This wiki has undergone a migration to Confluence found Here
20140702 FMG concall
Jump to navigation
Jump to search
HL7 TSC FMG Meeting Minutes Location: |
Date: 2014-07-02 Time: 1:00 PM U.S. Eastern | |
Chair: | Note taker(s): Lynn |
Quorum = chair + 4 | yes/no | |||||
Co chairs | x | David Hay | x | Lloyd McKenzie | ||
ex-officio | Woody Beeler, Dave Shaver FGB Co-chairs |
x | John Quinn, CTO |
Members | Members | Members | Observers/Guests | ||||
x | Hans Buitendijk | x | Hugh Glover | Paul Knapp | x | Lynn Laakso, scribe | |
x | Josh Mandel | x | John Moehrke | x | Brian Pech | ||
x | Austin Kreisler | ||||||
x | Rick Geimer | ||||||
x | Brett Marquard
|
Agenda
- Roll Call
- Agenda Check
- Minutes from 20140625_FMG_concall
- Administrative
- Action items
- Andy will take a look at the security fix on the objective C reference implementation (Lloyd)
- David will check with those that supplied the javascript code as well as with the server side javascript problems in the DSTU build to ensure it has the security fix.
- Liaison responsibility review/ transfer from Lorraine (Hans)
- check that RP’s for current proposal have correct owner and approve as block. (David)
- Policy statement on pre-DSTU draft for comment ballot rounds for development materials (Lloyd)
- Action items
- Registries update (Lloyd)
- Combined project review for FHIR-CCDA (Austin)
- SDC PSS updates requested (Paul/Lloyd)
- Updates to naming conventions and DSTU release guidance. (Paul)
- Project reviews (new and deferred)
- CQI FHIR update
- Project Approval request of Health Care Devices to Develop FHIR resources and profiles for the second DSTU release for Health Care Devices WG of DESD at Project Insight # 1103 and TSC Tracker #3278
- PA FHIR Resources DSTU2 Project Scope Statement at Project Insight #1102 -
- OO FHIR Results Profile PSS for OO of SSD SD cosponsored by PHER of DESD at Project Insight #1113]
- OO FHIR Lab Orders PSS at Project Insight #1067
- OO FHIR DSTU Maintenance PSS at Project Insight # 1115
- Imaging FHIR Resources PSS at Project Insight # 1107
- Develop Immunization-related FHIR resources for DSTU 2 (Public Health and Emergency Response) at Project Insight #1119
- Project Approval request of Develop FHIR resources for Clinical Genomics for CG WG of DESD at Project Insight # 1110 and TSC Tracker #3366
- Approval for PSS for DSTU2 to send to TSC
- Reports
- Connectathon management (David/Brian)
- FGB –
- Provide input/feedback on Fundamental Principles of FHIR
- MnM –
- FMG Liaisons –
- Process management
- Ballot Planning
- Ballot content review and QA process FHIR QA Guidelines
- AOB (Any Other Business)
Minutes
Convened by Lloyd 1:03 PM; Hugh offers regrets for the next 4 meetings.
- Agenda Check - Rick and Austin have to leave early and would like CCDA on FHIR to be addressed first. John M moves and Hans seconds agenda; unanimously approved
- Combined project review for FHIR-CCDA (Austin)
- Austin reviews the changes in a staged approach to combine the two projects.
- SDWG has endorsed it. FMG's project scope statement is phase 1 and SDWG original scope is phase 2.
- Regarding work product, Lloyd feels the strict alignment of profiles in DSTU track is prescriptive where on an informative track it is descriptive of this is how they currently map.
- Brett notes that the production of two separate tracks loses the flexibility of the DSTU track. Lloyd asks that the scope statement specifically reflect the two intended uses of the DSTU.
- Austin notes that existing projects that have CCDA scope in their work should sign on to this project as cosponsors. Lloyd suggests listing all the WGs that own resources in this space; Austin will obtain the list from the googledocs spreadsheet.
- David moves and Hans seconds endorsement of the PSS. Unanimously approved.
- SDWG reps leave
- Minutes from 20140625_FMG_concall David moves and Josh seconds approval: unanimously approved
- Administrative
- Action items
- Andy will take a look at the security fix on the objective C reference implementation (Lloyd will poke him again)
- David will check with those that supplied the javascript code as well as with the server side javascript problems in the DSTU build to ensure it has the security fix. David will poke them again, too.
- Liaison responsibility review/ transfer from Lorraine (Hans) - Hans will review the list to identify some with whom he can swap as there are some of Lorraine's he's not interested in.
- check that RP’s for current proposal have correct owner and approve as block. (David) postpone
- Policy statement on pre-DSTU draft for comment ballot rounds for development materials (Lloyd) see FHIR_Balloting_Considerations; Hans notes that FHIR "will avoid" out of cycle ballots should be less restrictive. Provide comments and come back to it next week.
- Action items
- Registries update (Lloyd) see FHIR Registry Requirements; Paul still had concerns. JohnM notes that SecurityEvent as a resource not a registry. The registry will create security events is unclear. Lloyd asks for additional wording help. David will take a stab at it. Review updated wording suggestions and get Paul's confirmation so hold off until next week.
- SDC PSS updates requested (Paul/Lloyd) - OO and Patient Care have endorsed the changes which Hans reviews. David asks about questionnaire; owned by Patient Care they are now cosponsors. Hans moves and David seconds approval
- Updates to naming conventions and DSTU release guidance. (Paul) Lynn has not checked with Don on whether we need to keep the entire name in the standard and just use the abbreviation on IGs. Do the IGs need to be tied to a release of FHIR or to a WG. Table until Paul can attend to address.
- Project reviews (new and deferred)
- CQI FHIR update
- Lloyd offers his disclosure
- Hans moves approval. David asks if it could be either resources or profiles, this is clarified in the success criteria and Products sections and seconds the motion. Josh abstains, approved 6/0/1.
- Project Approval request of Health Care Devices to Develop FHIR resources and profiles for the second DSTU release for Health Care Devices WG of DESD at Project Insight # 1103 and TSC Tracker #3278
- David moves acceptance; Hans seconds; unanimously approved.
- PA FHIR Resources DSTU2 Project Scope Statement at Project Insight #1102 -
- David asks about mappings on static models in 3g and should that be necessarily in scope. Since V3 is not the priority it's not an issue. David/Hans move approval - unanimously approved
- OO FHIR Results Profile PSS for OO of SSD SD cosponsored by PHER of DESD at Project Insight #1113]
- Lloyd asks if they will include pathology, chemistry and micro, etc into a single resource; some may be resources, some profiles. Hans/David move approval: unanimously approved.
- CQI FHIR update
Being at time, adjourned 2:01 PM
Next Steps
Actions (Include Owner, Action Item, and due date) | |||
Next Meeting/Preliminary Agenda Items
|
Back to FHIR_Management_Group
© 2014 Health Level Seven® International