PHER ballot materials
Contents
- 1 PHER ballot materials: Public health domain (PORR/RCRIM)
- 2 PHER ballot materials: Immunization domain (POIZ)
- 3 PHER ballot materials: Domain models
- 4 PHER ballot materials: CMETs
- 4.1 A_SpatialCoordinate universal (COCT_RM960000UV)- NORMATIVE
- 4.2 R_Subject universal (COCT_MT560000) - NORMATIVE
- 4.3 R_InvestigativeSubject universal (COCT_MT550000) - NORMATIVE
- 4.4 E_PublicHealth Entity universal (COCT_RM840000UV)
- 4.5 R_ExposureAgentCarrier universal (COCT_RM410000UV)
- 4.6 R_ExposureAgentFomite universal (COCT_RM411000UV)
- 4.7 R_ExposureAgentVector universal (COCT_RM410300UV)
- 4.8 R_PublicHealthContactPerson universal (COCT_RM850000UV)
- 4.9 A_PublicHealthStatement (local CMET)
- 5 January ballot timetable
PHER ballot materials: Public health domain (PORR/RCRIM)
Status as of 5/5/2008
Case notification - NORMATIVE
- Last balloted: ??
- Last ballot level: ??
- Last ballot result: Passed --> NORMATIVE
- Next ballot planned: ??
- Next activity/ballot level: Revise
Investigation request
- Last balloted: Jan 2007
- Last ballot level: DFC1
- Last ballot result: Comments received
- Next ballot planned: ??
- Next activity/ballot level: ??
Case management
- Last balloted: May 2007
- Last ballot level: DFC2
- Last ballot result: Comments received
- Next ballot planned: not certain, NOT Sept 2008
- Next activity/ballot level: ??
Outbreak management
- Last balloted: Jan 2008
- Last ballot level: C1
- Last ballot result: Failed
- Next ballot planned: Sept 2008
- Next activity/ballot level: DSTU 1
PHER ballot materials: Immunization domain (POIZ)
Immunization Administration - DSTU
- Last balloted: May 2008
- Last ballot level: DSTU3
- Last ballot result: Passed, negatives received --> resolved
- Next ballot planned: None
- Next activity/ballot level: Release as DSTU
Immunization DAM
- Last balloted: None
- Last ballot level: None
- Last ballot result: None
- Next ballot planned: Jan 2009
- Next activity/ballot level: Informative 1
PHER ballot materials: Domain models
Tuberculosis DAM
- Last balloted: Sept 2008
- Last ballot level: Informative 2
- Last ballot result: Passed, comments only
- Next ballot planned: Up to CIC
- Next activity: Transferred to CIC
Vital Records DAM
- Last balloted: n/a
- Last ballot level: n/a
- Last ballot result: n/a
- Next ballot planned: January 2009?
- Next activity/ballot level: Informative 1
PHER ballot materials: CMETs
A_SpatialCoordinate universal (COCT_RM960000UV)- NORMATIVE
- Last balloted: Jan 2007
- Last ballot level: CMET membership, M5
- Last ballot result: Passed --> NORMATIVE
- Next activity/ballot level: Make sure correct material is in 2008 Normative Edition
R_Subject universal (COCT_MT560000) - NORMATIVE
- Last balloted: Jan 2008
- Last ballot level: CMET membership, Release 6, M3
- Last ballot result: CMET ballot passed. No negatives on this CMET received.
R_InvestigativeSubject universal (COCT_MT550000) - NORMATIVE
- Last balloted: Jan 2008
- Last ballot level: CMET membership, Release 6, M3
- Last ballot result: CMET ballot passed. No negatives on this CMET received.
