This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "2015-12-04 HSI CALL"

From HL7Wiki
Jump to navigation Jump to search
 
(6 intermediate revisions by 2 users not shown)
Line 14: Line 14:
 
| width="35%" colspan="1" align="left"|John Donnelly
 
| width="35%" colspan="1" align="left"|John Donnelly
 
| width="25%" colspan="1" align="right"|'''Note taker(s)'''
 
| width="25%" colspan="1" align="right"|'''Note taker(s)'''
| width="30%" colspan="1" align="left"|John Donnelly
+
| width="30%" colspan="1" align="left"|Laura Heerman-Langford, John Donnelly
 
|-
 
|-
 
| border="4" cellpadding="1" colspan="4" style="background:#f0f0f0;"|
 
| border="4" cellpadding="1" colspan="4" style="background:#f0f0f0;"|
Line 25: Line 25:
 
<!-- ********add attendee information here *********-->
 
<!-- ********add attendee information here *********-->
 
|-
 
|-
| || Keith Boone
+
| X || Keith Boone
 
|colspan="2"| GE
 
|colspan="2"| GE
 
|-
 
|-
Line 74: Line 74:
 
|-
 
|-
 
| X || John Moehrke
 
| X || John Moehrke
|colspan="2"|
+
|colspan="2"| GE Medical
 
|-
 
|-
 
| X || Didi Davis
 
| X || Didi Davis
|colspan="2"|
+
|colspan="2"| The Sequoia Project
 
|-
 
|-
 
|colspan="4" style="background:#f0f0f0;"|
 
|colspan="4" style="background:#f0f0f0;"|
Line 136: Line 136:
 
:::* HSI Roadmap (Project priorities discussion)
 
:::* HSI Roadmap (Project priorities discussion)
 
::::* HSI as co-sponsor of GAO with HL7 CDS/CQI WGs (HSI_ID= 15014 ) - Joint IHE/HL7 Ballot
 
::::* HSI as co-sponsor of GAO with HL7 CDS/CQI WGs (HSI_ID= 15014 ) - Joint IHE/HL7 Ballot
::::* HSI engagement with IHE Lab profiles and Hl7 O&O WG (HSI_ID= 15020)   
+
::::* HSI engagement with IHE Lab profiles and Hl7 O&O WG (HSI_ID= 15020)  (discuss level of engagement and support needed)
::::* IHE ITI CMAP with HL7 Vocab WG (HSI_ID= 15013)
+
::::* IHE PCC CMAP with HL7 Vocab WG (HSI_ID= 15013)
::::* IHE ITI MHD with HL7 SD WG (HSI_ID= 15005)
+
::::* IHE ITI MHD with HL7 SD WG (HSI_ID= 15005) - Coordinate a PSS to create a FHIR based profile?
::::* IHE ITI PIXm/PDQm with HL7 PA WG (HSI_ID= 15006/15007)
+
::::* IHE ITI PIXm with HL7 PA WG (HSI_ID= 15006/15007)
::::* International Patient Summary correlation with multiple SDO's (HSI_ID=15048)
+
::::* IHE PCC RECON with PC WG??
 +
::::* International Patient Summary correlation with multiple SDO's (HSI_ID=15048)  
 +
:::* Method of keeping specifications up to date (change proposals etc) between IHE and Hl7
 
::* Thurs Q4  
 
::* Thurs Q4  
:::* Review tracker for content integrity and identifying WG follow-up for clean-up of tracker rows
+
:::* Review tracker for content integrity and identifying WG follow-up for clean-up of tracker rows HL7 list found at http://wiki.hl7.org/index.php?title=FHIR_Profiles_from_other_Organizations
 
:::* Review Work group Health items
 
:::* Review Work group Health items
  

Latest revision as of 18:32, 11 December 2015

Minutes

Home Healthcare Standards Integration (HSI)

Meeting Information

HL7 HSI Meeting Minutes

Location: Webex 925 644 875

Date: 2015-12-04
Time: 11:00 am PDT
Facilitator John Donnelly Note taker(s) Laura Heerman-Langford, John Donnelly
Attendee Name Affiliation
X Keith Boone GE
Hans Buitendijk Cerner
Chris Carr RSNA
Todd Cooper C4MI
X John Donnelly Intepro Solutions
X Laura Heermann-Langford Intermountain
Emma Jones Allscripts
Elliott Lavy QuadraMed
Alex Lippitt HIMSS
Mary Kay McDaniel Cognosante
Chris Melo Philips
Riki Merrick Vernetzt
X David Pyke Ready Computing
Scott Robertson KP
Elliot Silver McKesson
Bill Kleinebecker
X John Moehrke GE Medical
X Didi Davis The Sequoia Project
Quorum Requirements Met: TBD

Agenda

Agenda Topics

  1. Welcome, attendance, agenda review
  2. Minutes Feedback HL7 HSI 2015-10 Atlanta WGM rev1 rough draft
  3. Finalize Agenda for January WGM (Orlando)
    1. HSI Meeting Agenda (Tuesday & Thursday afternoon)
    2. HSI Roadmap Development
    3. HL7 WG Engagement (aligned to HSI Roadmap priorities)
  4. FHIR Resources in IHE Profiles List
  5. Additional Business

Supporting Documents

  1. HSI Issues Tracker spreadsheet (with proposed priorities)

Minutes

Minutes/Conclusions Reached:

1 Agenda Review

  • Agenda reviewed and approved without modification

2 Approve previous minutes

  • Minutes recently posted. Team asked to review, provide feedback and will be approved at next meeting.

3 Finalize Agenda for January WGM (Orlando)

  • HSI Meeting Agenda
  • Tues Q4
  • HSI Roadmap (Project priorities discussion)
  • HSI as co-sponsor of GAO with HL7 CDS/CQI WGs (HSI_ID= 15014 ) - Joint IHE/HL7 Ballot
  • HSI engagement with IHE Lab profiles and Hl7 O&O WG (HSI_ID= 15020) (discuss level of engagement and support needed)
  • IHE PCC CMAP with HL7 Vocab WG (HSI_ID= 15013)
  • IHE ITI MHD with HL7 SD WG (HSI_ID= 15005) - Coordinate a PSS to create a FHIR based profile?
  • IHE ITI PIXm with HL7 PA WG (HSI_ID= 15006/15007)
  • IHE PCC RECON with PC WG??
  • International Patient Summary correlation with multiple SDO's (HSI_ID=15048)
  • Method of keeping specifications up to date (change proposals etc) between IHE and Hl7
  • Thurs Q4

Action: HSI Chairs will contact the co-chairs of the above HL7 working groups listed above and coordinate times/representatives to discuss at Orlando meetings.

  • HL7 WG Engagement
  • Contact target WG's for potential engagement based on prioritized HSI Tracker PSS's