This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Implementing OHT Static Model Designer in HL7"

From HL7Wiki
Jump to navigation Jump to search
Line 53: Line 53:
  
 
===Test Status Tracking===
 
===Test Status Tracking===
* Act Class Validation Tracking Sheet [[ActClassValidationTestTrackingSheet.zip]]
+
* Act Class Validation Tracking Sheet [^ActClassValidationTestTrackingSheet.zip]

Revision as of 20:18, 6 November 2009

Planning for Implementation of Static Model Designer and other OHT projects.

Tasks (not in final order)

Prepare to Test Application

  • Acquire Test Plan - Nov. 4 draft available
  • Update Test Plan for HL7 Use Cases - Nov. 12 - HL7TestCases
  • Recruit specific HL7 testers - Nov. 12 - HL7 Testers
  • Make arrangements for tracking HL7 testers on OHT project trackers - Nov. 26
  • Assemble test data - Nov. 26
  • Work out how to provide feedback and what needs to be resolved by the OHT project and what the Tooling WG will need to resolve - Nov. 26
  • Get access to software - Nov. 30
  • Determine technical requirements to install full package - Nov. 26
  • Acquire NHS documentation for installing and running SMD for NHS testers - Nov. 19
  • Enhance documentation to assist testers to install package on different platforms - Nov. 26

Perform Testing

  • Register HL7 testing and assign HL7 tests
  • Compare functionality with current tooling functionality and identify gaps
  • Identify whether gaps are bugs or missing capability or methodology issues
  • Prioritize fixes - identify which will be undertaken by the project and which to include in enhancement before deployment
  • Estimate effort to enhance before deployment

Evaluate Documentation

  • Examine documentation to determine if it is suitable to be able to support first time HL7 users.
  • Identify what documentation will be needed to distribute with HL7 users.
  • Estimate effort to enhance documentation before deployment

Prepare training plan

  • Identify topics needed for migration training
  • Identify sources of content for topics
  • Estimate effort to produce training material

Prepare conversion plan

  • Evaluate difficulty to convert existing models to be used by SMD.
  • Determine approach for conversion
  • Determine skillsets needed for conversion
  • Estimate effort for conversion

Prepare communication plan

  • Determine which groups need what kind of communication using what channels
  • Determine skillsets needed for communication preparation
  • Prepare estimate to create appropriate communication material for each audience
  • Identify existing ballot documentation that will require revision
  • Prepare estimate to revise ballot documentation

Prepare to acquire suitable resources to support migration

  • Prepare formal plan and estimate
  • Acquire funding
  • Acquire resources

Work Plan

Test Status Tracking

  • Act Class Validation Tracking Sheet [^ActClassValidationTestTrackingSheet.zip]