E_PublicHealth Entity universal (COCT_RM840000UV)
- Last balloted: Jan 2008
- Last ballot level: CMET committee, Release 6, C3
- Last ballot result: CMET ballot passed; no negatives received on this CMET
- Next ballot planned: Sept 2008
- Next activity/ballot level: CMET normative
Additional CMETs derived from E_PublicHealth Entity universal, to be balloted at membership Sept 2008
840100 E_PublicHealthNonPersonLivingSubject universal
840200 E_PublicHealthPerson universal
840300 E_PublicHealthVector universal
840500 E_PublicHealthPathogen universal
841000 E_PublicHealthFomite universal
841100 E_PublicHealthMaterial universal
841200 E_PublicHealthManufacturedMaterial universal
841300 E_PublicHealthPlace universal
841400 E_PublicHealthOrganization universal
841500 E_PublicHealthPhysicalEntity universal
R_ExposureAgentCarrier universal (COCT_RM410000UV)
- Last balloted: Jan 2008
- Last ballot level: CMET committee, Release 6, C3
- Last ballot result: CMET ballot passed; no negatives received on this CMET
- Next ballot planned: Sept 2008
- Next activity/ballot level: CMET normative
R_ExposureAgentFomite universal (COCT_RM411000UV)
- Last balloted: Jan 2008
- Last ballot level: CMET committee, Release 6, C3
- Last ballot result: CMET ballot passed; no negatives received on this CMET
- Next ballot planned: Sept 2008
- Next activity/ballot level: CMET normative
R_ExposureAgentVector universal (COCT_RM410300UV)
- Last balloted: Jan 2008
- Last ballot level: CMET committee, Release 6, C3
- Last ballot result: CMET ballot passed; no negatives received on this CMET
- Next ballot planned: Sept 2008
- Next activity/ballot level: CMET normative
R_PublicHealthContactPerson universal (COCT_RM850000UV)
- Last balloted: ?? (NOT since May 2006)
- Last ballot level: ??
- Last ballot result: ??
- Next ballot planned: ??
- Next activity/ballot level: ??
A_PublicHealthStatement (local CMET)
- Last balloted: ??
- Last ballot level: ??
- Last ballot result: ??
- Next ballot planned: ??
- Next activity/ballot level: Working with Structured Documents on CDA and Clinical Statement
January ballot timetable
- September 28 (Sunday): CCBCI forms due
Scope statement for new content; Intent to reconcile & advance status (Comm to Mbr or Mbr to Norm); Ballot modality selection (domain or topic)
- October 26 (Sunday) - T minus 5: Notification of Intent to Ballot Deadline
By this deadline, all Notification of Intent to Ballot (NIB) forms should be compete. Notifications received after this deadline will not be considered for the current ballot cycle.
- November 2 (Sunday) - T minus 4: Initial Content Due – For All Submissions
Initial content is required from all committees which have stated an intent to publish material in the ballot. Submissions should be as complete as possible, particularly for a first-time ballot. In all cases, the submission should indicate the topics and artifacts that will be included in the forthcoming ballot.
- November 9 (Sunday) - T minus 3: Preview Content Due – XML-based Submissions
All content to be included in the preview site is due. In addition, some content (even draft or incomplete content) is required of each committee to allow generation and lay-out testing of the complete ballot site. The Ballot Preview site (based on the previous ballot) will go live.
- November 16 (Sunday) - T minus 2: Reconciliation, Complete & Supporting Content Deadlines – All Submissions
All previous ballot reconciliations must be completed and appropriately captured on the ballot website. (See policy note below.) Word-based Submissions: Complete content is required from each participating committee. Only minor corrections to content will be considered after this deadline. XML-based Submissions: All final, domain supporting content (specifically the Visio and/or Design Repositories) must be available for use in generating graphics, Excel views, table views, schemas, etc.
- November 23 (Sunday) - T minus 1: Final Content Deadline – XML-based Submissions:
All final Version 3 content is required. Only changes expressly requested by the technical publishers will be made to content after this deadline.
- December 3 (Monday) - T minus 0: Provisional Ballot Opening
This is the earliest date that the ballot site can open and be announced to the membership. In any event, the ballot must open before the end of this week.
- January 5 (Monday): Projected Ballot Close