This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

20160217 arb minutes

From HL7Wiki
Revision as of 16:08, 17 February 2016 by Ajulian (talk | contribs) (→‎Agenda)
Jump to navigation Jump to search

ARB - Meeting (Date in Title)

logistics

Teleconferences are held on Tuesday at 4:00pm U.S. Eastern Schedules may be found at HL7.org Conference Call Center


Please join my meeting from your computer, tablet or smartphone.

  1. Join the meeting:
  2. If you cant use voip then capture the PIN from the screen for the above action, then
  • Weekly conference call.
  • For 24/7 customer service please call (844) 844-1322.

Agenda

  1. Call to order
  2. Roll Call
  3. Approval of Agenda and Minutes
  4. Methodology (60 minutes)
    1. What is the role of a product director.
  5. Other business and planning
    1. Next steps for FHIR to RIM RDF
    2. Work with Project services on sunset/withdrawal
      1. (From TSC minutes:

Lynn here to discuss the sunsetting process for standards, particularly CCOW. 5 year period has expired with ANSI. Request has been to republish without ANSI accreditation. Lynn is against that option; republishing without ANSI stamp has multiple issues. If it's being used, it should be reaffirmed. Pat does not disagree. Tony states that INM had a negative comment on the reaffirmation based on the fact that the standard is not being worked on and it's not best practice anymore in the industry. That's the reason they didn't want to go forward with an ANSI reaffirmation. INM submitted a request for withdrawal and they wanted to know if we could retain it on the site as some people still use it. Ken: We asked ARB and Project Services to draft up a process for sunset to include this issue. We don't want a third option to posting standards; it's either an ANSI standard or it's not. But what does it look like to retire a standard? That is the question we're addressing. Paul states that CCOW may no longer be the best practice but if it is the practice in use then it needs to be supported. Ken: So we may want to continue to allow access to sunsetted standards but we won't be doing anything to maintain them. Pat: the other part is that Paul thinks it should be maintained as an active standard if people are using it, even if there's not a new version. Wayne: we shouldn't give the impression that we're actively supporting it. Ken: resubmitting it for ANSI certification doesn't seem to make sense, and maintaining it on our website just says it's available for use. Jean: By withdrawing it, it doesn't appear in our normative package - they can go back to previous normative editions to get it. Lynn will join the group to work on the document.

    1. Define location for HL7 documentation
  1. Adjournment

Meeting Information

HL7 ArB Work Group Meeting Minutes

Location: Telcon

Date: 20160217
Time: 5:00pm U.S. Eastern
Facilitator Julian, Tony/Constable, Lorraine Note taker(s) Julian, Tony//Constable, Lorraine
Attendee Name Affiliation
. Bond,Andy NEHTA
. Constable, Lorraine Constable Consulting Inc.
. Dagnall, Bo HP Enterprise Services
. Hufnagel, Steve ?????
. Hyland, Mario AEGIS
. Julian, Tony Mayo Clinic
. Knapp, Paul Pknapp Consulting
. Loyd, Patrick ICode Solutions
. Lynch, Cecil Accenture
. Milosevic, Zoran Deontik Pty Ltd
. Quinn, John Health Level Seven, Inc.
. Stechishin,Andy CANA Software and Service Ltd.
. Guests
. Mead, Charlie Vidal Group, Paris,France
. McDaniel, Mary Kay Cognosante
.
. Legend
X Present
. Absent
R Regrets
Quorum Requirements (Co-chair + 3) Met: Yes

Minutes