This wiki has undergone a migration to Confluence found Here
Difference between revisions of "CG WG Call Notes leading to 2014 January WGM"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
*** compare the various models in light of the requirements | *** compare the various models in light of the requirements | ||
*** harmonize the various models so that: | *** harmonize the various models so that: | ||
− | **** | + | **** the harmonized DIM accommodates the requirements |
**** as much as possible, there is a minimal effort to adjust each model to the harmonized DIM | **** as much as possible, there is a minimal effort to adjust each model to the harmonized DIM | ||
Revision as of 14:09, 8 October 2013
October 8, 2013 -- Weekly call
Proposed Agenda
- Discuss the revised Project Scope Statement of CG Domain Information Model(s)
- Tooling alternatives: plain UML editor, MDHT, FHIR
- Modelling goal: harmonize the v3, v2, GTR and FHIR models into an agreed-upon DIM
- Modelling approach:
- develop a list of requirements (should actually be in the DAM)
- compare the various models in light of the requirements
- harmonize the various models so that:
- the harmonized DIM accommodates the requirements
- as much as possible, there is a minimal effort to adjust each model to the harmonized DIM
- Need to submit the Cambridge WGM Meeting Minutes by the end of this week