INM Transmission and Transport Action Items
Open Action Items. Each item may be edited individually.
- Back to Infrastructure and Messaging TC
- Switch to Other Action Items
== ITEM: 55 == Opened: 27-Sep-04 Old Item: 302
Check for vocabulary gaps in V3 Infrastructure Management (MCCI)
- 09-Nov-04 , Andrew Hinchley , Open , IM
- 28-Nov-05 , Andrew Hinchley , Open , IM
- 20051128_ Telcon No Update
== ITEM: 74 == Opened: 29-Sep-04 Old Item: 321
Clarify concept of session in context of transport documents (as opposed to session as defined by SIGSecure) (Transports)
- 07-Dec-04 , Andrew Hinchley , Open , Trans
- 28-Nov-05 , Andrew Hinchley , Reviewed , Trans
- 20051128 Telcon no status change.
- 20060110, Andrew Hinchley, ATS
- 20060110 InM WGM Phoenix: Clarification of concept belongs in ATS. Defer to future joint meeting between InM ATS and Security TC
Contents
ITEM: 110
Opened: 02-May-05 Old Item: 407
Complete the documentation for Option #2 and resolve the format of the URN (MCCI)
- 02-May-05 , Charlie McCay , New , Attachments and II/IIRef ** Noorwijkerhout
- 28-Nov-05 , Charlie McCay , Open , MCCI
- 20051128 INM Telcon: Move to MCCI
- 20060110, Charlie McKay, Open
- 20060110: WGM: Probably URI instead of URN – related to IIRef discussion. No update.
ITEM: 178
Opened: 10-Jan-05 Old Item: 945
Guidelines for Attachments proposal status (MCCI)
- 12-Jan-05 , Charlie McCay , Closed , XML - A
- 20050112 Added by Larson in response to email thread between INM, CDA and XML.
20050329 INM Telcon: This is being followed by the Attachments Taskforce cited in item 217. This is a multi-group issue: XML, IM
- 05-May-05 , Charlie McKay , Open , XML-A
- 20050505: INM WGM Noordwijkerhout: Gregor has produced some documentation. Need agenda time at the next meeting.
- 15-Sep-05 , Charlie McKay , Open , XML-A
- 20050915 Need agenda time at Scottsdale meeting
- 28-Nov-05 , Charlie McKay , Open , MCCI
- 20051128 INM Telcon Move to MCCI
- 20060110 , Charlie McKay , Open
- 20060110: WGM: still open, Charlie McKay has stated he’ll work with INM to solve this within a reasonable time.
== ITEM: 958 == Opened: 26-Jul-05 Old Item: 0
MCCI - Check preface (MCCI)
- 26-Jul-05 , Tony Julian , New , MCCI
- 20050726: INM Telcon: Joann reported that HQ needs for us to include the previously balloted name in the preface. This document was originally balloted as a component of the Infrastructure Management document
- 13-Sep-05 , Tony Julian , Reviewed , MCCI
- 20050913: INM WGM San Diego: no update.
- 28-Nov-05 , Tony Julian , Reviewed , MCCI
- 20051128 INM Telcon: will be applied on next ballot.
- 20050110: WGM: item will remain open as a reminder to the editor of the next release of MCCI.
== ITEM: 978 == Opened: 15-Sep-05 Old Item: 0
Work to add a new batch group class to the batch transmission wrapper. (MCCI)
- 15-Sep-05 , Penny Aitchson , Open , IM
- 2005-09-15 SAN WGM: New action item. The new class will contain attributes such as batch ID. A new sequence number needs to be added to the current batch class as well. New dynamic models, interactions, etc. need to be documented.
- 15-Sep-05 , Penny Aitchson , Open , MCCI
- 20051128 INM Telcon: Move to MCCI, discuss in Phoenix.
