This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "INM San Antonio Agenda"

From HL7Wiki
Jump to navigation Jump to search
m
 
(48 intermediate revisions by 4 users not shown)
Line 1: Line 1:
IM Agenda for Scottsdale Arizona (January 2006).
+
IM Agenda for San Antonio (May 2006).
 +
* WGM Agenda (M-F) frozen
 +
**The Monday-Friday agenda was accepted by motion at the InM Telconference Monday, April 14, 2006, subject to harmonizing the Thursday agenda with Vocab.  The wiki version is 15:20, 24 April 2006.  
  
Have a joint session with Services SIG ??
+
'''Saturday 6 May'''
 
+
*Out-of-cycle INM meeting (Q1 May 6 up to Q2 May 7)
'''Monday 12 Sept'''
+
** ATS, MCCI, SOA and Transports, see [[INM Pre-May WGM out-of-cycle Meeting]] for details.
* Q1 Meeting overview (fix)
+
'''Monday 8 May'''
 +
* Q1 Meeting Overview
 
** Ballot/proposal overview  
 
** Ballot/proposal overview  
 
** Mission statement review
 
** Mission statement review
 
** Decision making process document
 
** Decision making process document
** Overview of closed action items
+
** Co-Chair Election
 +
** Organizational/procedural action items
 +
** Formally approve "ambassador" attending MnM Datatypes localization quarter
 
** XML Topics (last 30 mins)
 
** XML Topics (last 30 mins)
* Q2 v2 issues (second v2 quarter, may be changed)
+
* Q2 Shared Messages and ControlAct Wrappers
* Q3
+
** COMT Ballot reconciliation
* Q4 HL7 v2 issues (fix)
+
** Proposals (#971 and others)
 +
** [[Open Control Act Issues]] (time permitting)
 +
* Q3 Joint with MnM, MnM Hosting (has been confirmed)
 +
** Methodology (Dynamic Model) vs. Communication Models
 +
***RIM backwards compatibility issues (e.g. semanticsText)
 +
***Impact of QueryByparameter.ResponseElementGroupId on dynamic model
 +
***Guidance to comittees: 1 or 2 TEs when confirming/rejecting a RQO?
 +
***Conformance: Dynamic Model constraints /localization (short status; issue will be dealt with as a Negative Major against the Conformance/Localization document)
 +
***Introduction of a formal [[HL7 Messaging Architecture]] document (short status; INM has yet to create a formal position on this)
 +
***[[Interaction Pattern]] as a concept (MnM hot topic, dealt with in another MnM quarter)
 +
** Methodology (e.g. Update Mode, Auditing) vs. Abstract Datatypes
 +
* Q4 HL7 v2 issues  
 +
** HL7 v2.7 proposals (if any)
 
** Conformance issues
 
** Conformance issues
** v2.6 ballot reconcilliation
+
** Supported Feature Discovery Interaction (v3 Conformance issue)
  
'''Tuesday 13 Sept'''
+
'''Tuesday 9 May'''
* Q1 Control Act Domains (fix)
+
* Q1 Transmission Infrastructure
** registry project wrap-up
+
** Batch proposal 969 (BT)
** queries
+
** Mead Walker: requirement for author of a batch
* Q2 HL7 v3 ballot reconciliation & proposals
+
** Remaining MCCI R2 C1 Ballot reconcilation
* Q3 HL7 v3 ballot reconciliation & proposals
+
** [[INM Transmission and Transport Action Items]]
* Q4 CQ hosts Joint CQ/Security&Accountability (fix)
+
** Discussion and formal approval of Harmonization Proposals
** Webservices ballot, security items (remaining ballot rec.)
+
** [[Open Transmission Wrapper Issues]]
** Digital Signature in ControlAct wrapper
+
* Q2 Transmission Infrastructure
 +
** ''Continuation of Q1''
 +
* Q3 INM Hosts Joint INM/HSSP Services
 +
** Transmission Infrastructure as a ''Service''
 +
* Q4 INM hosts Joint INM/Security&Accountability  
 +
** Transport Security Issues
 +
** Ballot reconciliation of WebServices and ATS Security Line Items
 +
** Digital Signature, proposal 970
 +
** Other security issues
  
'''Wednesday 14 Sept'''
+
'''Wednesday 10 May'''
* Q1 Transports, Abstract Transport Specification
+
* Q1 Transports
** ATS ballot reconcilliation
+
** Removable media ballot reconciliation
 +
** Abstract Transport Specification ballot reconcilliation
 +
** Transport related Proposals
 +
** Other transport related issues
 
* Q2 Transports
 
* Q2 Transports
* Q3 xxx services SIG ??
+
** Webservices ballot reconciliation
* Q4 Hosting joint Vocab meeting (fix)
+
** Discuss RAMP and delta-document as created by Chris Ferris
** v2 and v3 issues
+
** Remaining topics from Q1 (if any)
 +
* Q3 Hosting joint Vocab meeting
 +
** Use of OIDs in CNE.3 and CWE.3 in v2 messages
 +
** New coded data type for compositional expressions
 +
** OID Questions
 +
* Q4 Hosting joint Vocab meeting
 +
** ''Continuation of Q3''
  
