This wiki has undergone a migration to Confluence found Here
Difference between revisions of "20170829 arb minutes"
Jump to navigation
Jump to search
m (→Agenda) |
|||
Line 36: | Line 36: | ||
|colspan="2"|Mayo Clinic | |colspan="2"|Mayo Clinic | ||
|- | |- | ||
− | | | + | |X||Bond,Andy |
− | |colspan="2"| | + | |colspan="2"|TBD |
|- | |- | ||
|R||[[User:Lconstab |Constable, Lorraine]] | |R||[[User:Lconstab |Constable, Lorraine]] | ||
Line 48: | Line 48: | ||
|colspan="2"| AEGIS | |colspan="2"| AEGIS | ||
|- | |- | ||
− | | | + | |X||[[User:Ajulian | Julian, Tony]] |
|colspan="2"|Mayo Clinic | |colspan="2"|Mayo Clinic | ||
|- | |- | ||
− | | | + | |X||Knapp, Paul |
|colspan="2"| Pknapp Consulting | |colspan="2"| Pknapp Consulting | ||
|- | |- | ||
− | | | + | |X||Kreisler, Austin |
|colspan="2"|Leidos, Inc | |colspan="2"|Leidos, Inc | ||
|- | |- | ||
− | | | + | |X||Kubick, Wayne |
|colspan="2"|HL7 CTO | |colspan="2"|HL7 CTO | ||
|- | |- | ||
Line 63: | Line 63: | ||
|colspan="2"| ICode Solutions | |colspan="2"| ICode Solutions | ||
|- | |- | ||
− | | | + | |X||[[User:Clynchmd | Lynch, Cecil]] |
|colspan="2"|Accenture | |colspan="2"|Accenture | ||
|- | |- | ||
Line 69: | Line 69: | ||
|colspan="2"|Accenture | |colspan="2"|Accenture | ||
|- | |- | ||
− | | | + | |X||Milosevic, Zoran |
|colspan="2"|Deontik Pty Ltd | |colspan="2"|Deontik Pty Ltd | ||
|- | |- | ||
Line 75: | Line 75: | ||
|colspan="2"|HL7 UK | |colspan="2"|HL7 UK | ||
|- | |- | ||
− | | | + | |X||[[User:Astechishin| Stechishin,Andy]] |
− | | | + | |Zolspan="2"|CANA Software and Service Ltd. |
|- | |- | ||
− | | | + | |X|| Kuhn, Thomson |
|colspan="2"| ACP | |colspan="2"| ACP | ||
|- | |- | ||
Line 101: | Line 101: | ||
|} | |} | ||
− | ==Minutes==[[Category:2017 ARB Minutes]][[Category:ARB-SGB Joint]] | + | ==Minutes== |
+ | #Approval of Agenda and Minutes | ||
+ | #*Agenda approved by consent | ||
+ | #*Minute Approval | ||
+ | #*'''MOTION''' to approve the [[20170725_arb_minutes|minutes ]](Paul/Andy S) | ||
+ | #*'''Vote''': (6-0-0) | ||
+ | #*ISM - Review and update ppt with artifacts mapped to the ISM | ||
+ | #** How do we define DONE? | ||
+ | #***Paul: Done for now. Intention was to look at the ISM -it has value, but where and at what level of the organization? The hope is it will have value throughout the organization, but it does not have perceivable street value. Probably usable at the methodology/management product family levels. Probably not for domain level committees. | ||
+ | #***Zoran: At the present time? Do you expect change to the TSC? | ||
+ | #***Paul: Not put it in a vault as forever done. As domains increase in complexity due to maturation, or run into issues, this could be a useful tool. | ||
+ | #***Paul: In the slides examples based on actual domains. We should forward to the methodology and management committees for the families to reflect on, where they can search for value. | ||
+ | #***Paul: Take matrix from PSS into the ISM. Not purely governance-centric. | ||
+ | #***ARB to take PSS Product matrix into the ISM. Annunciate to the SGB. | ||
+ | #**[https://gforge.hl7.org/gf/project/saeaf/scmsvn/?action=browse&path=%2F%2Acheckout%2A%2Ftrunk%2FSAIF-ISM%2FISM-Ig-HD.pptx | ISM-IG-HD.pptx] | ||
+ | #***Finalized on the slide deck. | ||
+ | #Adjournment | ||
+ | #*Adjourned at 5:36pm Eastern | ||
+ | |||
+ | [[User:Ajulian|Tony Julian]] ([[User talk:Ajulian|talk]]) 10:07, 30 August 2017 (EDT) | ||
+ | [[Category:2017 ARB Minutes]][[Category:ARB-SGB Joint]] |
Revision as of 14:07, 30 August 2017
Contents
ARB - Meeting (Date in Title)
logistics
Teleconferences are held on Tuesday at 4:00pm U.S. Eastern Schedules may be found at HL7.org Conference Call Center
Please join my meeting from your computer, tablet or smartphone.
