This wiki has undergone a migration to Confluence found Here
Difference between revisions of "Report back from Meeting Tue 20th"
Jump to navigation
Jump to search
Hugh Glover (talk | contribs) (Created page with "{| style="width:100%; background-color:transparent;" |- | style="vertical-align:top; width:50%" | <!-- LEFT COLUMN --> __TOC__ | style="vertical-align:top; width:35%" | <!--...") |
(→Plan / Next Steps: added a few more notes from meeting) |
||
(One intermediate revision by the same user not shown) | |||
Line 24: | Line 24: | ||
=Plan / Next Steps= | =Plan / Next Steps= | ||
− | * Is there any collaborative tool to use or just email spreadsheets? | + | * Is there any collaborative tool to use or just email spreadsheets? Some team members can't use googledocs. |
− | * Julie to send spreadsheet to Colleen and Christi | + | * Julie to send spreadsheet to Colleen and Christi (Done) |
* Colleen and Christi to add Lab Data Model items and vocabulary bindings to spreadsheet and send back to Julie | * Colleen and Christi to add Lab Data Model items and vocabulary bindings to spreadsheet and send back to Julie | ||
* Julie to confirm BRIDG part of mapping in spreadsheet | * Julie to confirm BRIDG part of mapping in spreadsheet | ||
* Need to confirm mappings and gaps | * Need to confirm mappings and gaps | ||
* Set up next call when ready to review spreadsheet | * Set up next call when ready to review spreadsheet | ||
− | * Julie to send link to BRIDG mapping spreadsheet to Colleen and Christi | + | * Julie to send link to BRIDG mapping spreadsheet to Colleen and Christi (Done) |
+ | * Prepare for September connectathon for Lab FHIR exchange (6-June: September Connectathon proposals due; 17-Aug: Content in place for FHIR freeze) |
Latest revision as of 18:07, 21 February 2018
Related Links |
Objective of TCB/BR&R Subteam
Represent CDISC Lab model in FHIR
Plan / Next Steps
- Is there any collaborative tool to use or just email spreadsheets? Some team members can't use googledocs.
- Julie to send spreadsheet to Colleen and Christi (Done)
- Colleen and Christi to add Lab Data Model items and vocabulary bindings to spreadsheet and send back to Julie
- Julie to confirm BRIDG part of mapping in spreadsheet
- Need to confirm mappings and gaps
- Set up next call when ready to review spreadsheet
- Julie to send link to BRIDG mapping spreadsheet to Colleen and Christi (Done)
- Prepare for September connectathon for Lab FHIR exchange (6-June: September Connectathon proposals due; 17-Aug: Content in place for FHIR freeze)