This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "FHIR Ballot Prep"

From HL7Wiki
Jump to navigation Jump to search
 
(47 intermediate revisions by 7 users not shown)
Line 1: Line 1:
 +
A calendar has not yet been established for the FHIR R5 cycle.  General ballot timelines for implementation guides can be found on the [[https://confluence.hl7.org/display/HL7/HL7+Calendars HL7 confluence page]]
  
This page lists the tasks to be completed by work groups in preparation for the R4 release of the FHIR core specification.  The timelines for implementation guide publication and balloting may differ.  Implementation Guides may choose to either publish in sync with the core specification (and actively manage dependencies as underlying resources and profiles are updated) or may choose to ballot later, once the FHIR specification is finalized.  (The disadvantage of the latter approach is that changes to the core specification identified as part of implementation guide revision won't be able to be applied until a subsequent release)
+
<!--This page lists the tasks to be completed by work groups in preparation for the R4 release of the FHIR core specification.  The timelines for implementation guide publication and balloting may differ.  Implementation Guides may choose to either publish in sync with the core specification (and actively manage dependencies as underlying resources and profiles are updated) or may choose to ballot later, once the FHIR specification is finalized.  (The disadvantage of the latter approach is that changes to the core specification identified as part of implementation guide revision won't be able to be applied until a subsequent release.)
  
The current schedule for the next connectathon/ballot base (Jan 2018)
+
[http://wiki.hl7.org/index.php?title=Category:FHIR_IG_Proposal Here] is a link for Implementation Guide proposals
*Oct 18th - connectathon proposal deadline
+
 
*Freeze deadlines will be the same as the Dec. ballot deadlines below:
+
Notes:
 +
* R4 is the first FHIR publication that will contain Normative content.  For those who aren't familiar with HL7 processes, Normative means that, once the specification passes, we will no longer make breaking changes to the specification from that point forward - ever.  The rules for change in FHIR for normative content are described [[http://hl7.org/fhir/versions.html#b-compat here]].
 +
* R4 is also the first time we're expecting to have multiple "ballots" for FHIR core content.  This means that there will be '''one''' FHIR specification hosted on the web.  However, each page in the specification will identify both what level it's being balloted at (not balloted, draft, STU or normative) as well as which ballot it's part of.  Multiple ballots are necessary to allow content to proceeed by different paths - balloting at different levels requires separate ballots and if there's a need to allow some content to be demoted to a lower level while other content remains on the normative path, that content needs to be packaged separately.
 +
 
 +
==Priorities==
 +
For this WGM:
 +
* Discuss the candidate normative artifacts and evaluate whether your WG/organization would like to see the list changed.  The current candidate list is:
 +
**Framework,  XML, JSON, RESTful API, Search, Data types
 +
**CodeSystem, ValueSet, ConceptMap. (But not all operations on those resources)
 +
**Bundle, OperationOutcome, Parameters, StructureDefinition, SearchParameter, CapabilityStatement, OperationDefinition
 +
**Patient, Observation
 +
* Look at the revised workflow patterns ([[http://hl7.org/fhir/definition.html Definition]], [[http://hl7.org/fhir/request.html Request]], [[http://hl7.org/fhir/event.html Event]]) and consider how to apply them to your artifacts
 +
* Look at the [[FHIR_Conformance_QA_Criteria|new quality criteria]] - for resources and other artifacts - and plan for how you'll work at meeting them
 +
* Identify what your target FMM levels are for the artifacts you control
 +
* Identify any new resources or IGs you want in R4
 +
* Look at your tracker items and plan to manage them
 +
 
 +
For the R4 publication - STU candidates:
 +
* Align with updated workflow patterns where it makes sense to do so and agree on deviations with the Workflow project
 +
* Clear (and then keep on top of) tracker items
 +
* Move towards your target FMM levels
 +
* Candidate normative artifacts: In addition to the above, get this content "rock solid" - substantive changes applied, QA complete, artifact to the point where the WG and community is happy for it to be "locked down"
 +
 
