ==Adjournment== | ||
+ | We did, about on time, or early. |
Latest revision as of 22:58, 28 September 2011
M&M Conference Call 4:00PM Eastern Time (Date above)
Attendees
Woody Beeler, Andy Stechishin, Lloyd McKenzie, Austin Kreisler, Rob Hausam
Agenda
- Approve Minutes Prior Meeting on 09/21
- RFH Project Approval
- Future Call Items
Approve Minutes and Agenda
- Minutes approval - AK/AS Unanimous
- Agenda Approval - WB/AK Unanimous
RFH Project Approval
Reviewed draft Project Scope Statement titled: Interoperability Resources for Healthcare (IR4H) Methodology Design
Adopted numerous small changes including:
- Add name of primary facilitator.
- Restructured Project Dependencies per G. Grieve through LM
- Revised name of Wiki page to spell it out as: Interoperability Resources for Healthcare
- Discussed fact that the name of the project is under active discussion in HL7, and that we would retain the current title (minus the acronym) until a final name is determined.
The resulting draft of the document is on Gforge.
Motion to Approve the above draft and forward to the Foundation and Technology Steering Division (en route to the TSC) - WB/AK - Unanimous
Expect review at FnTSD on 10/4 and at TSC on 10/10.
Meeting Support for Project
In the course of the discussion, the question arose about the potential requirement for face-to-face interim meetings to advance the topic. It was noted that the project will have two distinct phases, and that additional meetings were more likely to be needed in conjunction with the second phase:
- Creating a formal proposal as the foundation of the Methodology
- Harmonization of resources amongst themselves and with existing resources.
MnM Schedule of Conference Calls to January WGM
Agreed to the following set of Conference Calls between now and the January 2012 WGM in San Antonio:
- 10/5 Review preliminary Design Patterns for Harmonization (McKenzie)
- 10/12 -
- MnM Harmonization proposal approvals, if any; (Beeler)
- Review of definition and naming of "attribution levels" for CMETS (Stechishin)
- 10/19 Hot Topics Clean up (McKenzie)
- 10/26 Scope of "Core Principles R2" (McKenzie, Beeler, Klein)
- 11/2 Hot Topics (tbd) (McKenzie)
- 11/9 Harmonization Final Scheduling (Beeler)
- 11/30 Project status reviews, SWOTs, 3-yr Plans, etc
- 12/14 - San Antonio Agenda Planning and review
- 1/4/12 - San Antonio Agenda Planning and review
Schedule adoption motion - AS/WB Unanimous
Adjournment
We did, about on time, or early.