This wiki has undergone a migration to Confluence found Here
Difference between revisions of "ELRR2"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
====Name the project facilitators==== | ====Name the project facilitators==== | ||
*Rita Altamore (WA State DOH) [mailto:Rita.Altamore@DOH.WA.GOV Rita.Altamore@DOH.WA.GOV] | *Rita Altamore (WA State DOH) [mailto:Rita.Altamore@DOH.WA.GOV Rita.Altamore@DOH.WA.GOV] | ||
− | * Eric Haas (Contractor for APHL) [mailto:ehaas@tsjg.com ehaas@tsjg.com] | + | *Erin Holt (TN State DOH) [mailto:erin.holt@tn.gov erin.holt@tn.gov] |
+ | *Eric Haas (Contractor for APHL) [mailto:ehaas@tsjg.com ehaas@tsjg.com] | ||
*Riki Merrick (Contractor for APHL) [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)--> | *Riki Merrick (Contractor for APHL) [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)--> | ||
Revision as of 16:17, 15 January 2013
Project Page for HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm)
Return to Public Health and Emergency Response
- Project co-sponsors
Project Information
Create a Release 2 of the HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, (US Realm).
In addition, this effort will align the ELR IG to the Laboratory Results Interface ( LRI ) IG, but also harmonize LRI wth the ELR .
This project would include the following work products:
- 1) A document: HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- 2) Profile to constrain “Version 2.5.1 Implementation Guide: Laboratory Results Interface for US Realm, Release 1 HL7 Version 2.5.1: ORU^R01 Draft Standard for Trial Use” (LRI DSTU) to conform with HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- 3) Associated message profiles
Specific Features and Functions include:
- 1) IG document
- 2) Message profiles
- a. Implementation profile for base ORU-R01
Name the project facilitators
- Rita Altamore (WA State DOH) Rita.Altamore@DOH.WA.GOV
- Erin Holt (TN State DOH) erin.holt@tn.gov
- Eric Haas (Contractor for APHL) ehaas@tsjg.com
- Riki Merrick (Contractor for APHL) rikimerrick@gmail.com
Link to project scope statement
Status
- PSS reviewed and approved by PHER and OO, awaiting review by CGIT at Jan WGM
- IG in Draft stage, see link below
Issues/Hot Topics
Project Documents
- Link to Draft IG: Media:HL7v2.5.1 IG ELR R2 PHER DRAFT FOR COMMENT.docx
- Link to Outline and Notes document: Media:ELR R2 Project Outlne with notes on changes and outstanding issues.docx