This wiki has undergone a migration to Confluence found Here
Difference between revisions of "INM San Antonio Agenda"
Jump to navigation
Jump to search
m |
Rene spronk (talk | contribs) |
||
(9 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
IM Agenda for San Antonio (May 2006). | IM Agenda for San Antonio (May 2006). | ||
* WGM Agenda (M-F) frozen | * WGM Agenda (M-F) frozen | ||
− | **The Monday-Friday agenda was accepted by motion at the InM Telconference Monday, April 14, 2006, subject to harmonizing the Thursday agenda with Vocab. The wiki version is 15: | + | **The Monday-Friday agenda was accepted by motion at the InM Telconference Monday, April 14, 2006, subject to harmonizing the Thursday agenda with Vocab. The wiki version is 15:20, 24 April 2006. |
'''Saturday 6 May''' | '''Saturday 6 May''' | ||
Line 13: | Line 13: | ||
** Co-Chair Election | ** Co-Chair Election | ||
** Organizational/procedural action items | ** Organizational/procedural action items | ||
+ | ** Formally approve "ambassador" attending MnM Datatypes localization quarter | ||
** XML Topics (last 30 mins) | ** XML Topics (last 30 mins) | ||
* Q2 Shared Messages and ControlAct Wrappers | * Q2 Shared Messages and ControlAct Wrappers | ||
Line 23: | Line 24: | ||
***Impact of QueryByparameter.ResponseElementGroupId on dynamic model | ***Impact of QueryByparameter.ResponseElementGroupId on dynamic model | ||
***Guidance to comittees: 1 or 2 TEs when confirming/rejecting a RQO? | ***Guidance to comittees: 1 or 2 TEs when confirming/rejecting a RQO? | ||
− | *** | + | ***Conformance: Dynamic Model constraints /localization (short status; issue will be dealt with as a Negative Major against the Conformance/Localization document) |
− | ***Introduction of a formal [[HL7 Messaging Architecture]] document | + | ***Introduction of a formal [[HL7 Messaging Architecture]] document (short status; INM has yet to create a formal position on this) |
+ | ***[[Interaction Pattern]] as a concept (MnM hot topic, dealt with in another MnM quarter) | ||
** Methodology (e.g. Update Mode, Auditing) vs. Abstract Datatypes | ** Methodology (e.g. Update Mode, Auditing) vs. Abstract Datatypes | ||
* Q4 HL7 v2 issues | * Q4 HL7 v2 issues | ||
Line 33: | Line 35: | ||
'''Tuesday 9 May''' | '''Tuesday 9 May''' | ||
* Q1 Transmission Infrastructure | * Q1 Transmission Infrastructure | ||
+ | ** Batch proposal 969 (BT) | ||
+ | ** Mead Walker: requirement for author of a batch | ||
** Remaining MCCI R2 C1 Ballot reconcilation | ** Remaining MCCI R2 C1 Ballot reconcilation | ||
** [[INM Transmission and Transport Action Items]] | ** [[INM Transmission and Transport Action Items]] | ||
+ | ** Discussion and formal approval of Harmonization Proposals | ||
** [[Open Transmission Wrapper Issues]] | ** [[Open Transmission Wrapper Issues]] | ||
* Q2 Transmission Infrastructure | * Q2 Transmission Infrastructure | ||
Line 56: | Line 61: | ||
** Discuss RAMP and delta-document as created by Chris Ferris | ** Discuss RAMP and delta-document as created by Chris Ferris | ||
** Remaining topics from Q1 (if any) | ** Remaining topics from Q1 (if any) | ||
− | * Q3 Hosting joint Vocab meeting | + | * Q3 Hosting joint Vocab meeting |
+ | ** Use of OIDs in CNE.3 and CWE.3 in v2 messages | ||
+ | ** New coded data type for compositional expressions | ||
+ | ** OID Questions | ||
* Q4 Hosting joint Vocab meeting | * Q4 Hosting joint Vocab meeting | ||
** ''Continuation of Q3'' | ** ''Continuation of Q3'' | ||
Line 62: | Line 70: | ||
'''Thursday 11 May''' (Under Discussion, may be modified) | '''Thursday 11 May''' (Under Discussion, may be modified) | ||
* Q1 Hosting joint XML meeting | * Q1 Hosting joint XML meeting | ||
− | * Q2 | + | * Q2 UML ITS Planning |
* Q3 HL7 v3 Data types | * Q3 HL7 v3 Data types | ||
** Abstract Data Types | ** Abstract Data Types | ||
+ | *** Release 2: [[R2_XML_ITS_datatypes]] , [[R2_XML_ITS_structures]] | ||
** XML ITS Data Types | ** XML ITS Data Types | ||
* Q4 Hot Topics | * Q4 Hot Topics | ||
** Walk in session, all v3 and v2 topics | ** Walk in session, all v3 and v2 topics | ||
+ | ** NHS "Batching" proposal 969 (reworded) | ||
'''Friday 12 May''' | '''Friday 12 May''' |
Latest revision as of 03:02, 11 May 2006
IM Agenda for San Antonio (May 2006).
