This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "Clinical Oncology Treatment Plan and Summary"

From HL7Wiki
Jump to navigation Jump to search
Line 4: Line 4:
  
 
==Announcements==
 
==Announcements==
 
+
[[#Announcements|Announcements]]
  
 
'''April 30th, 2015 - DSTU Release 2.1 - Available for Comments'''
 
'''April 30th, 2015 - DSTU Release 2.1 - Available for Comments'''

Revision as of 13:26, 3 May 2015

Return to SDWG page.

Wiki page supporting collaborative work on the Clinical Oncology Treatment Plan and Summary. The page will support the development of the Clinical Oncology Treatment Plan and Summary for the May 2013 ballot cycle.

Announcements

Announcements

April 30th, 2015 - DSTU Release 2.1 - Available for Comments

An update has been made to the HL7 Implementation Guide for CDA® Release 2: Clinical Oncology Treatment Plan and Summary, Release 1 - US Realm Draft Standard for Trial Use (DSTU) 2.
The update is available to HL7 members on the Structured Documents Work Group page: http://www.hl7.org/Special/committees/structure/index.cfm The package is named CDAR2_IG_CLONDATA_R1_D2_1_2015_APR
As a DSTU update, this version will not go through the usual HL7 balloting process. It uses the DSTU Update process with industry review on the HL7 wiki.

The full list of changes in this release is documented in the update and can be summarized as:

  1. Incorporation of DSTU Comment #600

During the two week comment period running from May 4, 2015 through May 18th, 2015, please submit your comments here: CLONDATA R1D2.1 Comments including at least your name, item, existing wording, proposed wording, and comment. Thank you.

Draft IG

  • Current draft IG: no draft IG under development

Developing Draft Sample File

  • Current Sample: no draft samples under development

Reference Material

Project Overview
  • Slide decks for SDWG Clinical Oncology Treatment Plan CDA IG Ballot development meetings:
Pertinent CDA Guides
Other Pertinent Material

Meeting Minutes

  • 12-Feb-2013 - meeting canceled
  • 05-Mar-2013