This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "CTS2N - 14-Feb-12"

From HL7Wiki
Jump to navigation Jump to search
Line 32: Line 32:
 
** [[http://informatics.mayo.edu/svn/trunk/cts2/spec/submission/20110622/20110622%20Mayo%20CTS2%20Convenience%20Submission/11-06-19.zip Platform Specific Model]]
 
** [[http://informatics.mayo.edu/svn/trunk/cts2/spec/submission/20110622/20110622%20Mayo%20CTS2%20Convenience%20Submission/11-06-19.zip Platform Specific Model]]
 
** [[http://informatics.mayo.edu/cts2/framework/ CTS 2 Development Framework]]
 
** [[http://informatics.mayo.edu/cts2/framework/ CTS 2 Development Framework]]
 +
PHAST
 +
* [http://wiki.phast.fr/index.php?title=Standard_Terminology_Service_-_STS Information about STS, links to downloadable components]
 +
Detailed specifications to be drafted by Vancouver WGM.
 
* Functional Requirements Mapping
 
* Functional Requirements Mapping
 
** To be maintained in a Google Docs spreadsheet - [https://docs.google.com/spreadsheet/ccc?key=0AqJfU5XB5zKAdGEtcURvYnoyNVhyQzFnMlpFSERfWlE CTS2 Functional Requirements Comparison Matrix]
 
** To be maintained in a Google Docs spreadsheet - [https://docs.google.com/spreadsheet/ccc?key=0AqJfU5XB5zKAdGEtcURvYnoyNVhyQzFnMlpFSERfWlE CTS2 Functional Requirements Comparison Matrix]

Revision as of 09:02, 16 February 2012

Minutes 14-Feb-2012

Roll Call and Agenda Check

  • Ana Estelrich (AE)
  • Jim Case
  • Ken Rubin (KR)
  • Monica Harry
  • Senthil Nachimuthu (SN)
  • Craig Stancl
  • Kevin Petersen
  • Russell Hamm
  • Frank Oemig
  • Jan Wittenbur

Announcements

  • Call in information - HL7 no longer provides toll free calling. Previous agenda was incorrect and has been corrected.


Action Item Review

  • Russ to post wiki information for minutes - complete
  • Discuss with the OMG FTF to have a vote to make the OMG documents public and available on CTS 2 Normative wiki. - Complete
  • Ana to ping Frank / Berndt on their CTS 2 efforts.


Infrastructure / Asset Review

PHAST

Detailed specifications to be drafted by Vancouver WGM.

Discussion

Frank Oemig outlined the work going on in Germany and Austria pertaining to CTS 2 development from the SFM. Frank called out two specific areas of the SFM that require further discussion/enhancement in the normative SFM.

  1. Conformance is missing from the SFM. Both the SFM and the PIM allow for piecemeal development of CTS 2 services. While this is a strength, the HL7 SFM should establish a conformance profile that outlines the functionality required for a HL7 CTS 2 service instance.
  2. CTS 2 is silent on licensing. We should discuss licensing and how CTS 2 should manage licensing and authentication to terminology sources.

Action Items

  • Russ to investigate and establish mapping document and SFM document in Google docs.

Items for Next Agenda

HL7 Conformance Profile

  • What should it look like (messaging / browsing / mapping)
  • Required functionality

Value Set Grammar

  • What (if anything) is implemented by Mayo or PHAST

Functional Requirement Review

  • Matrix

Preliminary agenda for next call