This wiki has undergone a migration to Confluence found Here
Difference between revisions of "Report back from Meeting Tue 20th"
Jump to navigation
Jump to search
(→Plan / Next Steps: added a few more notes from meeting) |
|||
Line 31: | Line 31: | ||
* Set up next call when ready to review spreadsheet | * Set up next call when ready to review spreadsheet | ||
* Julie to send link to BRIDG mapping spreadsheet to Colleen and Christi (Done) | * Julie to send link to BRIDG mapping spreadsheet to Colleen and Christi (Done) | ||
− | * Prepare for September connectathon for Lab FHIR exchange | + | * Prepare for September connectathon for Lab FHIR exchange (6-June: September Connectathon proposals due; 17-Aug: Content in place for FHIR freeze) |
Latest revision as of 18:07, 21 February 2018
Related Links |
Objective of TCB/BR&R Subteam
Represent CDISC Lab model in FHIR
Plan / Next Steps
- Is there any collaborative tool to use or just email spreadsheets? Some team members can't use googledocs.
- Julie to send spreadsheet to Colleen and Christi (Done)
- Colleen and Christi to add Lab Data Model items and vocabulary bindings to spreadsheet and send back to Julie
- Julie to confirm BRIDG part of mapping in spreadsheet
- Need to confirm mappings and gaps
- Set up next call when ready to review spreadsheet
- Julie to send link to BRIDG mapping spreadsheet to Colleen and Christi (Done)
- Prepare for September connectathon for Lab FHIR exchange (6-June: September Connectathon proposals due; 17-Aug: Content in place for FHIR freeze)