This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Conformance Sep 2018 WGM Agenda"

From HL7Wiki
Jump to navigation Jump to search
(Created page with " =Proposed Agenda= Titles of quarters are agreed upon but agenda was copied from the last WGM. Contents of quarters is still being discussed. == Sunday == <table border="1" ...")
 
Line 42: Line 42:
 
  <tr>
 
  <tr>
 
   <th bgcolor="#aef3e7">Q1</th>
 
   <th bgcolor="#aef3e7">Q1</th>
 +
  <td colspan="3"><i>not meeting - Plenary</i></td>
 +
</tr>
 +
<tr>
 +
  <th bgcolor="#aef3e7">Q2</th>
 +
  <td colspan="3"><i>not meeting - Plenary</i></td>
 +
</tr>
 +
<tr>
 +
  <td bgcolor="#aef3e7" colspan="5">Lunch</td>
 +
</tr>
 +
<tr>
 +
  <th bgcolor="#aef3e7">Q3</th>
 
   <td>
 
   <td>
  
 
===Admin===
 
===Admin===
 
*Review and make final changes for agenda for WGM
 
*Review and make final changes for agenda for WGM
*Review Group Health Items
+
*Review minutes from WGM and approve
**Review and approve SWOT
 
**Review and approve DMP
 
**Review and approve Mission & Charter
 
**Review and approve 3 year plan
 
 
*Projects review
 
*Projects review
 
*Review Gforge tracker items (new, assigned, open, etc.)
 
*Review Gforge tracker items (new, assigned, open, etc.)
 +
*Health Metrics (optional)
  
 
   </td>
 
   </td>
   <td>Leeward - Riverside Bldg</td>
+
   <td>Guest Room 308</td>
 
   <td>
 
   <td>
 
*Host: Conformance
 
*Host: Conformance
Line 63: Line 71:
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
   <th bgcolor="#aef3e7">Q2</th>
+
   <th bgcolor="#aef3e7">Q4</th>
 
   <td>
 
   <td>
  
Line 69: Line 77:
  
 
Primary Topics
 
Primary Topics
*Review and finalize PSS
 
**Data Type Flavor PSS
 
**Conformance Specification (move Chapter 2b out) PSS
 
*Master (Standard) Data Type Library
 
*Using FHIR Structured Definition to represent V2 profiling (if time)
 
 
Additional topics if there is time and interest
 
 
* Cross Paradigm Implementation Guide
 
* Cross Paradigm Implementation Guide
 
* Conformance length in HL7 v2
 
* Conformance length in HL7 v2
Line 82: Line 83:
 
** Need to write it down - Position Statement / White Paper? Will go into Conformance Chapter / Best Practices
 
** Need to write it down - Position Statement / White Paper? Will go into Conformance Chapter / Best Practices
 
* Unified Conformance Model - How they relate to FHIR
 
* Unified Conformance Model - How they relate to FHIR
 +
 +
Additional topics if there is time and interest
 
* Implementation Guide Template  
 
* Implementation Guide Template  
 
** Standardized conformance section (Boiler plate language that defines the definitions of conformance the way we want it defined. Included directly or referenced.)
 
** Standardized conformance section (Boiler plate language that defines the definitions of conformance the way we want it defined. Included directly or referenced.)
Line 100: Line 103:
  
 
</td>
 
</td>
   <td>Leeward - Riverside Bldg</td>
+
   <td>Guest Room 308</td>
 
   <td>
 
   <td>
 
*Host: Conformance
 
*Host: Conformance
Line 107: Line 110:
 
   </td>
 
   </td>
 
  </tr>
 
  </tr>
<tr>
 
  <td bgcolor=#dddddd colspan="4">Lunch</td>
 
</tr>
 
<tr>
 
  <th bgcolor="#aef3e7">Q3</th>
 
  <td colspan="3"><i>not meeting - <font color="red">Conformance Tutorial</font></i></td>
 
</tr>
 
<tr>
 
  <th bgcolor="#aef3e7">Q4</th>
 
  <td colspan="3"><i>not meeting - <font color="red">Conformance Tutorial</font></i></td>
 
</tr>
 
 
  
 
</table>
 
</table>
Line 125: Line 116:
 