'''Thursday 15 Sept'''
+
'''Thursday 11 May''' (Under Discussion, may be modified)
* Q1 Hosting joint XML meeting (fix)
+
* Q1 Hosting joint XML meeting  
* Q2 Transports
+
* Q2 UML ITS Planning
* Q3 v3 Data types (fix)
+
* Q3 HL7 v3 Data types
** Abstract data types
+
** Abstract Data Types
** XML ITS data types
+
*** Release 2: [[R2_XML_ITS_datatypes]] , [[R2_XML_ITS_structures]]
* Q4 Hot Topics (fix)
+
** XML ITS Data Types
 +
* Q4 Hot Topics
 
** Walk in session, all v3 and v2 topics
 
** Walk in session, all v3 and v2 topics
 +
** NHS "Batching" proposal 969 (reworded)
  
'''Friday 16 Sept'''
+
'''Friday 12 May'''
 
* Q1/Q2 Wrap-up meeting
 
* Q1/Q2 Wrap-up meeting
** HL7 v2.7 proposals
+
** HL7 v2.7 proposals (if any)
 +
** Java SIG update & status evaluation
 
** Meeting evaluation
 
** Meeting evaluation
 
** Ballot status
 
** Ballot status
** Direction of CQ
+
** Direction of INM
** co-Chair responsabilities
+
** co-Chair responsibilities
 
** Agenda for next WGM
 
** Agenda for next WGM

Latest revision as of 03:02, 11 May 2006

IM Agenda for San Antonio (May 2006).

  • WGM Agenda (M-F) frozen
    • The Monday-Friday agenda was accepted by motion at the InM Telconference Monday, April 14, 2006, subject to harmonizing the Thursday agenda with Vocab. The wiki version is 15:20, 24 April 2006.

Saturday 6 May

Monday 8 May

  • Q1 Meeting Overview
    • Ballot/proposal overview
    • Mission statement review
    • Decision making process document
    • Co-Chair Election
    • Organizational/procedural action items
    • Formally approve "ambassador" attending MnM Datatypes localization quarter
    • XML Topics (last 30 mins)
  • Q2 Shared Messages and ControlAct Wrappers
  • Q3 Joint with MnM, MnM Hosting (has been confirmed)
    • Methodology (Dynamic Model) vs. Communication Models
      • RIM backwards compatibility issues (e.g. semanticsText)
      • Impact of QueryByparameter.ResponseElementGroupId on dynamic model
      • Guidance to comittees: 1 or 2 TEs when confirming/rejecting a RQO?
      • Conformance: Dynamic Model constraints /localization (short status; issue will be dealt with as a Negative Major against the Conformance/Localization document)
      • Introduction of a formal HL7 Messaging Architecture document (short status; INM has yet to create a formal position on this)
      • Interaction Pattern as a concept (MnM hot topic, dealt with in another MnM quarter)
    • Methodology (e.g. Update Mode, Auditing) vs. Abstract Datatypes
  • Q4 HL7 v2 issues
    • HL7 v2.7 proposals (if any)
    • Conformance issues
    • Supported Feature Discovery Interaction (v3 Conformance issue)

Tuesday 9 May

  • Q1 Transmission Infrastructure
  • Q2 Transmission Infrastructure
    • Continuation of Q1
  • Q3 INM Hosts Joint INM/HSSP Services
    • Transmission Infrastructure as a Service
  • Q4 INM hosts Joint INM/Security&Accountability
    • Transport Security Issues
    • Ballot reconciliation of WebServices and ATS Security Line Items
    • Digital Signature, proposal 970
    • Other security issues

Wednesday 10 May

  • Q1 Transports
    • Removable media ballot reconciliation
    • Abstract Transport Specification ballot reconcilliation
    • Transport related Proposals
    • Other transport related issues
  • Q2 Transports
    • Webservices ballot reconciliation
    • Discuss RAMP and delta-document as created by Chris Ferris
    • Remaining topics from Q1 (if any)
  • Q3 Hosting joint Vocab meeting
    • Use of OIDs in CNE.3 and CWE.3 in v2 messages
    • New coded data type for compositional expressions
    • OID Questions
  • Q4 Hosting joint Vocab meeting
    • Continuation of Q3

Thursday 11 May (Under Discussion, may be modified)

  • Q1 Hosting joint XML meeting
  • Q2 UML ITS Planning
  • Q3 HL7 v3 Data types
  • Q4 Hot Topics
    • Walk in session, all v3 and v2 topics
    • NHS "Batching" proposal 969 (reworded)

Friday 12 May

  • Q1/Q2 Wrap-up meeting
    • HL7 v2.7 proposals (if any)
    • Java SIG update & status evaluation
    • Meeting evaluation
    • Ballot status
    • Direction of INM
    • co-Chair responsibilities
    • Agenda for next WGM