Difference between revisions of "Research and Measure on RIMBAA"

From HL7Wiki
Jump to navigation Jump to search
 
Line 1: Line 1:
[[category:RIMBAA Issue]]
+
[[category:Closed AID Issue]]
 
==Summary==
 
==Summary==
 
How do we support Research and KPI in a RIM compliant environment? Or the other way around; how can a RIM compliant environment improve  Research and KPI/Measure?
 
How do we support Research and KPI in a RIM compliant environment? Or the other way around; how can a RIM compliant environment improve  Research and KPI/Measure?

Latest revision as of 08:11, 25 March 2015

Summary

How do we support Research and KPI in a RIM compliant environment? Or the other way around; how can a RIM compliant environment improve Research and KPI/Measure?

Analysis

eMeasure gives us a means to define the Measure computable. RIM gives us a means to structure data needed to compute the Measure.

Discussion

  • Free flowing comments related to the issue at hand

Keywords/Related

  • RIM compliant, RIM based (CCD), RIM enabled, RIM mappable
  • eMeasures (HQMF)
  • SAS/SPSS/R/Cognos/Hyperion
  • KPI - Key Performance Indicators
  • StatML
  • DataWareHouse