This wiki has undergone a migration to Confluence found Here
Difference between revisions of "CTS2N - 4-Sept-12"
Jump to navigation
Jump to search
(Created page with "= Minutes 4-Sept-2012= == Roll Call == * Senthil Nachimuthu * Russell Hamm * Ana Estelrich * Frank Oemig * Harold Solbrig * Monica Harry * Carmella Couderic (regrets) * Fa...") |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
* Frank Oemig | * Frank Oemig | ||
* Harold Solbrig | * Harold Solbrig | ||
− | * | + | * Carmella Couderic |
+ | * Jos Baptist, Nicitiz | ||
+ | |||
+ | * Monica Harry (regrests) | ||
* Carmella Couderic (regrets) | * Carmella Couderic (regrets) | ||
* Farzaneh Ashrafi, eHO (regrets) | * Farzaneh Ashrafi, eHO (regrets) | ||
Line 15: | Line 18: | ||
* Ebere Ogbu, eHO (regrets) | * Ebere Ogbu, eHO (regrets) | ||
* Vassil Peytchev (regrets) | * Vassil Peytchev (regrets) | ||
+ | |||
== Agenda Check== | == Agenda Check== | ||
* No changes or additions requested. | * No changes or additions requested. | ||
+ | |||
+ | == Agenda Planning for WGM== | ||
+ | * | ||
+ | |||
+ | == Agenda Planning for WGM== | ||
+ | * Concerns | ||
+ | ** When to use SVS v. CTS 2 | ||
+ | ** Groups looking to extend SVS | ||
+ | |||
+ | Mayo has engages NLM (publishing in SVS). eMeasure Authoring tool. CDC (PHIN VADS). AHRQ. Come up with a CTS 2 bridge to SVS.Not difficult to go from CTS 2 to SVS. Going from SVS to CTS 2 requires additional information. | ||
+ | |||
+ | SVS has been incorporated into ONC MU. CTS 2 would had been considered had it been "up and running'. However, there was not a production SVS service available at the time either. | ||
+ | |||
+ | == Work on wording to separate Implementation specifics from SFM == | ||
+ | * | ||
== Announcements == | == Announcements == | ||
+ | * |
Latest revision as of 16:53, 4 September 2012
Contents
Minutes 4-Sept-2012
Roll Call
- Senthil Nachimuthu
- Russell Hamm
- Ana Estelrich
- Frank Oemig
- Harold Solbrig
- Carmella Couderic
- Jos Baptist, Nicitiz
- Monica Harry (regrests)
- Carmella Couderic (regrets)
- Farzaneh Ashrafi, eHO (regrets)
- Harold Solbrig (regrets)
- Fariba Behzadi, eHO (regrets)
- Ebere Ogbu, eHO (regrets)
- Vassil Peytchev (regrets)
Agenda Check
- No changes or additions requested.
Agenda Planning for WGM
Agenda Planning for WGM
- Concerns
- When to use SVS v. CTS 2
- Groups looking to extend SVS
Mayo has engages NLM (publishing in SVS). eMeasure Authoring tool. CDC (PHIN VADS). AHRQ. Come up with a CTS 2 bridge to SVS.Not difficult to go from CTS 2 to SVS. Going from SVS to CTS 2 requires additional information.
SVS has been incorporated into ONC MU. CTS 2 would had been considered had it been "up and running'. However, there was not a production SVS service available at the time either.