Difference between revisions of "V3 Publishing ConCall Minutes 20090128"

From HL7Wiki
Jump to navigation Jump to search
Line 24: Line 24:
 
Woody reported that, though there was an agreement to not require the ISO formatting, there is a push toward this format.  
 
Woody reported that, though there was an agreement to not require the ISO formatting, there is a push toward this format.  
  
Don reported V2.5 from Frank Oemig would assist in production of ISO format, not sure what else is required
+
Don reported V2.5 from Frank Oemig would assist in production of ISO format, not sure what else is required.
 +
 
 +
Woody and Don work working on issues with the hyperlinks in the submission.
  
 
===Discussion of Publishing SVN Process===
 
===Discussion of Publishing SVN Process===
 +
Woody walked through the document with discussion from the group. Andy would post updated document
  
 +
===Round Table===
 +
Gregg - Issue with SVN, problems with registries domain, Don: not built in as yet. Did commit but no files showed up. May be tied to performing SVN copies
 +
Intent uvrg in nerg
  
===Item n===
 
 
==Adjourned at ???==
 
==Adjourned at ???==
 
==Future Business==
 
==Future Business==
 
#List here
 
#List here

Revision as of 21:54, 28 January 2009

Return to Publishing Committee
Minutes of Recent Publishing Conference Calls

Wednesday, January 28, 2009 -- 4:00 PM Eastern

Present

Beeler, Kreisler, Loyd, Lloyd, Seppala, Stechishin, Savage, Madra, Frean (Isobel)

Agenda

Move to adopt with inclusion of discussion of Publishing SVN tasks Savage/Lloyd 5-0-0

Review Minutes of January 21, 2009

Stechishin/Savage 5-0-0

Creation of Issues List on Wiki

Stechishin reported that the Issues pages was started. Work was progressing on setting up the templates and the issues from the WGM would be entered in the next few days. Andy would also start the FAQ

CBC Submissions and Issues

Don reported 20 ballots indicated, no issues Patrick commented that the creation and dissolution of Work Groups would require coordination with Don with regard to materials in ballot.

Status of ISO submissions (ICSR, CDA R2, V2.5 of RIM, EHR Functional Model, Clinical Genomics and Pedigree)

Woody reported that, though there was an agreement to not require the ISO formatting, there is a push toward this format.

Don reported V2.5 from Frank Oemig would assist in production of ISO format, not sure what else is required.

Woody and Don work working on issues with the hyperlinks in the submission.

Discussion of Publishing SVN Process

Woody walked through the document with discussion from the group. Andy would post updated document

Round Table

Gregg - Issue with SVN, problems with registries domain, Don: not built in as yet. Did commit but no files showed up. May be tied to performing SVN copies Intent uvrg in nerg

Adjourned at ???

Future Business

  1. List here