- WGM Agenda (M-F) frozen
- The Monday-Friday agenda was accepted by motion at the InM Telconference Monday, April 14, 2006, subject to harmonizing the Thursday agenda with Vocab. The wiki version is 15:20, 24 April 2006.
Saturday 6 May
- Out-of-cycle INM meeting (Q1 May 6 up to Q2 May 7)
- ATS, MCCI, SOA and Transports, see INM Pre-May WGM out-of-cycle Meeting for details.
Monday 8 May
- Q1 Meeting Overview
- Ballot/proposal overview
- Mission statement review
- Decision making process document
- Co-Chair Election
- Organizational/procedural action items
- Formally approve "ambassador" attending MnM Datatypes localization quarter
- XML Topics (last 30 mins)
- Q2 Shared Messages and ControlAct Wrappers
- COMT Ballot reconciliation
- Proposals (#971 and others)
- Open Control Act Issues (time permitting)
- Q3 Joint with MnM, MnM Hosting (has been confirmed)
- Methodology (Dynamic Model) vs. Communication Models
- RIM backwards compatibility issues (e.g. semanticsText)
- Impact of QueryByparameter.ResponseElementGroupId on dynamic model
- Guidance to comittees: 1 or 2 TEs when confirming/rejecting a RQO?
- Conformance: Dynamic Model constraints /localization (short status; issue will be dealt with as a Negative Major against the Conformance/Localization document)
- Introduction of a formal HL7 Messaging Architecture document (short status; INM has yet to create a formal position on this)
- Interaction Pattern as a concept (MnM hot topic, dealt with in another MnM quarter)
- Methodology (e.g. Update Mode, Auditing) vs. Abstract Datatypes
- Methodology (Dynamic Model) vs. Communication Models
- Q4 HL7 v2 issues
- HL7 v2.7 proposals (if any)
- Conformance issues
- Supported Feature Discovery Interaction (v3 Conformance issue)
Tuesday 9 May
- Q1 Transmission Infrastructure
- Batch proposal 969 (BT)
- Mead Walker: requirement for author of a batch
- Remaining MCCI R2 C1 Ballot reconcilation
- INM Transmission and Transport Action Items
- Discussion and formal approval of Harmonization Proposals
- Open Transmission Wrapper Issues
- Q2 Transmission Infrastructure
- Continuation of Q1
- Q3 INM Hosts Joint INM/HSSP Services
- Transmission Infrastructure as a Service
- Q4 INM hosts Joint INM/Security&Accountability
- Transport Security Issues
- Ballot reconciliation of WebServices and ATS Security Line Items
- Digital Signature, proposal 970
- Other security issues
Wednesday 10 May
- Q1 Transports
- Removable media ballot reconciliation
- Abstract Transport Specification ballot reconcilliation
- Transport related Proposals
- Other transport related issues
- Q2 Transports
- Webservices ballot reconciliation
- Discuss RAMP and delta-document as created by Chris Ferris
- Remaining topics from Q1 (if any)
- Q3 Hosting joint Vocab meeting
- Use of OIDs in CNE.3 and CWE.3 in v2 messages
- New coded data type for compositional expressions
- OID Questions
- Q4 Hosting joint Vocab meeting
- Continuation of Q3
Thursday 11 May (Under Discussion, may be modified)
- Q1 Hosting joint XML meeting
- Q2 UML ITS Planning
- Q3 HL7 v3 Data types
- Abstract Data Types
- Release 2: R2_XML_ITS_datatypes , R2_XML_ITS_structures
- XML ITS Data Types
- Abstract Data Types
- Q4 Hot Topics
- Walk in session, all v3 and v2 topics
- NHS "Batching" proposal 969 (reworded)
Friday 12 May
- Q1/Q2 Wrap-up meeting
- HL7 v2.7 proposals (if any)
- Java SIG update & status evaluation
- Meeting evaluation
- Ballot status
- Direction of INM
- co-Chair responsibilities
- Agenda for next WGM