 +
For the R4 publication - Normative candidates:
 +
* all of the above plus:
 +
** Get all content "rock solid" with both WG and community in agreement that content is ready to be set in stone
  
  
 
==Ballot schedule==
 
==Ballot schedule==
Note that this schedule is considered to be quite firm.  If there are concerns about meeting the target dates listed here, the likely outcome will be changing ballot status of artifacts (Normative down to STU, STU down to draft, lower FMM levels, drop content entirely).  That said, if you have concerns about any of these dates, please contact your work group's FMG liaison or send an email to fmgcontact@hl7.org
 
  
===Plan Overview===
+
===January 2018 Cycle===
We expect that the R4 cycle will consist of 2-3 ballots:
+
 
* '''January 2018 Cycle - Single For Comment allot'''The purpose of this ballot is to provide an early review of Normative content to ensure quality is in place and identify as many substantive issues as possible in advance of the normative ballot.  It also provides a QA point for other resources as we prepare for the "real" ballot.  Tracker items received as a result of this ballot don't require formal resolution or change application prior to the opening of the following ballot, though work groups should do their best - prioritizing normative - to resolve what they can.  Unresolved commenets will carry forward but will not carry ballot weight unless someone references them in a subsequent ballot.
+
'''Single FHIR Core 'For Comment' Ballot, possible IG R3-based STU ballots, possible IG R4-based 'For Comment' ballots'''
 +
 
 +
The purpose of this ballot is to provide an early review of candidate normative content to ensure quality is in place and identify as many substantive issues as possible in advance of the normative ballot.  It also provides a QA point for other resources as we prepare for the May STU ballot.  Tracker items received as a result of this ballot don't require formal resolution or change application prior to the opening of the following ballot, though work groups should do their best - prioritizing normative - to resolve what they can.  Unresolved comments will carry forward but will not carry ballot weight unless someone references them in a subsequent ballot.
 +
 
 +
*2017-10-18 - Deadline for connectathon proposals to FMG
 +
*2017-10-25 - Work groups inform the FMG of any implementation guides they'd like to ballot in Dec. cycle (strong preference to not ballot against R3 at this time unless essential for regulatory or similar reasons)
 +
*2017-10-28 - Initial vocabulary harmonization proposals are due
 +
*2017-11-12 - Deadline for Notice of Intent to Ballot if balloting implementation guides
 +
*2017-11-15 - Work groups identify any changes (additions or removals) to the candidate list of Normative content
 +
*2017-11-25 - Final vocabulary harmonization proposals are due
 +
*2017-11-28 - Harmonization for the upcoming ballot cycle
 +
*2017-12-03 - WG's have completed reconciliation for previous IG ballots if re-balloting an IG
 +
*2017-12-10 - Substantive change freeze for core. 
 +
**Normative candidates SHOULD have QA spreadsheet filled in and pass all QA. Related change logs should be clear.  Should be no "Deferred" substantive changes
 +
**Any resource intended to be in R4 needs to be present in at least draft form
 +
*2017-12-17 - Final freeze (including IGs)
 +
*2017-12-22 - Ballot opens
 +
*2018-01-10 - Final date for WG-approved resource, profile & IG proposals intended to be FMM 1 or higher in R4
 +
*2018-01-22 - Ballot closes
 +
*2018-01-27 - 2018-02-02: Jan WGM (New Orleans)
 +
 
 +
===May 2018 Cycle===
 +
'''Single FHIR Core STU ballot, multiple Normative FHIR Core ballots, possible IG R4-based STU ballots'''
  
* '''May 2018 Cycle - Single STU ballot, multiple Normative ballots''': This will be the "primary" ballot for R4.  The normative content will be broken up into multiple packages (likely 3) to allow some packages to pass while others are dropped to 'STU' if necessary.  FMM levels will be locked prior to this ballot and content here will require reconciliation.  (Balloters might reference previously submitted tracker items, including items submitted as part of the For Comment ballot.)
+
This will be the "primary" ballot for R4.  The normative content will be broken up into multiple packages (likely 3) to allow some packages to pass while others are dropped to 'STU' if necessary.  FMM levels will be locked prior to this ballot and content here will require reconciliation.  (Balloters might reference previously submitted tracker items, including items submitted as part of the For Comment ballot.)
  
