This wiki has undergone a migration to Confluence found Here
Difference between revisions of "ICTC May 2010 WGM Agenda"
Jump to navigation
Jump to search
Frankoemig (talk | contribs) (inntial draft) |
Frankoemig (talk | contribs) m (adjustment during Mon Q1) |
||
Line 102: | Line 102: | ||
<td>v2.8</td> | <td>v2.8</td> | ||
<td>Review v2.8 Chapter 2B with proposals <br/> | <td>Review v2.8 Chapter 2B with proposals <br/> | ||
− | (602 605 606 612 613 614) included | + | (602 605 606 612 613 614) included<BR> |
+ | How to write implementation guides? (Starting with v2, but broadening the scope) | ||
</td> | </td> | ||
<td>IC</td> | <td>IC</td> | ||
Line 125: | Line 126: | ||
<td>[[Image:Technical_med.gif|right|Technical Meeting]]</td> | <td>[[Image:Technical_med.gif|right|Technical Meeting]]</td> | ||
<td>v2.8</td> | <td>v2.8</td> | ||
− | <td> | + | <td>Tools (up for discussion): <br/>(MWB (Pete Rontey) - not this time)<br/> AHML (Jane) <br/> NIST (Rob) - IHE Pre-connectathon demo and Testing Infrastructure Plans<br>Testing Environment Whitepaper</td> |
<td>IC</td> | <td>IC</td> | ||
<td> </td> | <td> </td> | ||
Line 196: | Line 197: | ||
<td>Q3</td> | <td>Q3</td> | ||
<td>[[Image:Technical_med.gif|right|Technical Meeting]]</td> | <td>[[Image:Technical_med.gif|right|Technical Meeting]]</td> | ||
− | <td> | + | <td>-</td> |
− | <td> | + | <td></td> |
<td>IC</td> | <td>IC</td> | ||
<td> </td> | <td> </td> | ||
− | <td> | + | <td>-</td> |
− | <td> | + | <td>-</td> |
</tr> | </tr> | ||
<tr> | <tr> |
Revision as of 12:42, 17 May 2010
proposed IC Agenda for the 16-21 May 2010 WGM in Rio de Janeiro, Brazil
Return to Implementation_and_Conformance_TC#Meeting_Agendas page.
The rooms are requested according to this schedule!
Day | Time | Icon | Ver. | Event | Host | joining | Chair | Scribe | |
Sunday | AM | Q1 | |||||||
Q2 | |||||||||
PM | Q3 | ||||||||
Q4 | |||||||||
Day | Time | Icon | Ver. | Event | Host | joining | Chair | Scribe | |
Monday | AM | Q1 | Administriva: approve agenda |
IC | Jane | Rob | |||
Q2 | v2.8 | Review v2.8 Chapter 2B with proposals (602 605 606 612 613 614) included |
IC | Frank | Jane | ||||
Lunch | V3 Impl | Implementation Lunch (informal) | IC | ||||||
PM | Q3 | v2.8 | Tools (up for discussion): (MWB (Pete Rontey) - not this time) AHML (Jane) NIST (Rob) - IHE Pre-connectathon demo and Testing Infrastructure Plans Testing Environment Whitepaper |
IC | Frank | Rob | |||
Q4 | |||||||||
Day | Time | Icon | Ver. | Event | Host | joining | Chair | Scribe | |
Tuesday | AM | Q1 | v3 | Refinement Constraints and Localization (RCnL) document for improvements new codes for profiles: "Required for Initiator" and "Required for Consumer" |
IC | Frank | Jason | ||
Q2 | EAF: conformance (ECCF) Planning for Sept. 2010 in Cambridge |
IC | ArB (Charlie Mead) | Jason | Frank | ||||
Lunch | V3 Impl | Implementation Lunch (informal) | IC | ||||||
PM | Q3 | - | IC | - | - | ||||
Q4 | |||||||||
Day | Time | Icon | Ver. | Event | Host | joining | Chair | Scribe | |
Wednes- day | AM | Q1 | |||||||
Q2 | |||||||||
Lunch | V3 Impl | Implementation Lunch (informal) | IC | ||||||
PM | Q3 | ||||||||
Q4 | joint tsc | TSC | IC | ||||||
Day | Time | Icon | Ver. | Event | Host | joining | Chair | Scribe | |
Thursday | AM | Q1 | V3 | Binding Syntax: Requirements | Vocab | IC | - | - | |
Q2 | |||||||||
Lunch | V3 Impl | Implementation Lunch (informal) | IC | ||||||
PM | Q3 | ||||||||
Q4 | |||||||||
Day | Time | Icon | Ver. | Event | Host | joining | Chair | Scribe | |
Friday | AM | Q1 | |||||||
Q2 | |||||||||
PM | Q3 | ||||||||
Q4 |