<table border="1" width="100%" cellspacing="0">
 
<table border="1" width="100%" cellspacing="0">
 
<!-- ----------------------------------------------- TUESDAY -->
 
<!-- ----------------------------------------------- TUESDAY -->
 
 
  <tr>
 
  <tr>
 
   <th bgcolor="#0f7173" width="10%"><font color="#8ee3ef">Quarter</font></th>
 
   <th bgcolor="#0f7173" width="10%"><font color="#8ee3ef">Quarter</font></th>
Line 132: Line 122:
 
   <th bgcolor="#0f7173" width="20%"><font color="#8ee3ef">Responsibilities</font></th>
 
   <th bgcolor="#0f7173" width="20%"><font color="#8ee3ef">Responsibilities</font></th>
 
  </tr>
 
  </tr>
 
 
  <tr>
 
  <tr>
 
   <th bgcolor="#aef3e7">Q1</th>
 
   <th bgcolor="#aef3e7">Q1</th>
   <td>
+
   <td colspan="3"><i>not meeting - <font color="red">Conformance Tutorial</font></i></td>
 
 
===Universal Conformance Constructs===
 
*Overall V2/FHIR planning/strategy
 
*Alternative ITS
 
**Using HTTPS status codes
 
*Compare and contrast conformance V2/CDA/V3/FHIR. Provide recommendations.
 
*Complete slides for FHIR.
 
  </td>
 
  <td>Leeward - Riverside Bldg</td>
 
  <td>
 
*Host: Conformance
 
*Chair:
 
*Scribe:
 
  </td>
 
 
  </tr>
 
  </tr>
 
  <tr>
 
  <tr>
 
   <th bgcolor="#aef3e7">Q2</th>
 
   <th bgcolor="#aef3e7">Q2</th>
   <td>
+
   <td colspan="3"><i>not meeting - <font color="red">Conformance Tutorial</font></i></td>
 
 
===Discuss Best Practices for Implementation Guides and Conformance (Position Statements)===
 
Discuss/Edit/Approve Position Statements
 
</td>
 
  <td>Leeward - Riverside Bldg</td>
 
  <td>
 
*Host: Conformance
 
*Chair: Nathan Bunker
 
*Scribe:
 
  </td>
 
 
  </tr>
 
  </tr>
 
 
  <tr>
 
  <tr>
 
   <td bgcolor=#dddddd colspan="4">Lunch</td>
 
   <td bgcolor=#dddddd colspan="4">Lunch</td>
 
  </tr>
 
  </tr>
 
 
  <tr>
 
  <tr>
 
   <th bgcolor="#aef3e7">Q3</th>
 
   <th bgcolor="#aef3e7">Q3</th>
 
   <td>
 
   <td>
 
 
===Joint Discussion with InM===
 
===Joint Discussion with InM===
*Review 2 PSS's that we need their approvals on
+
* Conformance length in HL7 v2
**Data Type Library
+
* Profile identifiers, versioning and how it is used in queries
**Separate Conformance Specification
+
** Query id in MSH-21, review and give best practices
*Alternative ITS
+
* Acknowledgement debrief, update on where we are at with it
**Using HTTPS status codes
 
*Conformance length in HL7 v2
 
*Profile identifiers, versioning and how it is used in queries
 
**Query id in MSH-21, review and give best practices
 
*Acknowledgement debrief, update on where we are at with it
 
  
 
</td>
 
</td>
   <td>Leeward - Riverside Bldg</td>
+
   <td>Guest Room 308</td>
 
   <td>
 
   <td>
 
Host: InM<br/>
 
Host: InM<br/>
Line 219: Line 176:
 
Agenda for demonstrations and discussion will be determined at the start of the quarter based on participants who attend.  
 
Agenda for demonstrations and discussion will be determined at the start of the quarter based on participants who attend.  
  