* '''Sept 2018 Cycle - possible Normative re-ballots and limited STU ballot''': The primary purpose of this cycle is to allow reballoting of packages that are eligible to pass with only minor substantive changes or where one or more resources have been dropped from the package down to STU*If* there is a second ballot for normative issues, then work groups balloting STU core content may petition for an additional STU ballot if they've made major revisions they feel justifies an additional ballot reviewHowever, STU publications do not require reballot for substantive change and there will be little time for reconciliation and change application prior to the publication of R4, so this option considered carefully.
+
*2018-02-14 - Last date to inform FMG of intention to ballot IGs as part of May ballot.
 +
*2018-02-21 - Deadline for connectathon proposals to FMG; Deadline for resource and IG proposals that are candidates for STU in R4
 +
*2018-02-25 - NIB for any IG required (and core)
 +
*2018-03-04 - FHIR Core substantive change freeze.  IGs can still make changes.  Work groups must inform product director what resources are to be treated as "draft" for this ballot (and for R4).
 +
*2018-03-11 - FHIR Core content total freeze.  Normative candidates SHALL have QA spreadsheet filled in and pass all QANormative content should have tracker items cleared and no outstanding deferred QA tracker itemsQA period opens for core and IG processes
 +
** Note: After this date, substantive changes can only be made to artifacts and pages marked "Normative" if they are in response to a ballot comment or the artifact has been dropped from its normative package back to STU status
 +
*2018-03-25 - QA changes may be applied
 +
*2018-04-01 - Final content freeze - no changes except with permission of product director (both core and all IGs)
 +
*2018-04-06 - Ballot opens
 +
*2018-05-07 - Ballot closes
 +
*2018-05-12 - 2018-05-18: May WGM (Cologne)
  
Publication of R4 will occur in mid-December 2018.
+
===Sept 2018 Cycle===
 +
'''possible Normative re-ballots, possible limited STU FHIR Core ballot, possible IG R4-based STU ballots''':
  
==Detailed schedule==
+
The primary purpose of this cycle is to allow reballoting of packages that are eligible to pass with only minor substantive changes or where one or more resources have been dropped from the package down to STU.  *If* there is a second ballot for normative issues, then work groups balloting STU core content may petition for an additional STU ballot if they've made major revisions they feel justifies an additional ballot review.  However, STU publications do not require reballot for substantive change and there will be little time for reconciliation and change application prior to the publication of R4, so this option needs to be considered carefully.
''For comment ballot''
 
  
2017-10-25 - Work groups inform the FMG of any implementation guides they'd like to ballot in Dec. cycle (strong preference to not ballot against R3 at this time unless essential for regulatory or similar reasons)
+
*2018-06-06: Deadline for connectathon proposals to FMG
2017-11-15 - Work groups identify any changes (additions or removals) to the candidate list of Normative content
+
*2018-07-01: Work groups notify the FMG whether they need to reballot normative packages (due to substantive change), STU resources (due to significant refactoring) or IGs during the Sept. cycle
*Framework,  XML, JSON, RESTful API, Search
+
** Implementation Guide proposals due to FMG for new FHIR IGs
*CodeSystem, ValueSet, ConceptMap. (But not all operations on those resources)
+
** Scope changes to what artifacts are present in the normative candidate releases is due to FMG
*Bundle, OperationOutcome, Parameters, StructureDefinition, SearchParameter, CapabilityStatement, OperationDefinition
+
*2018-07-15: Notice of Intent for ballot due
*Patient, Observation
+
*2018-08-05: Reconciliation packages must be posted by this date at the absolute latest
2017-12-10 - Substantive change freeze for core.   
+
*2018-08-10: All substantive reconciliation appliedFHIR Core is frozen, limited QA process for content subject to ballot only
*Normative candidates SHOULD have QA spreadsheet filled in and pass all QA. Related change logs should be clear.  Should be no "Deferred" substantive changes
+
*2018-08-17: Pre-ballot (and connectathon) content freeze.  Publication process begins, including ensuring that content is appropriately flagged for ballot status and there are no last minute QA issues
*Any resource intended to be in R4 needs to be present in at least draft form
+
*2018-08-24: Ballot opens
2017-12-17 - Final freeze (including IGs)
+
*2018-09-24: Ballot closes and initial triage occurs.  Note: No substantive changes allowed for normative candidates unless they drop to STU.
2017-12-22 - Ballot opens
 
