This wiki has undergone a migration to Confluence found Here

HL7 Stability Standard Implementation Guide Teleconference Minutes 2012-04-23

From HL7Wiki
Revision as of 13:31, 24 April 2012 by NRGregory57 (talk | contribs) (Created page with "==HL7 Stability Standard Pilot/Implementation Guide Teleconference Minutes== '''April 23, 2012''' Attendees: Norman Gregory (CVM), Tim Lee (CBER), Tena Wei (CDRH), Catherine Hos...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

HL7 Stability Standard Pilot/Implementation Guide Teleconference Minutes

April 23, 2012

Attendees: Norman Gregory (CVM), Tim Lee (CBER), Tena Wei (CDRH), Catherine Hosage-Norman (Sunovion), Mike Mlodzik (Boehringer Ingelheim Vetmedica, Inc.), Edward Pec (Abbott Laboratories), Art Griesser (Promethues), Howard Shatz (Data Conversion Laboratory, Inc.), and April Daly (Lab Objects)

  • For end users using the Validator there would be no pay for use or license. If the validator is wrapped within another product, that would be a different issue.
  • The VB.NET In-Put Tool would have a way of linking or pointing to the validator.
  • VB.NET Form: The SpecifiedIngredient for the Substance will default to SRS, but for Product it will be left blank.
  • Catherine will do a demonstration of the VB.NET In-Put Tool during the Monday April 30th teleconference.

Agenda for April 30, 2012 Teleconference: