This wiki has undergone a migration to Confluence found Here
Difference between revisions of "20150916 FMG concall"
Jump to navigation
Jump to search
(Created page with "{{subst:: FMG Template}}") |
|||
Line 3: | Line 3: | ||
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC FMG Meeting Minutes''' <br/> | | width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC FMG Meeting Minutes''' <br/> | ||
'''Location: <br>https://global.gotomeeting.com/join/279790597''' <br/>(voice and screen) | '''Location: <br>https://global.gotomeeting.com/join/279790597''' <br/>(voice and screen) | ||
− | | width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2015- | + | | width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2015-09-16 '''<br/> '''Time: 4:00 PM U.S. Eastern''' |
|- | |- | ||
| width="0%" colspan="2" align="right"|'''Chair''': | | width="0%" colspan="2" align="right"|'''Chair''': | ||
Line 35: | Line 35: | ||
*Minutes from [[2015mmdd_FMG_concall]] | *Minutes from [[2015mmdd_FMG_concall]] | ||
*Administrative | *Administrative | ||
− | ** Action items | + | **Action items |
− | *** | + | ***Lloyd to review DSTU 2 QA page for completeness against the QA spreadsheet |
+ | ***Lloyd will send out email to WGs reminding them that 1) if they have outstanding warnings, they've got 4 or 5 days left to get those clear or be dropped to draft and 2) look at QA checklist and, if aiming for level 4 or higher, make sure scopes tab is complete. Will also send out appeal to those in production to let us know what resources they are using. | ||
+ | ***Grahame will send out same call on implementers list. | ||
+ | *Discussion Topics: | ||
+ | **How to we add the review of profiles against resources by the WGs responsible for those resources into the timeline process | ||
+ | **Policy around FHIR-related project proposals that go to TSC without FMG approval | ||
+ | **Will the FMG be an interested party/cosponsor of the ArB project to map FHIR specs to the RIM? Should FIWG be leading the project? | ||
+ | **Where will the new implementer's channel be located; will it be affiliated with FHIR.org; will it be run by someone separate from HL7 or will HL7 run it? | ||
*Reports | *Reports | ||
**Connectathon management (David/Brian) | **Connectathon management (David/Brian) |
Revision as of 19:36, 10 September 2015
HL7 TSC FMG Meeting Minutes Location: |
Date: 2015-09-16 Time: 4:00 PM U.S. Eastern | |
Chair: | Note taker(s): Anne W. |
Quorum = chair + 4 | yes/no | |||||
Co chairs | David Hay | Lloyd McKenzie | ||||
ex-officio | Woody Beeler, Dave Shaver FGB Co-chairs |
. | John Quinn, CTO |
Members | Members | Members | Observers/Guests | ||||
Hans Buitendijk | Brian Postlethwaite | Paul Knapp | Anne W., scribe | ||||
Josh Mandel | John Moehrke | Brian Pech | |||||
. |
Agenda
- Roll Call
- Agenda Check
- Minutes from 2015mmdd_FMG_concall
- Administrative
- Action items
- Lloyd to review DSTU 2 QA page for completeness against the QA spreadsheet
- Lloyd will send out email to WGs reminding them that 1) if they have outstanding warnings, they've got 4 or 5 days left to get those clear or be dropped to draft and 2) look at QA checklist and, if aiming for level 4 or higher, make sure scopes tab is complete. Will also send out appeal to those in production to let us know what resources they are using.
- Grahame will send out same call on implementers list.
- Action items
- Discussion Topics:
- How to we add the review of profiles against resources by the WGs responsible for those resources into the timeline process
- Policy around FHIR-related project proposals that go to TSC without FMG approval
- Will the FMG be an interested party/cosponsor of the ArB project to map FHIR specs to the RIM? Should FIWG be leading the project?
- Where will the new implementer's channel be located; will it be affiliated with FHIR.org; will it be run by someone separate from HL7 or will HL7 run it?
- Reports
- Connectathon management (David/Brian)
- FGB –
- MnM –
- FMG Liaisons –
- Process management
- Ballot Planning
- Ballot content review and QA process FHIR QA Guidelines
- AOB (Any Other Business)
Minutes
Next Steps
Actions (Include Owner, Action Item, and due date) | |||
Next Meeting/Preliminary Agenda Items |
Back to FHIR_Management_Group
© 2015 Health Level Seven® International