This wiki has undergone a migration to Confluence found Here
Difference between revisions of "ELRR2"
Jump to navigation
Jump to search
Line 56: | Line 56: | ||
<!--*List issues or link to issues tracking repository ([[Template:NEW_V3_Publishing_Issue|wiki pages]] or [http://gforge.hl7.org/gf/project/ GForge]) | <!--*List issues or link to issues tracking repository ([[Template:NEW_V3_Publishing_Issue|wiki pages]] or [http://gforge.hl7.org/gf/project/ GForge]) | ||
--> | --> | ||
− | *Link to Issues Worksheet: [[Media: | + | *Link to Issues Worksheet: [[Media:ELR251R2_Issueslist.xlsx ELR251R2_Issueslist.xlsx]] |
==Project Documents== | ==Project Documents== |
Revision as of 00:49, 24 January 2013
Project Page for HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm)
Return to Public Health and Emergency Response
- Project co-sponsors
Project Information
Create a Release 2 of the HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, (US Realm).
In addition, this effort will align the ELR IG to the Laboratory Results Interface ( LRI ) IG, but also harmonize LRI wth the ELR .
This project would include the following work products:
- 1) A document: HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- 2) Profile to constrain “Version 2.5.1 Implementation Guide: Laboratory Results Interface for US Realm, Release 1 HL7 Version 2.5.1: ORU^R01 Draft Standard for Trial Use” (LRI DSTU) to conform with HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- a. The ultimate goal of this activity to create an implementation guide that is harmonized with the OO sponsored S&I LRI, Laboratory Orders Initiative (LOI), and Electronic Directory of Services (eDOS) implementation guides so that all documents can be balloted as Normative Standards at the same time
- 3) Associated message profiles
Specific Features and Functions include:
- 1) IG document
- 2) Message profiles
- a. Implementation profile for base ORU-R01
Name the project facilitators
- Rita Altamore (WA State DOH) Rita.Altamore@DOH.WA.GOV
- Erin Holt (TN State DOH) erin.holt@tn.gov
- Eric Haas (Contractor for APHL) ehaas@tsjg.com
- Riki Merrick (Contractor for APHL) rikimerrick@gmail.com
Link to project scope statement
Status
- PSS initially approved by PHER, OO, CGIT, and TSC at Jan WGM undergoing revisions to align with S&I Laboratory guide development.
- IG in Draft stage and under review by PHER, OO, and other interested parties. see link below
Issues/Hot Topics
- Link to Issues Worksheet: Media:ELR251R2_Issueslist.xlsx ELR251R2_Issueslist.xlsx
Project Documents
- Link to Draft IG: Media:HL7v2.5.1 IG ELR R2 PHER DRAFT FOR COMMENT.docx
- Link to Outline and Notes document: Media:ELR R2 Project Outlne with notes on changes and outstanding issues.docx