== ITEM: 1003 == Opened: 03-Oct-05 Old Item: 0
Prepare Project Scope and RFI for ebXML (ebXML)
- 03-Oct-05 , Doug Pratt , New , ebXML
- 20051003: Prepare Project Scope and RFI for ebXML Due Oct 17
- 20051115: Doug, open
- Next ballot cycle
- 20060329: Doug, open
- Ballot deadline for May 2006 was missed. Pubs material has been created/updated by Paul Knapp. Planned to have this up for ballot in September 2006.
== ITEM: 1012 == Opened: 03-Oct-05 Old Item: 0
Inquire of Pubs and MNM as to the proper name for WSnnn (Webservices)
- 03-Oct-05 , Joann Larson , New , WSP
- 20051003: INM Telcon: Reconciliation of negative line item 5 in WSP September 2005 ballot. Agreement reached that the WSnnn things (Implementation Guidelines) will be changed to a name that is consistent with similar instances in other domains. Need to follow-up with Pubs and MNM as to the proper name.
== ITEM: 1014 == Opened: 03-Oct-05 Old Item: 0
Post MLLP reconcillation package (MLLP)
- 03-Oct-05 , Tony Julian , New , MLLP
- Post Reconcillation Package
- 20051114: still open
== ITEM: 1018 == Opened: 10-Oct-05 Old Item: 0
Seek harmonization of definitions in glossary for Sender and Receiver. (Webservices)
- 10-Oct-05 , Joann Larson , New , WSP
- 20051010: INM Telcon: Seek harmonization of definitions in glossary for Sender and Receiver. Specifically need to follow-up with Pubs. Roberto will send info to Joann.
- 20060110, Joann Larson, open, Webservices
- 20060110: Phoenix WGM: Still open as above. Roberto will harmonize the definition within Transports. Joann will submit to HQ glossary keeper.
ITEM: 1019
Opened: 24-Oct-05
Add Messaging Adapter and Interaction Patterns as used in MCCI to the Glossary. (MCCI)
- 20051024, René Spronk, New
- Work with pubs to add definitions to the glossary. MCCI R2 C1 Ballot reconcillation, database Items 4 and 5
- 20051126, René Spronk, Open
- See INM Glossary for draft definitions. Need definitions first, then talk to pubs about adding them to the glossary.
- 20060110, René Spronk, Open
- 20060110: WGM: No update, WIKI contains draft descriptions..
- 20060329, René Spronk, Open
- The committee (after reviewing the definitions on the Wiki) should request pubs to add these definitions to the glossary.
ITEM: 1020
Opened: 24-Oct-05
Harmonize V3 Guide descriptions of Wrappers with the current infrastructure ballot (MCCI).
- 20051024, René Spronk, New
- MCCI R2 C1 Ballot Reconcillation of database Item 14. This new release of MCCI is (by the very fact that it is a new release) out of sync with the v3guide. Work with publishing to change the v3guide.
- 20060339, René Spronk, open
- See Message Wrappers section of the v3Guide. This is the current text which will require significant editing.
ITEM: 1026
- Opened 20051121
Add text to the ATS about Message Exchange Patterns, and remove from WS profile. (Webservices)
- 20051121, Roberto, new
- This work item is in reference to Item 20 in the WS ballot, Section 3.3.1. New wording to be created jointly with Miroslav Koncar, editor of the ATS document.
- 20051212, Roberto, Open
- Rene: Is this the equivalent of Transmission Pattern or Interaction Pattern ?
- 20060324: It is the equivalent of Transmission Pattern. The wiki page has some wording related to MEPs.
ITEM: 1036
Opened: 20060109
Create Wiki paper on approaches to dealing with duplicate transmission (MCCI)
- 20060109, Rene Spronk, new
- 20050109: Discussion: do we want HL7 to prescribe the way to deal with it? No one size fits all solution. Does the way to deal with duplicates depend on message infrastructure used? – No, that just affects the amount of lost messages. What is a valid reason to resend with the same message.id? – should one always use a new Message.id on a resend? Do we need a “this is a duplicate of message x” attribute? Create a list of pro and cons of various approaches. Replay messages obviously contain duplicate message.ids. Detection of duplicate order (via business ID) is different from a duplicate Transmission (message.id). From sender perspective: no application response [although one was expected], what should a sender do?