2018-01-22 - Ballot closes
 
2018-01-27 - 2018-02-02: Jan WGM (New Orleans)
 
  
''Primary ballot'''
+
===R4 Publication===
Note: After this date, substantive changes can only be made to artifacts and pages marked "Normative" if they are in response to a ballot comment or the artifact has been dropped from its normative package back to STU status
+
These are the publication deadlines leading to the publication of the FHIR R4 core specification and any IGs that plan to *publish* on the same cycle.
2018-02-14 - Last date to inform FMG of intention to ballot IGs as part of May ballot.
 
2018-03-04 - FHIR Core substantive change freeze.  IGs can still make changes.  Work groups must inform product director what resources are to be treated as "draft" for this ballot (and for R4).
 
2018-03-11 - FHIR Core content total freeze.  Normative candidates SHALL have QA spreadsheet filled in and pass all QA.  Normative content should have tracker items cleared and no outstanding deferred QA tracker items. QA period opens for core and IG processes
 
2018-03-25 - QA changes may be applied
 
2018-04-01 - Final content freeze - no changes except with permission of product director
 
2018-04-06 - Ballot opens
 
2018-05-07 - Ballot closes
 
2018-05-12 - 2018-05-18: May WGM (Cologne)
 
  
''Optional 3rd ballot''
+
*2018-09-29 - 10-05: October WGM (Baltimore).
2018-07-01: Work groups notify the FMG whether they need to reballot normative packages (due to substantive change), STU resources (due to significant refactoring) or IGs during the Sept. cycle
+
*2018-10-06: Notification of Ballot opens for "final" targeted R4 normative ballots
2018-08-10: All substantive reconciliation applied.  FHIR Core is frozen, limited QA process for content subject to ballot only
+
*2018-10-12: Final reconciliation packages posted for Normative Sept. ballots
2018-08-17: Pre-ballot (and connectathon) content freezePublication process begins, including ensuring that content is appropriately flagged for ballot status and there are no last minute QA issues
+
* Working on R3/R4 conversions (see [[Progress on FHIR R3/R4 conversions]])
2018-08-24: OptionalBallot opens
+
** Changes will be auto-deferred after this date
2018-09-24: Ballot closes and initial triage occurs.  Note: No substantive changes allowed for normative candidates unless they drop to STU.
+
*2018-10-31: Final reconciliation package posted for STU ballot
 +
*2018-11-01: Substantive content freeze for core R4 publication including all substantive QA changes.  Decision based on vote results and withdrawals about which normative packages to drop to STU.  Profiles publishing as part of R4 and implementation guides aiming to publish simultaneously with R4 may continue to make substantive changes.
 +
*2018-11-06: Targeted R4 normative ballot opens
 +
*2018-11-11: Final content freeze for R4 publication and start of QA periodNo changes permitted for FHIR Core without product director permissions.  Implementation Guides may update based on their QA processes
 +
*2018-11-25: QA period closes, QA change application begins
 +
*2018-12-02: FHIR core and FHIR IGs are all lockedNo further changes without product director permission
 +
**Finalization of FMM levels, final internal publication clean-up, publication process
 +
*2018-12-06: Targeted FHIR core ballot closes
 +
*2018-12-07: One-time meeting to reconcile any ballot comments - all out of scope comments will be found Not Related
 +
*2018-12-08: Recirculation ballot opens?
 +
*2018-12-10: Seek approval for publication from TSC (possibly pending recirculation)
 +
*2018-12-22: Recirculation ballot closes?
 +
*before 2018-12-31: Publication of R4
  
''Final content changes and publication''
 
2018-09-29 - 2018-10-05: October WGM (Baltimore).
 
