** Groups looking to extend SVS | ** Groups looking to extend SVS | ||
+ | Mayo has engages NLM (publishing in SVS). eMeasure Authoring tool. CDC (PHIN VADS). AHRQ. Come up with a CTS 2 bridge to SVS.Not difficult to go from CTS 2 to SVS. Going from SVS to CTS 2 requires additional information. | ||
+ | |||
+ | SVS has been incorporated into ONC MU. CTS 2 would had been considered had it been "up and running'. However, there was not a production SVS service available at the time either. | ||
== Work on wording to separate Implementation specifics from SFM == | == Work on wording to separate Implementation specifics from SFM == |
Latest revision as of 16:53, 4 September 2012
Contents
Minutes 4-Sept-2012
Roll Call
- Senthil Nachimuthu
- Russell Hamm
- Ana Estelrich
- Frank Oemig
- Harold Solbrig
- Carmella Couderic
- Jos Baptist, Nicitiz
- Monica Harry (regrests)
- Carmella Couderic (regrets)
- Farzaneh Ashrafi, eHO (regrets)
- Harold Solbrig (regrets)
- Fariba Behzadi, eHO (regrets)
- Ebere Ogbu, eHO (regrets)
- Vassil Peytchev (regrets)
Agenda Check
- No changes or additions requested.
Agenda Planning for WGM
Agenda Planning for WGM
- Concerns
- When to use SVS v. CTS 2
- Groups looking to extend SVS
Mayo has engages NLM (publishing in SVS). eMeasure Authoring tool. CDC (PHIN VADS). AHRQ. Come up with a CTS 2 bridge to SVS.Not difficult to go from CTS 2 to SVS. Going from SVS to CTS 2 requires additional information.
SVS has been incorporated into ONC MU. CTS 2 would had been considered had it been "up and running'. However, there was not a production SVS service available at the time either.