- Join the meeting:
- Join the online meeting: Online Meeting Link:https://join.freeconferencecall.com/arb97
- Online Meeting ID:arb97
- If you cant use voip then capture the PIN from the screen for the above action, then
- Dial into the conference: Dial-in Number:(605) 472-5556 - United States
- enter the access code 332183
- enter the pin.
- International Dial-in Numbers:https://www.freeconferencecall.com/wall/arb97/#international
- Weekly conference call.
- For 24/7 customer service please call (844) 844-1322.
Agenda
- Call to order
- Roll Call
- Approval of Agenda and Minutes
- Management
- Governance
- Methodology
- ISM - Review and update ppt with artifacts mapped to the ISM
- How do we define DONE?
- What is the communication path?
- | ISM-IG-HD.pptx
- ISM - Review and update ppt with artifacts mapped to the ISM
- Other business and planning
- Adjournment
Meeting Information
HL7 ARB Work Group Meeting Minutes Location: Telcon |
Date: 20170829 Time: 4:00pm U.S. Eastern | |||
Facilitator | Julian, Tony | Note taker(s) | Julian, Tony | |
Attendee | Name | Affiliation | ||
. | Beebe, Calvin | Mayo Clinic | ||
X | Bond,Andy | TBD | ||
R | Constable, Lorraine | Constable Consulting Inc. | ||
. | Hamm, Russell | Intelligent Medical Objects | ||
. | Hyland, Mario | AEGIS | ||
X | Julian, Tony | Mayo Clinic | ||
X | Knapp, Paul | Pknapp Consulting | ||
X | Kreisler, Austin | Leidos, Inc | ||
X | Kubick, Wayne | HL7 CTO | ||
. | Loyd, Patrick | ICode Solutions | ||
X | Lynch, Cecil | Accenture | ||
. | McCaslin, Ken | Accenture | ||
X | Milosevic, Zoran | Deontik Pty Ltd | ||
. | Smithies, Rik | HL7 UK | ||
X | Stechishin,Andy | CANA Software and Service Ltd. | ||
X | Kuhn, Thomson | ACP | ||
. | ||||
Legend | ||||
X | Present | |||
. | Absent | |||
R | Regrets | |||
Quorum Requirements (Co-chair + 3) Met: Yes |
Minutes
- Approval of Agenda and Minutes
- Agenda approved by consent
- Minute Approval
- MOTION to approve the minutes (Paul/Andy S)
- Vote: (6-0-0)
- ISM - Review and update ppt with artifacts mapped to the ISM
- How do we define DONE?
- Paul: Done for now. Intention was to look at the ISM -it has value, but where and at what level of the organization? The hope is it will have value throughout the organization, but it does not have perceivable street value. Probably usable at the methodology/management product family levels. Probably not for domain level committees.
- Zoran: At the present time? Do you expect change to the TSC?
- Paul: Not put it in a vault as forever done. As domains increase in complexity due to maturation, or run into issues, this could be a useful tool.
- Paul: In the slides examples based on actual domains. We should forward to the methodology and management committees for the families to reflect on, where they can search for value.
- Paul: Take matrix from PSS into the ISM. Not purely governance-centric.
- ARB to take PSS Product matrix into the ISM. Annunciate to the SGB.
- | ISM-IG-HD.pptx
- Finalized on the slide deck.
- How do we define DONE?
- Adjournment
- Adjourned at 5:36pm Eastern
Tony Julian (talk) 10:07, 30 August 2017 (EDT)