2011-09-27 RCRIM Call Minutes
Return to RCRIM Teleconference Minutes and Agendas
Contents
- 1 Meeting Information
- 2 Agenda Topics
- 3 Minutes
- 3.1 Agenda review and approval
- 3.2 Approve meeting minutes
- 3.3 Address comments on three year plan
- 3.4 Project Scope Statement for Subject Data CDA IG
- 3.5 Timeline for CRQF
- 3.6 Approval of request to withdraw Abnormality Assessment
- 3.7 Discuss actions for current Study Design Ballot
- 3.8 Discuss timing on Withdrawal of Study Design and Study Participation DAM
- 3.9 Other Items
- 4 Meeting Outcomes
- 5 Next Meeting Preliminary Agenda Items
Meeting Information
HL7 RCRIM Agenda Location: Dial: 770-657-9270 Passcode: 745896# Webex Info:
|
Date: 2011-09-27 Time: 10:00-11:00 am Eastern Time | ||
Facilitator | Ed Tripp | Note taker(s) | Ed Tripp |
Attendee | Name | Affiliation | |
x | Becky Angeles | ScenPro | |
x | Michael Brennan | Johnson and Johnson | |
x | Joel Finkle | Image Solutions, Inc. | |
x | Norman Gregory | FDA | |
x | Jay Levine | FDA | |
x | Armando Oliva | FDA | |
x | Steve Sandberg | ScenPro | |
x | John Speakman | NCI | |
x | Lise Stevens | FDA | |
x | Ed Tripp | Edward S. Tripp and Associates | |
x | Marti Velezis | Sonrisa Consulting | |
x | Diane Wold | GSK | |
Quorum Requirements Met: YES | |||
quorum for RCRIM is 10 plus a co-chair |
Agenda Topics
- Agenda review and approval
- Approve meeting minutes
- Address comments on three year plan (if needed)
- Project Scope Statement for Subject Data CDA IG
- Approval of request to withdraw Abnormality Assessment
- Discuss actions for current Study Design Ballot
- Discuss timing on Withdrawal of Study Design and Study Participation DAM
- Other Items
Supporting Documents
Three Year Plan 2011-09-20
Request to withdraw Abnormality Assessment
Minutes
Minutes/Conclusions Reached:
Agenda review and approval
Timeline for CRFQ was added after ‘’ Project Scope Statement for Subject Data CDA IG’’
Approve meeting minutes
' | Affirmate | Negative | Abstain |
Votes | 10 | 0 | 0 |
Result | Minutes Approved |
- Working Group Meeting Minutes A single vote was taken to approve all of the WGM minutes as a package
' | Affirmate | Negative | Abstain |
Votes | 10 | 0 | 0 |
Result | Minutes Approved |
- 2011-09-13 RCRIM Minutes San Diego
- 2011-09-14 RCRIM Minutes San Diego
- 2011-09-15 RCRIM Minutes San Diego
Address comments on three year plan
The RCRIM Three Year Plan was approved via electronic vote with one negative and comment
Name | Date and Time | Comment |
Joel Finkle | Tuesday, September 20, 2011 7:55:40 AM GMT-12:00 | RPS should be shown as Regulated Product Submissions Release 2 Version 2 and Version 3, not Release 2 and Release 3. What is listed as Release 3 currently should be correct to handle the revisions needed based on the recent ballot comments. |
It was suggested that the Three year plan be amended to add a parenthetical statement to RPSr3 “Regulated Product Submission Release 3 (Next ballot of release 2)” and submit the Three Year Plan Joel Finkle will revise the Regulated Product Submission Release 3 Project Scope Statement to amend the project name so that communications about the project are clear. The revised project scope statement will be placed on a future RCRIM Agenda.
Project Scope Statement for Subject Data CDA IG
Mead Walker has drafted a Project Scope Statement for Subject Data – Patient Narrative IG and Lise is following up to see when this can be circulated. As soon as it is available, Ed will post it for an RCRIM electronic vote using Doodle Poll. FDA reported that they cannot access doodle.com through their firewall. Lise will turn in a ticket. Ed Tripp will post a vote for anyone who cannot access the site if they provide an e-mail with their vote and comments (if any) until such time that the FDA members can access doodle.
Timeline for CRQF
Marti presented the following timeline
Date | Item |
October 11, 2011 | CRFQ – Present/Walk-though updated DSTU Content at RCRIM Teleconference |
October 21, 2011 | CRFQ – Submit Comments on DSTU Content |
October 25, 2011 | CRFQ – Review Comments on DSTU Content at RCRIM Teleconference |
October 30, 2011 | January 2012 Ballot: Notification of Intent to Ballot |
November 6, 2011 | January 2012 Ballot: Initial Ballot Content |
Approval of request to withdraw Abnormality Assessment
Motion by Norman Gregory, seconded by Michael Brennan was made to approve the withdraw of Abnormality Assessment
' | Affirmative | Negative | Abstain |
Votes | 11 | 0 | 0 |
Result | Motion Carries |
Discuss actions for current Study Design Ballot
We discussed the approach to use to for moving the Study Design Message to a structured document. The agreed upon plan is to leave the message in DSTU and initiate a new project to create a Structured Document Version of Study Design with Structured Documents as a co-sponsor. Mead Walker will draft the project scope statement.
Discuss timing on Withdrawal of Study Design and Study Participation DAM
At the WGM we discussed withdrawal of the two DAM’s and replacing them with a link to a project based view in BRIDG. Becky indicated the BRIDG Harmonization Package that has just been posted to the [www.bridgmodel.org www.bridgmodel.org ] website this week. Scroll down to the User Information section and then you will see the “Download the BRIDG Harmonization Package” link. The file in this package that will be of most help for the Study Participation and Study Design projects is “How to Build a BRIDG-Based Analysis Model.PDF.” Once there is a project specific BRIDG based Analysis Model, we will decide on how to move forward with replacing the current DAM’s
Other Items
None
- Adjourned 10:55 a.m. Eastern.
Meeting Outcomes
Action Item | Owner | Due Date |
Send Withdrawal request on Abnormality Assessment to HL7 HQ | Ed Tripp | 9/27/2011 |
Create PSS for Subject Data, Patient Narrative CDA IG | Mead Walker | 9/30/2011 |
Create PSS for Study Design Structured Document | Mead Walker | 9/30/2011 |
Establish plan to generate BRIDG based Analysis Model for Study Design and Study Participation | Lise Stevens | 10/11/2011 |
Next Meeting Preliminary Agenda Items
- Agenda review and approval
- Approve meeting minutes from 2011-09-27_RCRIM_Call_Minutes
- Approve Publication Request for eStability IG
- CRFQ – Present/Walk-though updated DSTU Content
- Other Items
© 2010 Health Level Seven® International. All rights reserved.