* Update from Richard Ettema on conformance aspects and tooling from FHIR Connectathon
+
Demonstrations:
* NIST tooling update (if there is time)
+
*AEGIS
 +
**FHIR Conformance testing tool Touchstone
 +
**IHE/HL7/eHEX testing tool DIL
 +
*MDHT for CIMI and CDA (Sean Muir)
 +
*NIST Milestone Progress Review
  
 
</td>
 
</td>
   <td>Bridge - Riverside Bldg</td>
+
   <td>Guest Room 308</td>
 
   <td>
 
   <td>
 
Host: Conformance<br/>
 
Host: Conformance<br/>
Line 237: Line 198:
  
 
A roundtable informal discussion will be held with reports on progress from:
 
A roundtable informal discussion will be held with reports on progress from:
 
+
*Craig Newman: Immunization Guide Balloting
 
+
*Rob Snelick: NIST Tooling Update
 +
*Floyd Eisenberg: Findings from EHR Testing
 +
*Nathan Bunker: Update on IIS Testing and Progress on FHIR Standard to support CDS for Immunizations
  
 
</td>
 
</td>
   <td>Bridge - Riverside Bldg</td>
+
   <td>Guest Room 308</td>
 
   <td>
 
   <td>
 
Host: Conformance<br/>
 
Host: Conformance<br/>
Line 272: Line 235:
 
*Test Script and FHIR Validation  
 
*Test Script and FHIR Validation  
 
</td>
 
</td>
<td>Bridge - Riverside Bldg</td>
+
<td>Palatine A</td>
 
   <td>
 
   <td>
 
Host: Conformance<br/>
 
Host: Conformance<br/>
Line 286: Line 249:
  
 
===General Conformance Discussion (final)===
 
===General Conformance Discussion (final)===
*Looking to cancel this meeting.
 
**Planning for Cologne meeting will be via the listserver/confluence
 
 
Original agenda
 
 
*Review Conformance Tutorial
 
*Review Conformance Tutorial
 
*Wrap-up and Admin
 
*Wrap-up and Admin
 
**Overflow topics
 
**Overflow topics
**May 2018 WGM agenda planning
+
**Jan 2018 WGM agenda planning
  
 
</td>
 
</td>
   <td>Cancelled</td>
+
   <td>Guest Room 308</td>
 
   <td>
 
   <td>
 
Host: Conformance<br/>
 
Host: Conformance<br/>
Chair: Rob<br/>
+
Chair: Frank<br/>
 
Scribe: Nathan
 
Scribe: Nathan
 
</td>
 
</td>
Line 328: Line 287:
  
 
</td>
 
</td>
   <td>Magazine - 3rd Floor</td>
+
   <td>San Remo</td>
 
   <td>Host: Vocab</td>
 
   <td>Host: Vocab</td>
 
  </tr>
 
  </tr>
Line 338: Line 297:
 
*Vocabulary [http://wiki.hl7.org/index.php?title=Binding_Syntax Binding Syntax: Requirements]
 
*Vocabulary [http://wiki.hl7.org/index.php?title=Binding_Syntax Binding Syntax: Requirements]
 
</td>
 
</td>
   <td>Magazine - 3rd Floor</td>
+
   <td>San Remo</td>
 
   <td>Host: Vocab</td>
 
   <td>Host: Vocab</td>
 
  </tr>
 
  </tr>
Line 350: Line 309:
 
===Vocabulary===
 
===Vocabulary===
 
</td>
 
</td>
   <td>Magazine - 3rd Floor</td>
+
   <td>San Remo</td>
 
   <td>Host: Vocab</td>
 
   <td>Host: Vocab</td>
 
  </tr>
 
  </tr>

Revision as of 14:29, 21 May 2018

Proposed Agenda

Titles of quarters are agreed upon but agenda was copied from the last WGM. Contents of quarters is still being discussed.

Sunday

Quarter Agenda Room Responsibilities
Q1 not meeting
Q2 not meeting
Q3 not meeting
Q4 not meeting

Monday

Quarter Agenda Room Responsibilities
Q1 not meeting - Plenary
Q2 not meeting - Plenary
Lunch
Q3

Admin

  • Review and make final changes for agenda for WGM
  • Review minutes from WGM and approve
  • Projects review
  • Review Gforge tracker items (new, assigned, open, etc.)
  • Health Metrics (optional)
Guest Room 308
  • Host: Conformance
  • Chair: Frank
  • Scribe: Nathan
Q4

General Conformance Discussion

Primary Topics

  • Cross Paradigm Implementation Guide
  • Conformance length in HL7 v2
    • Need to write the history
    • What is allowable in constraining?
    • Need to write it down - Position Statement / White Paper? Will go into Conformance Chapter / Best Practices
  • Unified Conformance Model - How they relate to FHIR

