This wiki has undergone a migration to Confluence found Here
Difference between revisions of "ELRR2"
Jump to navigation
Jump to search
Line 34: | Line 34: | ||
*Riki Merrick (Contractor for APHL) [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)--> | *Riki Merrick (Contractor for APHL) [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)--> | ||
====Link to project scope statement==== | ====Link to project scope statement==== | ||
− | [[ | + | [[media:PSS_ELR_r4.doc]] (waiting for CGIT approval) |
<!--*Name the [http://www.hl7.org/listservice/index.cfm? project listserv] if a special one exists | <!--*Name the [http://www.hl7.org/listservice/index.cfm? project listserv] if a special one exists | ||
--> | --> |
Revision as of 06:51, 4 January 2013
Project Page for HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm)
Return to Public Health and Emergency Response
- Project co-sponsors
Project Information
Create a Release 2 of the HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, (US Realm).
In addition, this effort will align the ELR IG to the Laboratory Results Interface ( LRI ) IG, but also harmonize LRI wth the ELR .
This project would include the following work products:
- 1) A document: HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- 2) Profile to constrain “Version 2.5.1 Implementation Guide: Laboratory Results Interface for US Realm, Release 1 HL7 Version 2.5.1: ORU^R01 Draft Standard for Trial Use” (LRI DSTU) to conform with HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
- 3) Associated message profiles
Specific Features and Functions include:
- 1) IG document
- 2) Message profiles
- a. Implementation profile for base ORU-R01
Name the project facilitators
- Rita Altamore (WA State DOH)
- Eric Haas (Contractor for APHL) ehaas@tsjg.com
- Riki Merrick (Contractor for APHL) rikimerrick@gmail.com
Link to project scope statement
media:PSS_ELR_r4.doc (waiting for CGIT approval)
Status
- PSS reviewed and approved by PHER and OO, awaiting review by CGIT at Jan WGM
- IG in Draft stage, see link below
Issues/Hot Topics
Project Documents
- Link to Draft IG: file