This wiki has undergone a migration to Confluence found Here
Difference between revisions of "V3 Publishing ConCall Minutes 20090225"
Jump to navigation
Jump to search
Astechishin (talk | contribs) |
Astechishin (talk | contribs) |
||
Line 29: | Line 29: | ||
** 33 ballots in the current pool | ** 33 ballots in the current pool | ||
** 2 are affirmation ballots | ** 2 are affirmation ballots | ||
− | |||
− | |||
** 2 are ISO ballots | ** 2 are ISO ballots | ||
− | **# | + | **# Align version 1.1 of the EHR functional model with ISO |
**# ICSR draft initial standard ballot, balloting will open on the current cycle but not close until the September cycle | **# ICSR draft initial standard ballot, balloting will open on the current cycle but not close until the September cycle | ||
** 8 are new normative ballots | ** 8 are new normative ballots | ||
Line 39: | Line 37: | ||
* Next deadline | * Next deadline | ||
− | ** initial ballot content | + | ** initial ballot content - March 1 |
===Around the Table=== | ===Around the Table=== |
Revision as of 05:14, 27 February 2009
Contents
Wednesday, February 25, 2009 -- 4:00 PM Eastern
Present
Beeler, Kreisler, Lloyd, Seppala, Stechishin
Agenda
Quorum was not attained so the following are discussion notes as opposed to formal meeting minutes.
Review Minutes of February 18, 2009
Postponed due to lack of quorum.
SVN and Publishing
Pursuant to the motion of last meeting in this item: Andy will post a note to Wilfred and tooling to request password protection for read access to v3-ballot-pkg, v2-ballot-pkg and v3-editions; Woody will consult with V2 editors and T3SD
Note Vocab thread re: Realms
This item can be dropped from future agendas
Complete Vocab in RMIM Designer BETA
Woody did preview/demo of the just completed changes and fixes to the RMIM Designer. The group was very appreciative of Woody's efforts.
Notes from Don Lloyd
- Notice of Intent to Ballot
- waiting on addition NIB from MIDA
- 33 ballots in the current pool
- 2 are affirmation ballots
- 2 are ISO ballots
- Align version 1.1 of the EHR functional model with ISO
- ICSR draft initial standard ballot, balloting will open on the current cycle but not close until the September cycle
- 8 are new normative ballots
- 7 are continuations of previous normative ballots
- 11 are dstu ballots
- Next deadline
- initial ballot content - March 1
Around the Table
- Gregg
- ready to stage may ballot - no CMETs for PM, Woody to fix
- updated scheduling CMETs, prefer pre-populated SVN and Gregg will identify what needs change