This wiki has undergone a migration to Confluence found Here
<meta name="googlebot" content="noindex">

Difference between revisions of "ELRR2"

From HL7Wiki
Jump to navigation Jump to search
Line 34: Line 34:
 
*Riki Merrick (Contractor for APHL)  [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)-->
 
*Riki Merrick (Contractor for APHL)  [mailto:rikimerrick@gmail.com rikimerrick@gmail.com] <!--(add contact info if desired)-->
 
====Link to project scope statement====
 
====Link to project scope statement====
[[PSS rev 4 waiting for CGIT approval]]
+
file (waiting for CGIT approval)
 
<!--*Name the [http://www.hl7.org/listservice/index.cfm? project listserv] if a special one exists
 
<!--*Name the [http://www.hl7.org/listservice/index.cfm? project listserv] if a special one exists
 
-->
 
-->

Revision as of 06:39, 4 January 2013


Project Page for HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm)

Return to Public Health and Emergency Response

Project Information

Create a Release 2 of the HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, (US Realm).

In addition, this effort will align the ELR IG to the Laboratory Results Interface ( LRI ) IG, but also harmonize LRI wth the ELR .

This project would include the following work products:

  • 1) A document: HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
  • 2) Profile to constrain “Version 2.5.1 Implementation Guide: Laboratory Results Interface for US Realm, Release 1 HL7 Version 2.5.1: ORU^R01 Draft Standard for Trial Use” (LRI DSTU) to conform with HL7 Version 2.5.1 Implementation Guide: Electronic Laboratory Reporting to Public Health, Release 2 (US Realm).
  • 3) Associated message profiles


Specific Features and Functions include:

  • 1) IG document
  • 2) Message profiles
    • a. Implementation profile for base ORU-R01

Name the project facilitators

Link to project scope statement

file (waiting for CGIT approval)


Status

  • PSS reviewed and approved by PHER and OO, awaiting review by CGIT at Jan WGM
  • IG in Draft stage, see link below

Issues/Hot Topics

Project Documents