This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Infrastructure and Messaging"

From HL7Wiki
Jump to navigation Jump to search
m (typo)
Line 2: Line 2:
  
 
The mission of the Infrastructure and Messaging TC (IM) is to provide the infrastructural support required in order for systems to exchange [[domain content]] as specified by HL7.
 
The mission of the Infrastructure and Messaging TC (IM) is to provide the infrastructural support required in order for systems to exchange [[domain content]] as specified by HL7.
 +
 +
The following 2 collaborative documents are for use by the CQ co-chairs:
 +
* [[CQ San Diego Agenda]]
 +
* [[CQ Work Distribution]]
  
 
{{Standard-stub}}
 
{{Standard-stub}}

Revision as of 08:14, 13 July 2005

This is the main page of the Control Query (CQ) TC. The TC will put forward a new Mission and Charter, which (if approved during the September 2005 WGM) will cause the new name of the TC to become "Infrastructure and Messaging" (IM).

The mission of the Infrastructure and Messaging TC (IM) is to provide the infrastructural support required in order for systems to exchange domain content as specified by HL7.

The following 2 collaborative documents are for use by the CQ co-chairs:

This article is a stub. You can help us by expanding it.