This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "ELRR2"

From HL7Wiki
Jump to navigation Jump to search
Line 31: Line 31:
 
====Name the project facilitators====
 
====Name the project facilitators====
 
*Rita Altamore (WA State DOH) [mailto:Rita.Altamore@DOH.WA.GOV Rita.Altamore@DOH.WA.GOV]
 
*Rita Altamore (WA State DOH) [mailto:Rita.Altamore@DOH.WA.GOV Rita.Altamore@DOH.WA.GOV]
* Eric Haas (Contractor for APHL) [mailto:ehaas@tsjg.com ehaas@tsjg.com]
+
*Erin Holt (TN State DOH) [mailto:erin.holt@tn.gov erin.holt@tn.gov]
 +
*Eric Haas (Contractor for APHL) [mailto:ehaas@tsjg.com ehaas@tsjg.com]
 
*Riki Merrick (Contractor for APHL)  [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)-->
 
*Riki Merrick (Contractor for APHL)  [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)-->
  

Revision as of 16:17, 15 January 2013


Project Page for HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm)

Return to Public Health and Emergency Response

Project Information

Create a Release 2 of the HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, (US Realm).

In addition, this effort will align the ELR IG to the Laboratory Results Interface ( LRI ) IG, but also harmonize LRI wth the ELR .

This project would include the following work products:

  • 1) A document: HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
  • 2) Profile to constrain “Version 2.5.1 Implementation Guide: Laboratory Results Interface for US Realm, Release 1 HL7 Version 2.5.1: ORU^R01 Draft Standard for Trial Use” (LRI DSTU) to conform with HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
  • 3) Associated message profiles


Specific Features and Functions include:

  • 1) IG document
  • 2) Message profiles
    • a. Implementation profile for base ORU-R01

Name the project facilitators

Link to project scope statement

media:PSS_ELR_r4.doc


Status

  • PSS reviewed and approved by PHER and OO, awaiting review by CGIT at Jan WGM
  • IG in Draft stage, see link below

Issues/Hot Topics

Project Documents