ITEM: 2001
Opened: 20060112
Committee consider the mechanisms to support the fragmentation of a large message. (MCCI)
- 20060112, Rene Spronk, new
- If the committee decides not to support this in the standard at this point in time – it should recommend possible alternatives options. (Mark Tucker/Jeff Jacobs 13-0-1 Jan06 WGM THU Q4)
ITEM: 2004
Opened: 20060320
Compile list of MCCI trigger event names that are candidates for renaming. (MCCI)
- 20060320, Paul Biron, new
- Line item 7 against the MCCI September 2005 ballot section 4.3.2, submitted by Paul Biron was found Not Persuasive. It was determined that a number of names would need to be changed, if the "Send Response Batch" Trigger name were to be renamed. Paul will compile a list of trigger events names that he thinks should be changed. Will be posted prior to the out-of-cycle meeting.
ITEM: 2007
Opened: 20060110
Are Gateways always trusted? - Abstract Transport Spec, security items (ATS)
- 20060110, unsassigned, new, ATS/security
- 20060110: Phoenix WGM: Issue: Are the Gateways always trusted? Is there a use case or a possibility of a highly distributed environment where Gatewys are *not* trusted? Need to resolve ATS Line item 52
ITEM: 2008
Opened: 20060110
What are the security requirements for the messaging infrastructure? - Abstract Transport Spec, security items (ATS)
- 20060110, Glen Marshal, new, security
- 20060110: Phoenix WGM: Add per Miroslav’s request. Needed to finalize the ATS document. What are the security requirements for the messaging infrastructure?
ITEM: 2009
Opened: 20060110
Schedule calls for continued ballot resolution. - Abstract Transport Spec, security items (Security)
- 20060110, Glen Marshal, new, security
- 20060110: PHX WGM: Added action item.
ITEM: 2010
Opened: 20060110
Reconcile discrepancy between ATS and WSP regarding Reliable Messaging, ATS/Webservices profile (Webservices)
- 20060110, Roberto Ruggeri, New, Webservices/ATS
- 20060110: Phoenix WGM: Item added to reconcile decision to make Reliable Messaging non-mandatory with the Abstract Transport Spec which requires “all” transports to be reliable.
ITEM: 2011
Opened: 20060112
Identify differences. (Points of divergence) between RAMP and HL7 WS profile. (Webservices)
- 20060112, Chris Ferris, new, transports/RAMP
- 20060112 INM WGM: To identify differences. (Points of divergence) between RAMP and HL7 WS profile.
- 20060329, Chris Ferris, open, transports/RAMP
- (via e-mail) Chris indicates he will create such a document and present it at the WGM.
ITEM: 2012
Opened: 20060112
To coordinate a determination effort whether RAMP is a profile that is of benefit to HL7, and if so, to ask the HL7 Board to recommend to an appropriate Standards Organization (e.g. WS-I) that they take RAMP up as a work item. (organizational)
- 20060112, Joann Larson, new, transports
- 20060112 INM WGM: To coordinate a determination effort whether RAMP is a profile that is of benefit to HL7, and if so, to ask the HL7 Board to recommend to an appropriate Standards Organization (e.g. WS-I) that they take RAMP up as a work item.
ITEM: 2013
Opened: 20060112
Discuss RAMP and delta-document as created by Chris Ferris (organizational)
- 20060112, co-chairs, new, transports
- by (a) schedule agenda time joint with HL7 WS profile topic during the next WGM, and (b) schedule special-Telcon, with WS knowledgeable people attending, to discuss RAMP.
- 20060329 E-mail has been sent to chrisfer@us.ibm.com (the e-mail address as contained in the minutes is wrong, it identifies a different "Chris" within IBM USA)
- 20060329 (via e-mail) Chris indicates he will create such a document and present it at the WGM. Reminder to add this as an agenda item has been added to the draft San Antonio agenda.
ITEM: 2014
Opened: