This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "20140514 FMG concall"

From HL7Wiki
Jump to navigation Jump to search
Line 39: Line 39:
 
** Lloyd will document the format on the wiki for committers to understand that if the tracker number is included in the comment GForge will automatically link to the tracker.   
 
** Lloyd will document the format on the wiki for committers to understand that if the tracker number is included in the comment GForge will automatically link to the tracker.   
 
** the tracking sheet needs to have listed all the CCDA profiles to be created
 
** the tracking sheet needs to have listed all the CCDA profiles to be created
 +
**Can we do an RSS feed to reflect the contents of the skype chat in near-real time
 +
**Need a policy for which old releases we wish to host live, e.g. when the next DSTU full release is provided will the DSTU R1.0 still be available
 +
**Andy will take a look at the security fix on the objective C reference implementation
 +
*David will check with those that supplied the javascript code as well as with the server side javascript problems in the DSTU build to ensure it has the security fix.
 +
**Paul to take to TSC the discussion about relationship between PSSs and balloting. When do committees ballot under their own PSSs vs. FMG's -
 +
*Where/how are FMG precepts documented: e.g.
 +
**RESOLUTION: After a tracker item has been triaged, anyone is allowed to fix things in triage as typos or tooling corrections without special approval to coordinate the fix. After the fix and they commit they must identify the tracker ID in the proper format to establish the linkage and then close the tracker item.
 
*Project reviews
 
*Project reviews
 
**[http://gforge.hl7.org/gf/project/fhir/scmsvn/?action=browse&path=%2F%2Acheckout%2A%2Ftrunk%2Fdocuments%2Fprojects%2FCDA-on-FHIR-PSS-2014-05-09.doc&revision=2494 CDA on FHIR] at Project Insight #1098
 
**[http://gforge.hl7.org/gf/project/fhir/scmsvn/?action=browse&path=%2F%2Acheckout%2A%2Ftrunk%2Fdocuments%2Fprojects%2FCDA-on-FHIR-PSS-2014-05-09.doc&revision=2494 CDA on FHIR] at Project Insight #1098
Line 53: Line 60:
 
-->
 
-->
 
*Process management
 
*Process management
**Ballot Planning
+
**Ballot Planning and [[FHIR_Ballot_Prep]]
 
*AOB (Any Other Business)
 
*AOB (Any Other Business)
  

Revision as of 14:01, 12 May 2014

HL7 TSC FMG Meeting Minutes

Location:
https://global.gotomeeting.com/join/279790597

(voice and screen)

Date: 2014-05-14
Time: 1:00 PM U.S. Eastern
Chair: Note taker(s):
Quorum = chair + 4 yes/no
Co chairs David Hay Lloyd McKenzie
ex-officio Woody Beeler,
Dave Shaver
FGB Co-chairs
. John Quinn, CTO
Members Members Members Observers/Guests
Hans Buitendijk Hugh Glover Paul Knapp Lynn Laakso, scribe
Josh Mandel John Moehrke Brian Pech
.

Agenda

  • Roll Call
  • Agenda Check
  • Minutes from FHIR_Agenda_201405_WGM
  • Action items
    • Lloyd will document the format on the wiki for committers to understand that if the tracker number is included in the comment GForge will automatically link to the tracker.
    • the tracking sheet needs to have listed all the CCDA profiles to be created
    • Can we do an RSS feed to reflect the contents of the skype chat in near-real time
    • Need a policy for which old releases we wish to host live, e.g. when the next DSTU full release is provided will the DSTU R1.0 still be available
    • Andy will take a look at the security fix on the objective C reference implementation
  • David will check with those that supplied the javascript code as well as with the server side javascript problems in the DSTU build to ensure it has the security fix.
    • Paul to take to TSC the discussion about relationship between PSSs and balloting. When do committees ballot under their own PSSs vs. FMG's -
  • Where/how are FMG precepts documented: e.g.
    • RESOLUTION: After a tracker item has been triaged, anyone is allowed to fix things in triage as typos or tooling corrections without special approval to coordinate the fix. After the fix and they commit they must identify the tracker ID in the proper format to establish the linkage and then close the tracker item.
  • Project reviews
    • CDA on FHIR at Project Insight #1098
    • PSS for SDC, others?
  • HL7 Conformance testing?
  • Reports
  • Process management
  • AOB (Any Other Business)

Minutes

Next Steps

Actions (Include Owner, Action Item, and due date)
Next Meeting/Preliminary Agenda Items

2014mmdd FMG concall


Back to FHIR_Management_Group

© 2014 Health Level Seven® International