This wiki has undergone a migration to Confluence found Here
Difference between revisions of "FHIR Connectathons"
Jump to navigation
Jump to search
(Created page with "{{FHIR Discussion Page}} Principles discussed in approving Connectathons associated with HL7 OOC Meetings - *needs to be sponsored by HL7 International or an affiliate, and app...") |
|||
(4 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
+ | This page has been migrated here: https://confluence.hl7.org/display/FHIR/FHIR+Connectathons | ||
+ | |||
{{FHIR Discussion Page}} | {{FHIR Discussion Page}} | ||
− | Principles discussed in approving Connectathons associated with HL7 | + | Principles discussed in approving Connectathons associated with HL7 Out-Of-Cycle Meetings - |
*needs to be sponsored by HL7 International or an affiliate, and approved by FMG. | *needs to be sponsored by HL7 International or an affiliate, and approved by FMG. | ||
Line 15: | Line 17: | ||
*prepare a report on lessons learned or feedback. | *prepare a report on lessons learned or feedback. | ||
**Comments from experience will be DSTU comments. | **Comments from experience will be DSTU comments. | ||
+ | |||
+ | General principles of Connectathons at the IHE Wiki at http://wiki.ihe.net/index.php?title=Connectathon_Principle. | ||
[[Category:FHIR Discussion]] | [[Category:FHIR Discussion]] | ||
− |
Latest revision as of 21:06, 24 January 2020
This page has been migrated here: https://confluence.hl7.org/display/FHIR/FHIR+Connectathons
Principles discussed in approving Connectathons associated with HL7 Out-Of-Cycle Meetings -
- needs to be sponsored by HL7 International or an affiliate, and approved by FMG.
Criteria for FMG approval
- Must submit names of the coordinator and technical lead for the connectathon
- need to have at least one person familiar with FHIR
- Persons should have participated in a prior connectathon, having an implementation, etc…
- Remains a judgment call from FMG for now
- Identify what version of the spec on which they will draw,
- need to assert if they have requirements for a frozen version of the spec and what other requirements they have.
- describe the scenarios to execute, and
- prepare a report on lessons learned or feedback.
- Comments from experience will be DSTU comments.
General principles of Connectathons at the IHE Wiki at http://wiki.ihe.net/index.php?title=Connectathon_Principle.