2018-10-14: Final reconciliation packages posted for 2nd and 3rd ballots
 
2018-11-01: Substantive content freeze for core R4 publication including all substantive QA changes.  Decision based on vote results and withdrawals about which normative packages to drop to STU.  Implementation guides publishing as part of R4 may continue to make substantive changes.
 
2018-11-11: Final content freeze for R4 publication and start of QA period.  No changes permitted for FHIR Core without product director permissions.  Implementation Guides may update based on their QA processes
 
2018-11-25: QA period closes, QA change application begins
 
2018-12-02: FHIR core and FHIR IGs are all locked.  No further changes without product director permission
 
Finalization of FMM levels, final internal publication clean-up, publication process, TSC publication approval
 
~2018-12-15: Publication of R4
 
 
The world rejoices, Grahame sleeps
 
The world rejoices, Grahame sleeps
  
 +
===IGs published with R4===
 +
*2018-11-18: Content is final, work group performs and applies QA
 +
*2018-12-02: IG is locked
 +
** qa.html contains no errors or warnings (or Grahame has pre-approved all remaining errors/warnings as insignificant
 +
** WG submits publication request and notifies fmgcontact@hl7.org of their desire to publish with R4
 +
*2018-12-05: FMG votes on whether to publish the IG after reviewing IG and QA page
 +
*2018-12-10: TSC votes on whether to publish the IG (at the same time they vote on R4)
  
 +
Sometime before Dec. 31, depending on FHIR Core recirculation requirements, IG is published alongside R4 spec
  
The current schedule for this release is as follows (dates will become more specific as we get closer):
+
===Jan 2019 ballot cycle for FHIR IGs===
 +
NOTE: There will be no deadline extensions for this cycle.  If you miss a deadline, your content will not appear in the January ballot and will have to wait for the May cycle.
  
*Nov. 2017
+
*2018-10-17 - [[:Category:FHIR_IG_Proposal|IG proposals]] due to the FHIR Management Group. (Earlier is better)
** All resources that are candidates for STU in R4 are included in spec in sufficient form to allow draft review
+
*2018-10-28 - NIBs due, IG must be publishing on the CI build and "functionally complete"
** All artifacts & pages that are candidates for normative are identified to FMG
+
** FMG will be evaluating "need to ballot" - each ballot must be necessary
*Dec. 2017
+
** All artifact types, all key behaviors, etc. present.  If there are bugs in the publication process, they must be identified by this point and must be resolved to the point that the build at least runs successfully and any tooling-related issues must be agreed to be resolvable
** For Comment ballot on FHIR core spec
+
*2018-11-18 - Content deadline for QA. All content must be final from the workgroup perspective - no changes other than QA fixes from this point - no new artifacts or content
*Mar. 2018
+
** Reconciliation packages posted to ballot desktop for previous ballots (if any)
** Final freeze for all R4 content.
+
*2018-12-02 - Final freeze. If there are QA errors at this point, you don't publish. No slippage for any reason
*Apr. 2018 STU/Normative ballot
+
*2018-12-07 - Ballot opens
*Aug 2018
+
-->
** Potential limited ballot on substantive changes to normative artifacts and/or revision of normative scope
 
*Nov 2018
 
** Publication freeze
 
*Dec 2018
 
** R4 published
 

Latest revision as of 21:16, 24 April 2019

A calendar has not yet been established for the FHIR R5 cycle. General ballot timelines for implementation guides can be found on the [HL7 confluence page]