Additional topics if there is time and interest

  • Implementation Guide Template
    • Standardized conformance section (Boiler plate language that defines the definitions of conformance the way we want it defined. Included directly or referenced.)
  • Pulling out Chapter 2B. Needs a new title: HL7 V2 Conformance Model ?
    • Higher level of constraint definitions that cross product families
  • General V2 Test Cases
  • Specification of Co-Constraints
    • Issues associated with giving constraints on items such as Observation (OBX) segments. Every guide author is using different ways of defining the co-constraints.
    • Discuss ideas about how to standardize the expression of these co-constraints.
    • Asking for feedback in regards to how this is done in other standards such as V3, FHIR, etc.
  • Need a best-practices/recommendations for properly using conformance
    • Conformance supports business requirements, business rules determine how to process receiving data
    • How to handle HL7 versions you don't expect
  • Data Type Flavors Discussion
  • Conformance statement versus small value set (question from PHER)
  • Test Script and FHIR Validation


Guest Room 308
  • Host: Conformance
  • Chair: Rob
  • Scribe: Nathan

Tuesday

Quarter Agenda Room Responsibilities
Q1 not meeting - Conformance Tutorial
Q2 not meeting - Conformance Tutorial
Lunch
Q3

Joint Discussion with InM

  • Conformance length in HL7 v2
  • Profile identifiers, versioning and how it is used in queries
    • Query id in MSH-21, review and give best practices
  • Acknowledgement debrief, update on where we are at with it
Guest Room 308

Host: InM
Joining: Conformance

Q4 not meeting

Wednesday

Quarter Agenda Room Responsibilities
Q1

Conformance Tooling Demonstrations

Standing quarter to look at tooling efforts.

Agenda for demonstrations and discussion will be determined at the start of the quarter based on participants who attend.

Demonstrations:

  • AEGIS
    • FHIR Conformance testing tool Touchstone
    • IHE/HL7/eHEX testing tool DIL
  • MDHT for CIMI and CDA (Sean Muir)
  • NIST Milestone Progress Review
Guest Room 308

Host: Conformance
Chair: Rob
Scribe: Nathan

Q2

Conformance within Immunization Space

A roundtable informal discussion will be held with reports on progress from:

  • Craig Newman: Immunization Guide Balloting
  • Rob Snelick: NIST Tooling Update
  • Floyd Eisenberg: Findings from EHR Testing
  • Nathan Bunker: Update on IIS Testing and Progress on FHIR Standard to support CDS for Immunizations
Guest Room 308

Host: Conformance
Chair: Nathan
Scribe: Rob

Lunch
Q3

FHIR discussions

  • Versioning FHIR
  • FHIR Conformance Review
    • Original document FHIR_Constraints_and_Rules
    • Review slide set of recommendations for improvements to FHIR to support conformance needs
  • Running Items
    • FHIR Quality Criteria
      • Review of further requests for more/other criteria
    • FHIR StructureDefinition vs. Templates vs. v2 Profiling
      • Constraint Language: Status Update
  • Test Script and FHIR Validation
Palatine A

Host: Conformance
Joining: FHIR-I, Templates
Chair: Ioana
Scribe: Nathan

Q4

General Conformance Discussion (final)

  • Review Conformance Tutorial
  • Wrap-up and Admin
    • Overflow topics
    • Jan 2018 WGM agenda planning
Guest Room 308

Host: Conformance
Chair: Frank
Scribe: Nathan

Thursday

Quarter Agenda Room Responsibilities
Q1

Vocabulary

  • Terminology Quality Assurance
  • Tables Project

Items that can be discussed Thursday AM

  • Table 0163 and 0550.
  • Adding new codes to HL7 tables (what code system to use, what is the process)
  • How to use the new code systems (hl7 table project)
San Remo Host: Vocab
Q2

Vocabulary

San Remo Host: Vocab
Lunch
Q3

Vocabulary

San Remo Host: Vocab
Q4 not meeting

Friday

Quarter Agenda Room Responsibilities
Q1 not meeting
Q1 not meeting

Quarter Times

Quarter Time
Q1 9:00 AM - 10:30 AM
Q2 11:00 AM - 12:30 PM
Q3 1:45 PM - 3:00 PM
Q4 3:30 PM - 5:00 PM