This wiki has undergone a migration to Confluence found Here
FTSD SWOT and Three-year Strategic Plan Summary
Jump to navigation
Jump to search
Edit this page and replace <... SWOT link> and <... Plan link> with the URL of your work group's SWOT analysis and strategic plan (3 year minimum).
Note: Modeling and Methodology has an example link for each document.
Work Group | SWOT Analysis | Strategic Plan |
Implementable Technology Specifications (ITS) | SWOT | <ITS Plan link> |
Implementation/Conformance | IC SWOT | IC Strategic Plan |
Infrastructure & Messaging (InM) | SWOT | Strategic Plan |
RIM-Based Application Architecture (RIMBAA) | RIMBAA SWOT | RIMBAA three year plan |
Modeling & Methodology (MnM) | MnM SWOT Analysis | MnM Strategic Plan |
Security | SWOT | Strategic Plan |
Service Oriented Architecture (SOA) | SWOT | <SOA Plan link> |
Templates | <Templates SWOT link> | <Templates Plan link> |
Vocabulary | <Vocab SWOT link> | <Vocab Plan link> |